415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
73 of 415
Significant Effect
Significant Effect
Taking Objections Now! 7/31/26 11:59 PM PDT
Willamette National Forest
Dead Mountain
Timber harvest, small diameter fuels reduction, roadside fuels reductions, burn blocks, and recreation management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
34 Days Left to Comment
Taking Objections Now! 7/31/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2022 ODOT rock stockpile
Expand the Santiam Pass Oregon Department of Transportation (ODOT) rock disposal site by 5 acres and build a short connecting road to the Santiam sand shed. Accomplished by blading away native soil and vegetation with standard earth moving equipment.
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2023 Big Lake Youth Camp
McKenzie River Ranger District is proposing to authorize the operators of Big Lake Youth Camp (BLYC) to conduct several site improvements.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
2024 McKenzie River Trail Connector
McKenzie River Ranger District wants to complete construction of a short trail connection between the newly installed trail bridge at the Deer Creek to Forest Service Road 2654 in support of the McKenzie River National Recreation Trail #3507.
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
2024 Monkey Flower Research Weather Station
This project will provide weather data to support a long-running research project on the Monkey flower. A small weather station will be installed by digging a hole approximately the size of a 5-gallon bucket and filling it with cement to anchor it.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
2024 Peek Thin
The McKenzie River Ranger District is proposing approximately 109 acres of variable density thinning in three 46 to 48 year old plantation stands. Treatment would consist of thinning, dominant tree release, gaps up to 3 acres, and unthinned skips.
Learn About Thinning
Acres of Variable Density Thinning In Three 46 109
Acres (approx.) 3
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of Variable Density Thinning In Three 46 109
Acres (approx.) 3
Uncategorized
Uncategorized
Willamette National Forest
2024 USGS Pit Tag Application
The USGS will install a Passive-Integrated-Transporter (PIT) tags in the South Fork of the McKenzie River, upstream from Cougar Reservoir. It will operate in association with an existing USGS stream gage.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Bado Thin
The Detroit Ranger District proposes to commercially thin approximately 33 acres in a plantation stand that is 65 years old. The purpose of the project is to increase stand health and vigor and provide timber to the local economy.
Learn About Wildfire Learn About Thinning
Acres (approx.) 33
📍 Detroit Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres (approx.) 33
Uncategorized
Uncategorized
Willamette National Forest
Big Lake Boat Launch
The McKenzie River Ranger District is proposing to add a temporary dock to the boat launch at the Big Lake Campground Boat Launch. The proposed dock will be a temporary dock that can be pulled in and out each season.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Willamette National Forest
Bingham Bridge Floodplain Restoration
Vegetation would be removed and large wood would be placed in the floodplain while reconnecting side channels. Heavy equipment would be used to cut high areas and fill low areas while trying to maintain as much established vegetation as possible.
📍 Middle Fork Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Blair Lake Campground Fire Recovery
We are proposing to remove damaged trees at the Blair Lake Campground that were affected by the Cedar Creek Fire. The campground was heavily impacted by the fire and is currently closed to public access due to the dangerous conditions.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Willamette National Forest
Breitenbush Subsoiling and Floodplain Restoration
The Breitenbush floodplain restoration will improve watershed and habitat conditions affected by historic management actions, the 2020 Beachie-Lionshead Fires, and subsequent post-fire emergency actions.
📍 Detroit Ranger District 🏷 Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
CF Thin
The McKenzie River Ranger District is proposing approximately 125 acres of variable density thinning in three 65-70 year old plantation stands.
Learn About Thinning
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Cala-Wiley
The district proposes to treat 899 acres of under 80 plantations using thinning, dominant tree releases, gap creation, and skips then fuel treatments.
Learn About Wildfire Learn About Thinning
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Calloway
This project area encompasses 45,041 acres and is located on the McKenzie River and Sweet Home Districts of the Willamette National Forest north of Blue River, Oregon. Harvest units are in two sub watersheds, with 281 units totaling 5,886 acres.
Learn About Wildfire Learn About Thinning
Acres 45,041
Acres 5,886
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres 45,041
Acres 5,886
Uncategorized
Uncategorized
Willamette National Forest
Campground Host Site Improvements
Underground plastic holding tanks would be installed at many campgrounds within 10 feet of trailer pad. If the current host site is unsuitable, a new site could be selected. Parking barriers would be installed to prevent driving over tanks.
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
Cedar Creek Fire Trail Bridge Replacements
The purpose of this project is to return two stream crossings on the Jim Weaver Loop to a useable and safe state for public use. The Dam Camp and Elbow Lake bridges were burned in the 2022 Cedar Creek Fire and are now a hazard for public use.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Clark Creek Organizational Camp Hazard Tree Removal
The purpose of this project is to remove damaged trees at Clark Creek Organizational Campground that was affected by the 2023 Bedrock Fire.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Cowhorn Trail Cutoff
Oregon Cascades Recreation Area remains disconnected between the west and east sides as it stands. No bike-legal single track route exists from the popular Timpanogas area to the Windy Lakes. This proposed cutoff will create better connectivity.
