415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
53 of 415
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD 2026 Harbor Mountain USGS Landslide Monitoring Equipment
Monitoring equipment includes a fiberglass electronics enclosure, mounted rain gauge, a Temp/RH sensor and three instrumented soil profiles. The monitoring equipment functions year-round with occasional maintenance. The USGS is requesting authorization to have the equipment on site for 10 years.
📍 Sitka Ranger District 🏷 Special use management Added: 2026-06-16
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Five Green Restoration Project
The project purpose is thinning stands less than 80 years old in order to enhance and accelerate old-growth conditions in Late Successional Reserve and Matrix areas. There are commercial thinning actions as well as road work, invasive weed treatments, and slash disposal.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Central Coast Ranger District-ODNRA 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Siuslaw National Forest
Forest Plan Amendment for Wilderness Management
Updating standards, guidelines, and other Forest Plan components for stewardship of the Siuslaw's four wilderness areas. Responding to changed conditions since Forest Plan approval, including designation of new wilderness in 2019.
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Special area management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Integrated Invasive Species Project
This project would develop a strategy that allows an array of tools to be used for reducing invasive weeds across the Siuslaw NF. One component would add four new chemicals to approved use list, requiring a plan amendment. https://bit.ly/3RT9D4e
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Wildlife, fish, rare plants · Vegetation management (other than forest products) · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Long Term Development of a Plan to Restore Vehicular Access to Cascade Head via FSR 1861
To re-establish safe vehicular access to upper Cascade Head and stabilize landslide impacted areas from a 2021 landslide.
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
📍 Hebo Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Marys Peak Thatch Burning Project
This project is intended to remove built-up thatch produced from a large patch of treated creeping velvetgrass (Holcus mollis) by mowing, burning, and other actions and to revegetate these sites with native plants sourced exclusively from Marys Peak.
Learn About Wildfire Learn About Thinning
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
North Fork Smith Restoration
This is a landscape-scale terrestrial restoration project in the North Fork Smith River watershed area. Activities include: plantation thinning, wildlife habitat enhancement, invasive plant treatments, and road improvements.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Siuslaw National Forest
ODNRA South Jetty and Eel Creek Water Systems
Drinking water system replacement at Eel Creek Campground and South Jetty Area. Work at this facility would include waterline and treatment system replacement and well rehabilitation.
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Oregon Dunes National Recreation Area OHV Sound Limit Forest Plan Amendment
Forest Plan amendment proposal to increase the sound limit for ORVs to more nearly match those of Oregon State DEQ limits.
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Sand Lake Restoration Project
This is a landscape-scale restoration project in the Sand Lake watershed. Activities include: plantation thinning, fish and wildlife habitat enhancement, invasive plant treatments, road and recreation improvements, and sand dune restoration.
Learn About Wildfire Learn About Thinning
📍 Hebo Ranger District 🏷 Recreation management · Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Yamina (Yamhill-Willamina) Restoration Project
The Yamina project will focus on commercial thinning to support development of old growth characteristics for the future in the Yamhill-Willamina Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
📍 Hebo Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
Amalga Trail Reconstruction - Sections 3 through 6
Improve Amalga Trail from mile 1.45 to mile 5.56, known as sections 3 to 6. Other improvements include improving signage, and establishing several rest areas along the trail.
📍 Juneau Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Tongass National Forest
Bad Day Creek Restoration
Remove culverts and replace with new structures at 2 sites, add large wood to stream channel and remove aggregate fill from the floodplain. Hand crews would complete most of the work, but heavy equipment and blasting may be needed to remove culverts.
📍 Yakutat Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Breiland Slough Cabin Replacement
Proposal to replace the existing Breiland Slough public use recreation cabin and improve access to the site.
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
📍 Petersburg Ranger District 🏷 Recreation management Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
Uncategorized
Uncategorized
Tongass National Forest
Cannon Beach Cabin Construction
Proposal to convert a developed campsite within the Yakutat Beach Recreation Area into a public use recreation cabin site.
📍 Yakutat Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Tongass National Forest
Cannon Beach Parking Expansion
Expand existing parking lot, add new parking areas, and construct about 750 feet of new road to improve traffic flow and user safety, and meet capacity demands at the Cannon Beach Recreation Site.
📍 Yakutat Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Chichagof Old-Growth Blowdown Salvage Sale
Proposed salvage timber sale within in a blow down area adjacent to NFS road 8530. The harvest area would include 3 units and provide approximately 88 thousand board feet of timber from about 25 acres.
Learn About Thinning
Thousand Board Feet 88
Acres (approx.) 25
📍 Hoonah Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Thousand Board Feet 88
Acres (approx.) 25
Significant Effect
Significant Effect
Tongass National Forest
Continuation of Zarembo Minerals Plan of Operations 2023 to 2024
Proposal to continue authorizing exploration activities by Zarembo Minerals Co. on Zarembo Island until July 2023. Activities to continue include surface exploration and drilling, use of a closed spur road, and onsite storage of drilling equipment.
