The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
47 of 415
Significant Effect
Significant Effect
Taking Comments Now! 6/29/26 11:59 PM PDT
Umatilla National Forest
Battle Bruin Integrated Vegetation Management Project
This project proposes to restore a healthy, diverse, and resilient forest ecosystem and create defensible fuel breaks for use during wildfire emergencies through the use of mechanical and non-mechanical thinning and fuels treatments, reforestation, and seeding and planting of native plants.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
2 Days Left to Comment
Taking Comments Now! 6/29/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore A-Cam
This project proposes installing 5,631 feet of fiber optic near Butte Valley Airport, and another 4,740 feet south of the airport. Actions for the underground conduit install would require cable plow and directional boring within the existing right of way.
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
📍 Goosenest Ranger District 🏷 Special use management Added: 2026-06-26
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Umatilla National Forest
54 North Fuels Reduction and Huckleberry Restoration Project
To restore resilience in dry upland forests by protecting old trees, reducing surface fuels, reducing overall forest density, and shifting composition from intolerant to fire tolerant species. Improve habitat for huckleberry.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Fuels management · Heritage resource management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Blue Mountains Forest Plan Revision
Land Management Plan revision for the Malheur, Umatilla, and Wallowa-Whitman National Forests, which will provide management direction on approximately 4.9 million acres of public lands. https://www.fs.usda.gov/r06/umatilla/planning/blue-mountains-forest-plan-revision
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
📍 Umatilla National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Bone Point Planting CE
In accordance with the National Forest Management Act of 1976, this project proposes to replant trees in areas burned by the 2024 Bone Point Fire, where stocking levels have fallen below Umatilla National Forest Plan requirements.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Double Snag Planting CE
The proposed action is to plant ponderosa pine, Douglas-fir, western larch, and western white pine seedlings by hand on 107 acres of the Double Snag fire burn scar. This will be non-RHCA planting.
Learn About Wildfire Learn About Thinning
Acres of The Double Snag Fire Burn Scar 107
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of The Double Snag Fire Burn Scar 107
Significant Effect
Significant Effect
Umatilla National Forest
Ellis Integrated Vegetation Project
The Ellis Project is being developed to improve wildlife habitat, restore resiliency against insect/disease and wildfire, protect values at risk, provide timber products, and enhance public and traditional land uses.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
FSR 47 Chipseal
There is a need to complete repairs initiated after the 2020 flood and resurfacing the existing 8 miles of asphalt pavement to provide a smooth-running surface for the portion of NFSR 47 that accesses the Forest Service land.
📍 Umatilla National Forest All Units 🏷 Road management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Umatilla National Forest
Forestwide Aquatic Restoration
Aquatic restoration on public and private lands within the boundary of the UNF and/or adjacent lands in boundary-spanning 5th HUC watersheds where restoration activities would benefit or help achieve Forest Service aquatic restoration goals.
📍 Umatilla National Forest All Units 🏷 Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Lane Creek Drilling Survey
Proponent requesting to drill 5 holes 8" in diameter to depths of 15-50 feet to survey the location of bedrock to best determine stream channel design for culvert upgrade at Lane Creek and Highway 244.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Lone Rock Post Fire Recovery CE
Address hazardous fuel conditions and insect outbreaks caused by the 2024 Lone Rock fire by creating a fuel break and reducing excess fuel loads. Regenerate areas of forest cover where viable seed sources of desired tree species are insufficient.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Mottet Vegetation Management Project
Vegetation management project for stand structure and composition, socioeconomics by providing timber products.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Mt. Misery Snowshelter Relocation
Mt. Misery Snowshelter proposed to be moved to reduce ongoing impacts and comply with NHPA.
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
📍 Pomeroy Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Pearson Tract Lot 1A Expansion (SUP)
Increase footprint from 562 sq. ft. by adding an additional 16%u2019x16%u2019 to the back side (southwest side) of the cabin bringing the total footprint of the cabin to 818 sq. ft., well below the 1,200 sq. ft. maximum.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Penland Lake Water Tank
Install 2000 gallon holding tank and 425 feet of waterline attached to private well to gravity feed 3 private cabins adjacent to FS Lands.
📍 Umatilla National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Summit Road Fuels Reduction
The project would reduce fuels and improve forest health along the strategic control features of Forest Roads 31 (Summit Road) and 32 (Dry Creek).
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
Tiger-Mill
The Tiger-Mill Project is being proposed to protect the Mill Creek Municipal Watershed and restore ecosystem processes and functions that foster landscape diversity and achieve desired vegetation conditions.
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Top Road Fuel Break (CE)
Top Road Fuelbreak Project is located in the Lower Big Wall Creek and Cupper Canyon-North Fork John Day River watersheds. The constructed fuelbreak will run along roadways and existing fire break on National Forest Service lands.
Learn About Wildfire Learn About Thinning
📍 Umatilla National Forest All Units 🏷 Fuels management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Umatilla National Forest
Tucannon Watershed Restoration Projects
Activities are planned to correct areas compromised by 2020 flood event, 2022 post-Green Ridge fire event and identified restoration needs. Activities include bank stabilization, culvert and road repair under the Forestwide Aquatics EA (47428).
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 01/1970 (Estimated)
Implementation 07/2025 (Estimated)
📍 Umatilla National Forest All Units 🏷 Watershed management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 01/1970 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Umatilla National Forest
Zulu Post Fire Rehabilitation CE
This project will regenerate forest stands in burned areas that no longer have viable seed source for desired tree species. Treatments may include removing vegetation and planting seedlings in prepared areas.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Five Green Restoration Project
The project purpose is thinning stands less than 80 years old in order to enhance and accelerate old-growth conditions in Late Successional Reserve and Matrix areas. There are commercial thinning actions as well as road work, invasive weed treatments, and slash disposal.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Central Coast Ranger District-ODNRA 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Siuslaw National Forest
Forest Plan Amendment for Wilderness Management
Updating standards, guidelines, and other Forest Plan components for stewardship of the Siuslaw's four wilderness areas. Responding to changed conditions since Forest Plan approval, including designation of new wilderness in 2019.