MilestoneDate
Scoping Start 05/09/2018
Decision 06/2024 (Estimated)
Implementation 07/2024 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/09/2018
Decision 06/2024 (Estimated)
Implementation 07/2024 (Estimated)
Restorative Impact
Restorative Impact
Willamette National Forest
Devils Creek and Breitenbush Forks post-fire Cabins Rebuild
In 2020, the Lionshead Fire destroyed 70 recreation residences (cabins) on the Devil's Creek and Breitenbush Forks tracks. This project is to allow the rebuild of the fire-destroyed cabins, where appropriate.
MilestoneDate
Scoping Start 08/2023 (Estimated)
Decision 05/2024 (Estimated)
Implementation 05/2025 (Estimated)
📍 Detroit Ranger District 🏷 Recreation management · Special area management · Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/2023 (Estimated)
Decision 05/2024 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Divide
This project would commercially harvest about 1,918 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes meadow restoration and sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
📍 Willamette National Forest 🏷 Forest products · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
In Progress
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
Significant Effect
Significant Effect
Willamette National Forest
Fall Creek
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Fish Lake Fire Resilience
The purpose of this project is to reduce the abundance of ladder fuels and canopy densities adjacent to Fish Lake Historic Site that is within the Wildland Urban Interface (WUI).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Flat Country Floral Greens Project
This project would remove floral greens: beargrass, salal, fern fronds, and vine maple/ceanothus sticks. This would occur on approximately 28,523 acres of the McKenzie River Ranger District. The sell of these products will be done under permits.
Learn About Thinning
Acres of The Mckenzie River Ranger District 28,523
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of The Mckenzie River Ranger District 28,523
Mixed Impact
Mixed Impact
Willamette National Forest
Forest System Road 2209 Segment Repair
The District is proposing to return a 3.2 mile segment of FSR 2209 between the Opal Creek trailhead and Jawbone Flats to pre-Beachie Creek Fire condition. Road work may include culvert replacement, drainage repair, and incidental hazard tree removal.
📍 Detroit Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Hazard Tree Removal at Developed Recreation Sites
The proposed action is to fall hazardous trees at developed recreation sites within the portions of the Detroit Ranger District burned by the Beachie Creek and Lionshead fires of 2020.
📍 Detroit Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Ivy Cliff
This project would commercially harvest about 2037 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes road density management, fuels improvement, sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Detroit Ranger District 🏷 Forest products · Land management planning · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lava Parks
Commercial harvest, rock pit expansion, meadows within units, Lava View Loop Viewpoint.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Little Owl Small Sale
Treat proposed units using a combination of commercial thinning, gaps, skips, and dominant tree release.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lowell Country Project
The project includes thinning of ~15,900 net acres of managed stands under 80 years of age to improve stand growth/vigor and to produce a sustainable supply of forest products, as well as maintain, store and/or decommission ~650 miles of roads.
Learn About Wildfire Learn About Thinning
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Willamette National Forest
Middle Fork Fire Affected Roads Project
Reduce the risks posed by fire-killed and injured trees that have fallen across or remain standing along important access routes of the Cedar Creek, Gales and Bedrock fire-affected road system. (Formerly known as Cedar-Gales Roadside Risk Reduction)
Learn About Wildfire Learn About Thinning
📍 Middle Fork Ranger District 🏷 Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Monkeyflower Weather Stations
A special use permit has been requested by the University of Louisiana at Lafayette to install four weather stations around the common monkeyflower sites to monitor temperature and soil moisture.
📍 Sweet Home Ranger District 🏷 Research Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Post Fire Planting
Post-fire tree planting to reforest existing and future wildfire impacted areas to meet desired conditions for forest cover.
Learn About Wildfire Learn About Thinning
📍 Willamette National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Roadside Hazardous Fuels Reduction
The Detroit Ranger District is proposing to create fuel breaks to reduce hazardous fuels on strategic roads across the District: 10, 1012, 2212, 2236, and low severity burn sections of 2231 and 2233.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
📍 Detroit Ranger District 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Scott Lake Parking Improvements
The project is proposing to create additional parking locations for a high use campground and trailhead.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Willamette National Forest
Soda Fork Large Wood Enhancement
Improve spawning and rearing habitat in Soda Fork Creek for Upper Willamette Winter Steelhead and Spring Chinook that are listed as Threatened under the Endangered Species Act and improve stream complexity in Soda Fork Creek.
📍 Sweet Home Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Willamette National Forest
South Fork Delta Restoration Expansion
This project will expand the the restoration area initially included in the 2018 Lower South Fork McKenzie River Floodplain Enhancement Project Environmental Assessment and provide recreational opportunities near the Delta Campground area.