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Wrangell Ranger District 🏷 Minerals and geology Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Restorative Impact
Restorative Impact
Tongass National Forest
Cube Cove Restoration
Following the purchase of 22,890 acres, the District proposes to restore and preserve wilderness character in the Cube Cove portion of the Kootznoowoo Wilderness through re-establishing hydrologic function.
Acres 22,890
📍 Admiralty Island National Monument 🏷 Watershed management · Wildlife, fish, rare plants · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Completed
Acres 22,890
Uncategorized
Uncategorized
Tongass National Forest
False Bay Cabin New Construction
Construct a new recreation cabin at False Bay, on Chichagof Island, approximately 25 miles from Hoonah Alaska on FS Road 8530. Proposed features include: cabin, vault toilet, woodshed, picnic table/fire ring, parking area, access trails and buoy.
📍 Hoonah Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Greens Creek North Extension Project
Hecla Greens Creek Mining Company proposes to extend the existing dry-stack tailings disposal facility and incorporate waste rock co-disposal techniques in a northward direction for additional tailings and waste rock storage capacity.
📍 Admiralty Island National Monument 🏷 Minerals and geology Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Hecla Greens Creek Mining Company Surface Exploration 2026-2030
Hecla Greens Creek Mining Company proposes to extend their surface exploration authorization by five years and incorporate new areas of interest.
📍 Admiralty Island National Monument 🏷 Minerals and geology Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Helicopter Pad Reconstruction
Replace and improve three helicopter pads at the existing Etolin, Farragut, and Fools radio repeater administrative sites.
📍 Wrangell Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Herbert Glacier Cabin
Construct a new recreation cabin accessible to the public by helicopter or by foot via a 4.4-mile hike on the Herbert Glacier Trail. Other infrastructure includes a vault-style outhouse, a gathering area, a helicopter landing site and access trails.
📍 Juneau Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Herbert River - Installation of Environmental Monitoring Equipment
Installation and maintenance of 1 stream gauge and 2 meteorological stations to gather environmental data in support of the New Amalga Gold Mine.
📍 Juneau Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Juneau Ranger District Office to Bunkhouse Telecom Cable Connection
Install an underground Forest Service-owned and operated fiber optic cable between the district office building and Bunkhouse A, and between Bunkhouses A and B.
📍 Juneau Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Kake Redcedar Transplant
Annually, for the next 5 yrs, extract 200 to 300 native western redcedar seedlings growing on the roadbed of National Forest System road 6041. Plant along the Kake road system in areas disturbed by management activities. Only handtools would be used.
📍 Petersburg Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Maybeso Potable Water System Replacement
Replace the potable water system for several Forest Service administrative buildings and a small school. Includes improvement of water reservoir, channel spillway and filtration treatment system.
📍 Craig Ranger District 🏷 Facility management · Research Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Tongass National Forest
Mendenhall Glacier Visitor Facility Improvements
Constructing facility improvements within the Mendenhall Glacier Recreation Area to accommodate anticipated visitor growth.
📍 Juneau Ranger District 🏷 Recreation management · Special area management · Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Tongass National Forest
Nemo Road Stabilization
Approximately 5 miles of FS Road 6265 (Nemo-Skip Loop Road) & associated culverts will be repaired. Current wood waste road base will be replaced with more stable gravel surface, as well as other activities associated with road stabilization.
📍 Wrangell Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Pats Lake Shelters
Construct a group shelter and three-sided shelter at existing roadside day use sites adjacent to Pats Lake. Both sites would include a vault toilet and parking area.
📍 Wrangell Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Pats Lake Trail Extension
Construct 1/2 mile of trail to connect existing Pats Creek Trail to National Forest System road 6259. Construction includes aggregate, concrete steps and elevated boardwalk. Up to three spur trails proposed leading to wildlife viewing platforms.
📍 Wrangell Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF ANM Hecla Greens Creek Mine Treated Wastewater Outfall Line 002A 2026
Hecla Greens Creek Mining Co. proposes to install 14-inch dia. 1474-foot long treated water outfall pipeline, within their existing, permitted 30' wide ROW on NFS lands.
📍 Admiralty National Monument 🏷 Minerals and geology · Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD 2025 Chichagof Small Sales
To make 70 acres available for community access to small-scale timber sales utilizing ground-based logging systems without the use of heavy machinery to harvest. Multiple small sales provide for opportunities for harvest of firewood, sawlogs and other timber products for commercial use.
Learn About Thinning
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD Millrock Exploration Corp - Apex El Nido Project
The activity for the Apex-El Nido Exploration project entails conducting hard rock exploration through diamond core drilling. It is anticipated a maximum of 15 holes will be drilled.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF JRD 2026 Bonnie Brae Trail Rehabilitation
Bonnie Brae Trail Rehabilitation project will rehabilitate and harden an existing trail mostly within the existing trail prism, except where minor reroutes or switchbacks are needed. This trail connects the Bonnie Brae area to Treadwell Ditch Trail.