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Special area management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Integrated Invasive Species Project
This project would develop a strategy that allows an array of tools to be used for reducing invasive weeds across the Siuslaw NF. One component would add four new chemicals to approved use list, requiring a plan amendment. https://bit.ly/3RT9D4e
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Wildlife, fish, rare plants · Vegetation management (other than forest products) · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Long Term Development of a Plan to Restore Vehicular Access to Cascade Head via FSR 1861
To re-establish safe vehicular access to upper Cascade Head and stabilize landslide impacted areas from a 2021 landslide.
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
📍 Hebo Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Marys Peak Thatch Burning Project
This project is intended to remove built-up thatch produced from a large patch of treated creeping velvetgrass (Holcus mollis) by mowing, burning, and other actions and to revegetate these sites with native plants sourced exclusively from Marys Peak.
Learn About Wildfire Learn About Thinning
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
North Fork Smith Restoration
This is a landscape-scale terrestrial restoration project in the North Fork Smith River watershed area. Activities include: plantation thinning, wildlife habitat enhancement, invasive plant treatments, and road improvements.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Siuslaw National Forest
ODNRA South Jetty and Eel Creek Water Systems
Drinking water system replacement at Eel Creek Campground and South Jetty Area. Work at this facility would include waterline and treatment system replacement and well rehabilitation.
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Oregon Dunes National Recreation Area OHV Sound Limit Forest Plan Amendment
Forest Plan amendment proposal to increase the sound limit for ORVs to more nearly match those of Oregon State DEQ limits.
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Sand Lake Restoration Project
This is a landscape-scale restoration project in the Sand Lake watershed. Activities include: plantation thinning, fish and wildlife habitat enhancement, invasive plant treatments, road and recreation improvements, and sand dune restoration.
Learn About Wildfire Learn About Thinning
📍 Hebo Ranger District 🏷 Recreation management · Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Yamina (Yamhill-Willamina) Restoration Project
The Yamina project will focus on commercial thinning to support development of old growth characteristics for the future in the Yamhill-Willamina Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
📍 Hebo Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Alert California Wildfire Cameras
Installation and operation of wildfire camera system at 11 lookout sites.
📍 Klamath National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore IMA 2502
Cal-Ore Communication is proposing to place a telecommunication cable and appurtenances in and around the Macdoel and Tenant area. This new fiber optic cable would upgrade existing telecommunications and internet services.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore Reconnect 3
The project proposes to install and operate approximately 8.19 miles of new fiber optic communications cables and ancillary facilities in non-continuous routes within the project area.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Discovery Day Mine
The Discovery Day Mins is an established mine site that consists of a road, three working pads, and underground tunnels. A Plan of Operations has been proposed to mine the Discovery Day claim
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Gate Installation and Seasonal Road Closure on FS Road 46N73
Installation of a seasonal gate on Forest Service Road 46N73. New special use permit. Water Board Waiver n/a.
📍 Happy Camp Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Goosenest Developed Recreation Sites Fuels Reduction Project
Remove hazardous fuels from within and around all developed recreation sites on the Goosenest Ranger District.
Learn About Wildfire Learn About Thinning
📍 Klamath National Forest All Units 🏷 Recreation management · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. Project details: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
📍 Klamath National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
Restorative Impact
Restorative Impact
Klamath National Forest
Large Wood Loading and Floodplain Restoration Phase II
Implement recovery actions for Federally listed Coho Salmon in Mid-Klamath tributaries (Horse Trough Creek Floodplain). Waterboard waiver B and 401/404 permits.
📍 Happy Camp Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
McKinney Fire Restoration EA_Veg/Fuels
The McKinney Fire Restoration EA is proposed within and adjacent to the 2022 McKinney Fire footprint with the purpose of increasing wildfire resilience on the landscape. Proposed activities include a variety of fuels reduction treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Oak Knoll Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Middle Mile Broadband Initiative
This project is proposing to use Federal funding to provide broadband access to rural communities. Using Federal funds to place fiber optic lines in the existing right-of-way corridor is the only viable way to provide residents with broadband.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Klamath National Forest
River Complex Post Fire Restoration
This project was created to respond to conditions created by the 2021 River Complex Fires and to reflect the changes in post fire conditions. This project includes site preparation, prescribed burning, reforestation, and sediment reduction activities
Learn About Wildfire Learn About Thinning
📍 Salmon River Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Seiad Restoration Thin
The project will treat 3,350 acres within the 4,648-acre project boundary for fire risk reduction and community and resource protection within the Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
📍 Klamath National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Klamath National Forest
South End
Vegetation management and fuels reduction project with watershed restoration, resource protection, and public safety aspects. Water Board Waiver Category B expected.
Learn About Wildfire Learn About Thinning
📍 Goosenest Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
South Fork
The South Fork project is an active management project with the purpose of addressing hazardous fuels conditions along roads and private property, as well as aligning with Executive Order 14225, Immediate Expansion of American Timber Production.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Klamath National Forest All Units 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Klamath National Forest
Tennant Waterline
This project proposes to replace approximately two miles of water pipeline and two water troughs in the Bray cattle allotment on the Goosenest Ranger District.
📍 Goosenest Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Klamath National Forest
Windler Bar Habitat Enhancement
There is a need to enhance both fisheries and riparian habitat within the Project area, which is known to host rearing and spawning at-risk salmon. The purpose of this project is to address several critical elements of long-term restoration goals for salmon habitat and water quality.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date