📍 McKenzie River Ranger District 🏷 Watershed management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Willamette National Forest
South Santiam Tree Tipping
The project objective is to improve stream habitat to aid recovery of the Endangered Species Act listed Upper Willamette Winter Steelhead and Spring Chinook Salmon by tipping approximately 25 trees into the South Santiam River.
📍 Sweet Home Ranger District 🏷 Wildlife, fish, rare plants Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Station Butte
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Steeple Rock Rigdon
Thinning with skips and gaps in about 3,200 acres, meadow restoration, floodplain restoration, roadside fuels reductions, dispersed campsite reconfiguration, travel management, and quarry development.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,200
📍 Middle Fork Ranger District 🏷 Recreation management · Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres (approx.) 3,200
Uncategorized
Uncategorized
Willamette National Forest
Strube Flats Fire Camp
This project would establish a permanent site for accommodating fire camps, and secure the site from motor vehicles by installing four gates at the entrances.
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Sunny Thin
The McKenzie River Ranger District is proposing to treat approximately 63 acres located in four stands. Stands #1-3 are approximately 30 years old, whilestand #10 is approximately 110 years old.
Learn About Wildfire Learn About Thinning
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Supplemental EA for 2020 Fire Affected Road System Risk Reduction
Allow ground-based equipment to operate outside of the road prism to conduct fire killed and injured tree felling previously authorized by the 2020 Fire Affected Road System Risk Reduction project #61749.
Learn About Wildfire Learn About Thinning
📍 Willamette National Forest All Units 🏷 Forest products · Fuels management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Upper Canyon
The district proposes to treat 1,069 acres of under 80 stands using thinning, dominant tree release, gap creation, and skips. Meadows would be restored and fuels treated.
Learn About Wildfire Learn About Thinning
Acres 1,069
📍 Sweet Home Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Acres 1,069
Uncategorized
Uncategorized
Willamette National Forest
West Fork 8th Creek OHV Trail Bridge Replacement
The purpose of this project is to rebuild the West Fork 8th creek trail bridge. The bridge has failed and collapsed. There is a need for the bridge to be replaced to enhance user safety and protect natural resources.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Youngs Rock Rigdon
Forest management treatments are proposed on approximately 6,500 acres within the project area. Treatment proposed include thinning, early seral creation, fuel reduction, habitat restoration, system road management, recreation management.
Learn About Wildfire Learn About Thinning
Acres (approx.) 6,500
📍 Middle Fork Ranger District 🏷 Recreation management · Heritage resource management · Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres (approx.) 6,500
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Antlers Resort Marina 20-Year Permit Issuance
Issuance of a new 20-year special use authorization (permit) to replace the existing permit which will allow for continued operation and management of Antlers Resort Marina. No changes will be made to currently authorized operations or facilities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Ash Creek Forest Health and Fuels Reduction Project
The Shasta-Trinity National Forest proposed the Ash Creek Forest Health and Fuels Reduction project to address high stand densities, on-going insect and disease outbreaks, and wildfire risk. Project information is available at: https://usfs-public.box.com/s/wqgxkuomwx42lfx6f31owbqoep2w5jyi
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 McCloud Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Shasta-Trinity National Forest
Beegum Watershed Restoration
Road-related improvements, including road decommissioning and safe OHV recreation opportunities, in the Beegum Creek Watershed of the Shasta-Trinity National Forest.
MilestoneDate
Scoping Start 05/04/2011
Comment Period 08/2020 (Estimated)
Objection Period Start 01/2021 (Estimated)
Decision 05/2021 (Estimated)
Implementation 06/2021 (Estimated)
📍 Yolla Bolla Ranger District 🏷 Recreation management · Watershed management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 05/04/2011
Comment Period 08/2020 (Estimated)
Objection Period Start 01/2021 (Estimated)
Decision 05/2021 (Estimated)
Implementation 06/2021 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Big Ranch Community Risk Reduction
The Project designed to reduce the risks associated with high intensity wildfire and improve forest health and function through forest thinning, reduction of hazardous fuels, reforestation and prescribed fire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Bowerman Cooperative Fuel Break Project
The purpose of the Project is to increase the effectiveness of fuel breaks and fuel reduction projects across ownership boundaries, to improve forest health and function, and to improve ingress and egress for firefighters and the public.
Learn About Wildfire Learn About Thinning
📍 Weaverville Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Carlson Road Construction Authorization
Issuance of a special use permit to authorize a private landowner to construct a new access road that would be 2,337 feet long by 30 feet wide on National Forest System lands. Road location is within the Backbone Inventoried Roadless Area.
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Corral Gulch Restoration
The FS will work with the Watershed Center of Hayfork, CA to restore floodplain function, raise the groundwater table, increase streamflow, decrease water temperatures, and decrease erosion and sedimentation, ultimately improving wildlife habitat.
Learn About Wildfire Learn About Thinning
📍 Hayfork Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Gemmill Thin
Thinning and fuels reduction to enhance and protect late successional habitat.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Hyampom Community Wildfire Risk Reduction Project
This project proposes to reduce wildfire risk to the community of Hyampom and improve forest resiliency through forest thinning, reduction of hazardous fuels and prescribed fire to reestablish natural fire regimes.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Junction City Community Risk Reduction Project PALS #68960
e Project is being designed to lower high- severity wildfire risk to the community of Junction City by reducing hazardous fuels around the community and improving forest health and resilience.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Weaverville Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. For more information, visit: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Lakehead and Platina Transfer Stations Permit Reauthorization
Issue new special use permit to Shasta County to replace expiring permits. There will be no changes to the authorized facilities or increases in the scope or intensity of authorized activities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Lava Roads Repair Project
The Forest plans to improve, realign, and decommission project roads to establish a minimum and efficient transportation system and address safety, accessibility, and maintenance concerns.
📍 Mt. Shasta Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Minersville Boat Launching Facility Improvements
Remove existing asphalt boat ramp & replace with a two-lane, concrete, v-grooved, low-water ramp with turn-arounds & sidewalk. Add parking area above high water mark of Trinity Lake. Replace existing restroom with new restroom. Widen access driveway.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
North Trinity Community Risk Reduction
The proposed project is designed to reduce risk to rural communities from catastrophic wildfire by reducing hazardous fuels, increasing safety adjacent to critical egress/ingress routes, and improving the resiliency of forested ecosystems.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment -- Antler 12kV Powerline Undergrounding Phases 1, 1.2, 1.3, and 2
Authorize the use and occupancy of National Forest System lands for PG&E's Antler 1101 1384 Phases 1, 1.2, 1.3 and 2 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019 ("Master Permit").
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6
Authorize the use and occupancy of NFS lands for PG&E's Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PGE Hogback Microgrid 30-Year Permit Issuance
Issuance of a 30-year special use authorization to PG&E for construction, operation & maintenance of a remote microgrid on Hogback Mountain to replace the existing source of service via the existing Pit No. 7 1101 electric distribution 12KV line.
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Parks-Trinity Fuelbreak Project
The Forest plans to create a linear fuelbreak approximately 500 feet on either side of FS 17 Road to help protect the wildland-urban interface and establish safe routes for the public and firefighters in a wildfire situation.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Pit/Curl Cooperative Fuel Break Project
Create linear fuel breaks to modify future fire behavior and connect fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire while also reducing risk to nearby communities. For project documents, visit: https://usfs-public.box.com/s/7oxlzaz0ebn7zb1fjs9amje8izehgqwf
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Root Fire Hazard Abatement Project
The project is proposed to recover the economic value of fire impacted stands, reduce the risk from roadside hazards, accelerate forest recovery, and reduce the likelihood and intensity of a reburn. Project information is available at - https://usfs-public.box.com/s/al78orqta5ilowffv2snxq4ie6y0eemm
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
📍 Mt. Shasta Ranger District 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Shasta-Trinity National Forest Outfitter/Guide Temporary and Priority Permit Authorizations
The Shasta-Trinity National is amending its process for authorizing outfitter and guide permits and will issue both temporary permits (authorizes use for less than one year) and priority permits (authorizes use for ten years).
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
South Fork Motorized Trail Project
Up to 19-miles of motorized user created trails would be added to the system. These trails would be constructed and maintained to Forest Service standards.
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
South Fork Sacramento Public Safety and Forest Restoration Project
Establish fuel management zones; thin trees; reduce fuels; restore meadows; develop new/expand existing campgrounds & parking; establish trailheads & trails; & repair riparian/habitat damage.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Recreation management · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Trinity Divide / Lakehead Cooperative Fuel Break Project
Creation of linear fuel breaks to modify future fire behavior and connect with fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire and reduce risk to communities. For project documents visit: https://usfs-public.box.com/s/6a1i45z4za8fpq24158rf0mhjhresu8d
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
Restorative Impact
Restorative Impact
Shasta-Trinity National Forest
Trinity River Watershed Restoration Project
The purpose of the project is to enhance quality and quantity of accessible cold-water aquatic habitat and water temperature conditions, and decrease fine sediment loading through watershed restoration activities in the Trinity River watershed.
📍 Shasta Trinity National Forest All Units 🏷 Wildlife, fish, rare plants · Watershed management · Climate change adaptation Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP)Project
The Trinity Public Utilities District and the Western Area Power Administration (lead Federal agency) propose a right-of-way expansion and vegetation management project to reduce fire risk to the surrounding communities. STNF is a cooperating agency.
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)