162 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
41 of 162 active projects
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore A-Cam
This project proposes installing 5,631 feet of fiber optic near Butte Valley Airport, and another 4,740 feet south of the airport. Actions for the underground conduit install would require cable plow and directional boring within the existing right of way.
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
📍 Goosenest Ranger District 🏷 Special use management Added: 2026-06-26
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Buckhorn Project
Vegetation management, fuels management, and aquatic restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
📍 Tonasket Ranger District 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management Added: 2026-06-15
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Colville National Forest
49 Degrees North Mountain Resort Enhancement
New bike park and alpine roller coaster for summer use. Expansion of snowmaking to include additional terrain and reservoirs. Modification of 4 ski trails to improve access. Construction of Saddle Lodge and restrooms.
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
📍 Newport Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Boulder Park Ecological Resotration Project
placeholder
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog supplemental
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Chewelah A-Z
Placeholder
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Harvey Creek Subwatershed Restoration
placeholder
Learn About Thinning
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Leclerc Creek Grazing Allotment Management Planning
Analyze the options for management of grazing in the LeClerc Creek drainage.
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
📍 Sullivan Lake Ranger District 🏷 Grazing management Added: 2026-05-28
Cancelled
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
Uncategorized
Uncategorized
Colville National Forest
Meadow Lakes
Placeholder
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Meadow Maintenance
Maintain Meadows by removing encroaching conifers and maintaining infrastructure (e.g. exclosures, boulders).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
📍 Newport Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Quartz
Up to 2,900 acres of forest health treatments, about 4 miles of hand and machine fireline to support prescribed fire underburning, about 3 miles of temporary road access to treatment units, reconstruction of about 5 miles of existing non-system road templates (all 8 miles would be decommissioned).
Learn About Wildfire Learn About Thinning
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Slate
Improve forest health and resilience to disturbance through 13,000 acres of forest thinning, and improve aquatic and wildlife habitat with over 6 miles of instream restoration projects.
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Sweet-Ione Integrated Resources Improvement Project
Create a range of forest structural stages that supports resilience and is compatible with characteristic disturbance processes (wildland fire, insects and diseases), and supports aquatic and terrestrial habitat conditions and associated species.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Sxwuytn-Kaniksu Connections (Trail) Project
This is a multi-faceted project focusing on restoring healthy forests, connecting lands and people, improving watershed function, and providing economic stability.
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Tacoma Creek Salvage
Salvage trees within previously identified units of the Swamp Creek sale area that burned in the Tacoma Creek Fire.
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Tonata Trout
A project to conduct vegetation and fuels management, meadow restoration, aquatic restoration, and other work in the Tonata Trout project area.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Recreation management · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Upper West Branch LeClerc Creek fish Management Structure
Installation of a fish management structure on Upper West Branch LeClerc Creek for the purpose of non-native trout eradication by WDFW and Kalispel Tribe
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
Discovery Day Mine
The Discovery Day Mins is an established mine site that consists of a road, three working pads, and underground tunnels. A Plan of Operations has been proposed to mine the Discovery Day claim
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. Project details: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
📍 Klamath National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
McKinney Fire Restoration EA_Veg/Fuels
The McKinney Fire Restoration EA is proposed within and adjacent to the 2022 McKinney Fire footprint with the purpose of increasing wildfire resilience on the landscape. Proposed activities include a variety of fuels reduction treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Oak Knoll Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
Seiad Restoration Thin
The project will treat 3,350 acres within the 4,648-acre project boundary for fire risk reduction and community and resource protection within the Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
📍 Klamath National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
South Fork
The South Fork project is an active management project with the purpose of addressing hazardous fuels conditions along roads and private property, as well as aligning with Executive Order 14225, Immediate Expansion of American Timber Production.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Klamath National Forest All Units 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
Restorative Impact
Restorative Impact
Klamath National Forest
Windler Bar Habitat Enhancement
There is a need to enhance both fisheries and riparian habitat within the Project area, which is known to host rearing and spawning at-risk salmon. The purpose of this project is to address several critical elements of long-term restoration goals for salmon habitat and water quality.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
Breiland Slough Cabin Replacement
Proposal to replace the existing Breiland Slough public use recreation cabin and improve access to the site.
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
📍 Petersburg Ranger District 🏷 Recreation management Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
Significant Effect
Significant Effect
Tongass National Forest
Continuation of Zarembo Minerals Plan of Operations 2023 to 2024
Proposal to continue authorizing exploration activities by Zarembo Minerals Co. on Zarembo Island until July 2023. Activities to continue include surface exploration and drilling, use of a closed spur road, and onsite storage of drilling equipment.
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Wrangell Ranger District 🏷 Minerals and geology Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD 2025 Chichagof Small Sales
To make 70 acres available for community access to small-scale timber sales utilizing ground-based logging systems without the use of heavy machinery to harvest. Multiple small sales provide for opportunities for harvest of firewood, sawlogs and other timber products for commercial use.
Learn About Thinning
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD Millrock Exploration Corp - Apex El Nido Project
The activity for the Apex-El Nido Exploration project entails conducting hard rock exploration through diamond core drilling. It is anticipated a maximum of 15 holes will be drilled.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF KMRD South Revillagigedo Integrated Resource Project
The Forest Service is proposing a multi-year project involving a variety of timber harvest, road construction, watershed restoration and recreation activities.
Learn About Thinning
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
📍 Ketchikan - Misty Ranger District 🏷 Forest products · Recreation management · Road management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Deer Lake Coho Rearing Facility Permit Re-Issuance (NSRAA)
Re-issue special use permit for coho rearing facility- run by NSRAA
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Hidden Falls Fish Hatchery Alaska Department of Fish and Game
Re-Issue of special use permit for a salmon hatchery run by Northern Southeast Regional Aquaculture Association.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF TBRD Twin Mountain II Timber Sale
The proposed action is expected to produce about 26.8 million board feet of timber from approximately 1,655 acres of National Forest System lands in the Staney and Red Bay areas within the Thorne Bay RD. Other activities include road construction, reconstruction, maintenance and decommissioning.
LFDC Commented Learn About Thinning
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
📍 Thorne Bay Ranger District 🏷 Forest products · Road management Added: 2026-05-28
Developing Proposal
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF Tongass National Forest Land Management Plan Revision
Land management plan revision for the Tongass National Forest under the 2012 Planning Rule.
LFDC Commented
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Tongass National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date