📍 Juneau Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF JRD Glacial outburst flood barrier along Backloop Road 2026
Due to the increasing annual glacial outburst flood event, the City and Borough of Juneau proposes emergency flood barrier construction of either HESCO barriers or a berm/levee parallel to the north of Backloop Road extending approximately 1,500 feet east of the bridge on state ROW and NFS lands.
📍 Juneau Ranger District 🏷 Land management planning Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF KMRD 2026 Deer Mountain Trail Maintenance
Project will complete trail maintenance and repairs on the Deer Mountain Trail from the trailhead to the first overlook, a distance of approximately one mile. Trail maintenance may include brushing and logging out the trail, and cleaning culverts and drainage ditches.
📍 Ketchikan - Misty Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF KMRD South Revillagigedo Integrated Resource Project
The Forest Service is proposing a multi-year project involving a variety of timber harvest, road construction, watershed restoration and recreation activities.
Learn About Thinning
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
📍 Ketchikan - Misty Ranger District 🏷 Forest products · Recreation management · Road management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD 2026 Remote Admin Camp Improvements
Improvements at the existing False Island and Corner Bay administrative sites.
📍 Sitka Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Deer Lake Coho Rearing Facility Permit Re-Issuance (NSRAA)
Re-issue special use permit for coho rearing facility- run by NSRAA
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Hidden Falls Fish Hatchery Alaska Department of Fish and Game
Re-Issue of special use permit for a salmon hatchery run by Northern Southeast Regional Aquaculture Association.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF TBRD 2026 North Thorne Bay State Access
This project includes construction of 1 new temporary road on Forest Service lands and reconstruction of 1 existing temporary road on Forest Service lands for easement access to State of Alaska planned timber sales. Anticipated timing is summer FY26 & FY27.
📍 Thorne Bay Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF TBRD Twin Mountain II Timber Sale
The proposed action is expected to produce about 26.8 million board feet of timber from approximately 1,655 acres of National Forest System lands in the Staney and Red Bay areas within the Thorne Bay RD. Other activities include road construction, reconstruction, maintenance and decommissioning.
LFDC Commented Learn About Thinning
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
📍 Thorne Bay Ranger District 🏷 Forest products · Road management Added: 2026-05-28
Developing Proposal
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF Tongass National Forest Land Management Plan Revision
Land management plan revision for the Tongass National Forest under the 2012 Planning Rule.
LFDC Commented
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Tongass National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF YRD 2026 Alsek River Special Use Facilities
Proposal to modify an existing permitted use within the authorized area, with minor additions and improvements to existing facilities.
📍 Tongass National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF YRD 2026 Italio River Special Use Facilities
Proposal to modify an existing permitted use within the authorized area, with minor additions and improvements to existing facilities.
📍 Tongass National Forest 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF YRD 2026 Yakutat Community Needs
The overall objective of this project is to create a small-scale timber sale opportunity that benefits local operators and sawmills, while addressing ongoing environmental and safety issues. In addition to utilizing the naturally available salvage material, the project will facilitate access to the
Learn About Thinning
📍 Yakutat Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Southside Helicopter Sale
The Thorne Bay Ranger District is proposing to harvest approximately 125 acres of old growth live trees due to interest received from a prospective purchaser located on Prince of Wales Island. The area is 10 miles south of Naukati.
Learn About Thinning
Acres of Old Growth 125
📍 Thorne Bay Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of Old Growth 125
Uncategorized
Uncategorized
Tongass National Forest
Taku Inlet Monitoring Equipment Special Use Permit
Request from the US Border Patrol for a 10-year special use permit to install and maintain cameras to monitor vessels entering and exiting the Taku Inlet.
📍 Juneau Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Temporary Storage Sites for Neck Lake Road Reconstruction
Proposal to establish 5 temporary storage and stockpile sites on National Forest System land in support of the Neck Lake Rd reconstruction project. Site areas total about 3.25 acres. Materials and improvements would be removed upon permit expiration.
Acres (approx.) 3.25
📍 Thorne Bay Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Acres (approx.) 3.25
Significant Effect
Significant Effect
Tongass National Forest
Thorne Bay Basin Integrated Resource Management Project
This project would improve wildlife habitat, provide commercial young-growth harvest opportunities, implement riparian and road restoration activities in the project areas, as well as to provide support for employment and economic growth.
Learn About Wildfire Learn About Thinning
📍 Thorne Bay Ranger District 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Watershed management · Road management · Climate change adaptation Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Whale Pass Young Growth Small Sales
Harvest approximately 70 acres of live young-growth trees.
Learn About Thinning
Acres (approx.) 70
📍 Thorne Bay Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres (approx.) 70