415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
29 of 415
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
25 Road Fuel Break
. The project would establish and maintain fuel breaks along the 25 Road that tie together recent Upper Briggs project (signed in 2019) area treatments to the old Taylor-Klondike Fire control lines and Rum Creek Fire contingency lines
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 01/10/2023
Decision 11/2023 (Estimated)
Implementation 03/2024 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/10/2023
Decision 11/2023 (Estimated)
Implementation 03/2024 (Estimated)
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
AT&T Cell Tower Replacement
Crown Castle (Agent for AT&T) is proposing to replace 80 foot existing self-support tower with a 150 foot self-support tower to provide elevation and space for equipment for 4 wireless communication providers and other users requesting collocation.
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
Dutchman Radio Building
Installation of a freestanding radio building to store radio equipment. Repair/replacement of Radio tower that was damaged during storms during the winter. Move and install ODF solar panels South of the Dutchman Lookout living quarters.
MilestoneDate
Scoping Start 06/20/2023
Decision 02/2027 (Estimated)
Implementation 06/2027 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Facility management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 06/20/2023
Decision 02/2027 (Estimated)
Implementation 06/2027 (Estimated)
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Moon Fire Recovery
The project will fell and remove hazard trees and reduce fuel loading in critical linear fuel management zones, perform site preparation for reforestation and plant site appropriate conifer seedlings.
Learn About Wildfire Learn About Thinning
📍 Gold Beach Ranger District 🏷 Forest products · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Mt. Ashland Ski Lift Replacement
To replace two lifts Areil and Windsor,which are aging lifts that are no longer repairable. Replacing the two lifts will increase safety and reliability, increase operational efficiency and inprove winter-sport infrastructure.
Learn About Wildfire Learn About Thinning
📍 Rogue River-Siskiyou National Forest All Units 🏷 Recreation management · Vegetation management (other than forest products) · Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
North Fork Diamond Bridge Replacement
Replacement of the North Fork Bridge that was burned in the Smith River complex fire.
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
📍 Wild Rivers Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Snowy Butte Landscape Restoration Project
The District is proposing a vegetation and watershed restoration project in collaboration with the Medford Watershed Commission to support fire resiliency and forest health in spring-fed water supply of the Big Butte Springs Municipal Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
📍 High Cascades Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Special area management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Thompson Creek Fuel Break
Treatments will reduce fuels and protect large residual trees by manually cutting brush and select live trees eight-inch DBH and under, ten-inch DBH and under of dead trees, hand piling, and pile burning within the project footprint.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Yellowjacket
The Yellowjacket Project aims to reduce hazardous fuels, and foster a more fire, insect, and disease resilient forest. This project will help to protect vulnerable communities from catastrophic wildfires by tying into past treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Baker City Watershed Fuels Management Project
The purpose of this project is to reduce hazardous fuels between the Baker City Watershed and nearby private land.
Learn About Wildfire Learn About Thinning
📍 Whitman Ranger District 🏷 Forest products · Fuels management · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Buckhorn Radio Shelter and Tower Replacement
A radio communication tower and associated radio shelter need to be replaced due to their poor conditions.
📍 Wallowa-Whitman National Forest All Units 🏷 Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Bull Run Restoration Geotechnical Analysis CE
Bull Run Meadows Restoration Project geotechnical analysis of current subsurface substrates in mine waste piles. Excavation of a trench 8-10 feet deep, 3 feet wide and 12 feet long. Total disturbance will be less than 1/10th acre.
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Wallowa-Whitman National Forest All Units 🏷 Wildlife, fish, rare plants · Minerals and geology Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Deer Creek Trail Bridge
The North Phillips Lake Trail #1608 parallels State Hwy 7 at Deer Creek Bridge. Currently there is no hiker/bike bridge there. The area is near a state right-of-way. dev of a new foot/bike bridge over Deer Creek will eliminate a hazard
MilestoneDate
Scoping Start 03/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 10/2023 (Estimated)
📍 Whitman Ranger District 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 03/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 10/2023 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry DFPZ
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry Defensible Fuels Profile Zone
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Meadow Creek Watershed Restoration
Hazardous fuel reduction, watershed restoration, and research
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Morgan Nesbit Forest Resiliency Project
The purpose of the Project is to conduct restoration management activities to improve forest resiliency and sustainability and improve hydrologic functioning, thereby moving the landscape toward the goals, objectives, and desired future condition(s).
Learn About Wildfire Learn About Thinning
📍 Wallowa Valley Ranger District 🏷 Forest products · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Mt. Emily OPB Permit Renewal
Renewal of an existing Special Use Permit
📍 La Grande Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
ODOT Summit Point Communication Site, SUP PIN201802
Renewal of communication tower lease.
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
PacifiCorp Mt. Emily SUP
Permit renewal for PacifiCorp's existing Mt. Emily site.
📍 La Grande Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Powder River Mining
Analyze proposed mining plans of operations within the Powder River watersheds.
📍 Whitman Ranger District 🏷 Minerals and geology Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Race Cow Project
Improve forest resilience, reduce hazardous fuels, enhance native grasslands, improve road access, develop two rock pits, reduce sediment delivery, provide timber products. Requesting EAD under IIJA, comment period per IIJA offered if granted.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Salmon River Ranger District 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Red Cougar Integrated Vegetation Management
Hazardous fuels reduction using prescribed burning, commercial and noncommercial thinning.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Sufferin' Springs Vegetation Management Project
Hazardous fuels reduction within stands at high risk for insect and disease out break as well as a high risk fireshed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Upper Breshears Trailhead Relocation
Relocate the Breshears trailhead to an existing rock pit with better access to improve safety and an anticipated increase in use.
📍 Wallowa-Whitman National Forest All Units 🏷 Recreation management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Wallowa-Whitman National Forest
Upper Grande Ronde River Mine Tailings Restoration
Redistribute waste rock from dredge mining along 2 miles of the Upper Grande Ronde River and relocate approximately 1 mile of road to improve floodplain conditions.
📍 La Grande Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
West Wall Defensible Fuels Profile Zone
Establish and maintain fuel breaks to reduce the risk of uncharacteristic wildfire within the Carson/Pine Valley Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
📍 Whitman Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed