415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
51 of 415
Mixed Impact
Mixed Impact
Taking Objections Now! 7/1/26 11:59 PM PDT
Olympic National Forest
Canyon Forest Restoration
Proposed Action proposes variable density thinning of forest stands in a manner that progresses towards development of late-successional forest wildlife habitat, while protecting existing habitat. Harvesting activities are estimated to be 36% ground-based harvest, 23% cable yardin
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
📍 Olympic National Forest 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
4 Days Left to Comment
Taking Objections Now! 7/1/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
2025 Mt. Baker Geothermal Consent to Lease
To explore or develop geothermal resources on National Forest lands, the USFS must consent to lease areas nominated by the BLM. This analysis does not authorize ground disturbance, but creates stipulations for authorized leasing areas. https://usfs-public.box.com/s/r56gzyn1msyfvj8md81arv1mo15tgoso
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
📍 Mt. Baker Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Baker River Watershed Landscape Analysis
This landscape-scale analysis would improve ecological conditions, enhance recreational opportunities, provide forest products to support local economies, and maintain public access to valuable resources.
Learn About Thinning
Acres (approx.) 106,000
MilestoneDate
Scoping Start 11/2025 (Estimated)
Comment Period 06/2026 (Estimated)
Objection Period Start 10/2026 (Estimated)
Decision 02/2027 (Estimated)
Implementation 05/2027 (Estimated)
📍 Mt Baker Ranger District 🏷 Recreation management · Wildlife, fish, rare plants · Forest products · Road management Added: 2026-05-28
On Hold
Acres (approx.) 106,000
MilestoneDate
Scoping Start 11/2025 (Estimated)
Comment Period 06/2026 (Estimated)
Objection Period Start 10/2026 (Estimated)
Decision 02/2027 (Estimated)
Implementation 05/2027 (Estimated)
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Big Four Boardwalk Replacement
Project proposal would replace 750 feet of boardwalk within the footprint of the original trail.
📍 Darrington Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Deception Falls Trail Bridge Replacements
Replacement of 2 failing bridges with new bridges in more sustainable locations, with trail reroutes leading to the new locations. Bridges 70'-80' in length each, with about 750' of new trail total.
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
📍 Skykomish Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
FSR 6020-110, Lake Serene Trailhead, Lake Serene Trail Temporary Closure Order NEPA
A temporary closure of National Forest System Road (FSR) 6020-110, the Lake Serene Trailhead, the entire length of the Lake Serene Trail, including the Bridal Veil Falls Trail.
📍 Skykomish Ranger District 🏷 Regulations, directives, orders Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Forestwide Thinning Analysis
This analysis will streamline the implementation of commercial thinning treatments designed to increase structural diversity of overstocked and planted stands and provide a sustainable flow of timber to local communities.
LFDC Commented Learn About Thinning
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Green Mountain Trail Re-route
The project would relocate 1600 feet of trail. The project would reduce grade and create safer terrain for hikers. The reduction in grade would also promote vegetation health along the trail, by minimizing impacts of erosion.
📍 Darrington Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Heather Lake Trail Bridge Replacement
Replacement in place of girder substructure and decking on the Heather Lake Trail at the outflow into Heather Creek.
📍 Darrington Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Heather Meadows Native Plant Restoration
Revegetation of degraded alpine meadow areas at a popular hiking area using native plant species. Installation of minimal visitor barriers (rebar, rope) to prevent trampling of revegetated areas.
Learn About Wildfire Learn About Thinning
📍 Mt Baker Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Horseshoe Bend Bypass for Deadhorse Project Access
The proposed action is to construct a bypass route around a road failure on FSR 37 to reestablish access to the Deadhorse Road Relocation Project area.
📍 Mt. Baker Ranger District 🏷 Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Martin Gap Restoration Thinning Project
This project aims to restore forest health and resilience, improve wildlife habitat, and support native plants that are important to Tribal communities by thinning and diversifying previously regenerated plantation stands.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
📍 Snoqualmie Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Middle Fork Recreation Hub Project
Construct 1700' trail to Otter Falls. Construct 1.3mi Garfield Ledges trail starting at intersection of Rd 56/5640. Construct trail Mid Fork trailhead (TH) to Taylor R. bridge; add picnic sites.
📍 Snoqualmie Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Mt. Baker Ranger District ERFO Road Repair Project (FSR 3040)
Repair of storm-damaged roads under the Emergency Response for Federally Owned Roads (ERFO) program, including Forest Service led repair of FS Road 3040 at MP 1.6.
📍 Mt Baker Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
North Fork Stillaguamish Landscape Analysis
Landscape scale analysis of habitat restoration, and actions to improve ecological conditions.
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
Restorative Impact
Restorative Impact
MBS, ONF, Okan-Wen, Colville
Pacific Northwest National Scenic Trail Comprehensive Plan
The Comprehensive Plan will develop administrative and management objectives and practices and desired conditions for the Pacific Northwest National Scenic Trail on public lands in Forest Service Regions 1 and Regions 6.
📍 R6 - Pacific Northwest Region All Units 🏷 Recreation management · Special area management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Panorama Point Boat Launch Improvements
Improve and maintain boat launching capabilities, provide improved toilet facilities and increase parking capacity to improve visitor safety at the Panorama Point boat launch.
📍 Mt Baker Ranger District 🏷 Recreation management · Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Skykomish District 2016 ERFO Road Repairs (FSR 6835)
Heavy rains during the winter of 2016 damaged FSR 6835 at MP 1.4, where soils became heavily saturated and caused a debris land slide. Project will remove the slide material, place base rock and surfacing, and add a cross drain culvert.
📍 Skykomish Ranger District 🏷 Road management · Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Snohomish County Search and Rescue Radio Repeaters
The Snohomish County Sheriffs Office Search and Rescue Unit operates and maintains repeaters at five locations in the Mt.Baker-Snoqualmie National Forest. This project seeks to allow the Sheriff's office to provide periodic maintenance and repairs.
📍 Darrington Ranger District 🏷 Special use management · Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Snoqualmie District 2016 ERFO Road Repairs-Gold Creek Trail Bridge
Repair of storm-damaged roads and trails in the Snoqualmie Ranger District, including Forest Service led repair work proposed for Gold Creek Trail Bridge. Additional repairs also led by Federal Highways Administration.
📍 Snoqualmie Ranger District 🏷 Road management · Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Snoqualmie District 2016 ERFO Road Repairs-NFS Road 50
Project to complete repairs of storm damage on NFS Road 50. Repairs would include embankment placement to grade to replace shoulder and roadway, including rock and root wad placement for bank stabilization, culvert cleaning, and road resurfacing.
📍 Snoqualmie Ranger District 🏷 Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Snoqualmie District 2016 ERFO Road Repairs-NFS Road 5078
Complete repairs of storm damage on NFS Road 5078. Repairs include removing woody debris and rock material out of the aggraded stream and rebuilding the road prism above the stream intersection.
📍 Snoqualmie Ranger District 🏷 Road management · Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Snoqualmie Lake trailhead improvements
Reconstruct the Snoqualmie Lake TH with additional and improved parking and add a toilet
📍 Snoqualmie Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Sound Salmon Solutions Riparian Restoration 2024
Sound Salmon Solutions staff will install approximately 9,000 total native plants in the riparian buffer of the South Fork Skykomish River in 5 separate parcels. Post-planting maintenance and monitoring will ensure survival of plants.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 10/2024 (Estimated)
Implementation 01/2025 (Estimated)
📍 Skykomish Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 10/2024 (Estimated)
Implementation 01/2025 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
South Fork Canyon Creek Road Bridge Removal and Footbridge Install
Removal of the failed FSR 41 road bridge over the South Fork of Canyon Creek and removal of earth abutments in the creekbed to restore natural hydrologic flow. Construction of a footbridge for access to the area north of the creek for recreation use.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Darrington Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Stevens Pass Vault Toilet Installation
Stevens Pass Mountain Resort is replacing two long-term "temporary" porta-potties in parking lot #2 with 2 double-vault CXT prefabricated concrete toilets.
📍 Skykomish Ranger District 🏷 Recreation management · Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Tenas Creek Restoration Project
The Darrington Ranger District proposes to replace a bridge on the Suiattle River Road to improve an important Chinook Salmon run and restore important salmon habitat for species.
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
📍 Darrington Ranger District 🏷 Road management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
USGS Lahar Monitoring Stations
The U.S. Geological Survey-Cascades Volcano Observatory (USGS-CVO) has applied for a 20-year special use permit to install up to 5 new Lahar monitoring stations within the Carbon and White River drainages located to the NE of Mount Rainier volcano.
📍 Snoqualmie Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
WSU Wolverine and Lynx Camera Stations
Partners deploying camera stations across multiple forests to assess habitat range and distribution of Canada Lynx and Wolverine over a period of 20 years.
📍 Mt Baker-Snoqualmie National Forest All Units 🏷 Special use management · Research Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Olympic National Forest
Flood Damage Road Repairs
Proposed treatment of multiple sites along FS Roads 29, 30, 2922, and 2932 damaged in storm events. Range of activities proposed: debris clearing, culvert replacement, fill removal, bank stabilization, temporary bridges to restore access.
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Olympic National Forest All Units 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Restorative Impact
Restorative Impact
Olympic National Forest
Morganroth Springs Wetland Complex Fish Habitat Improvement
Project would remove derelict dam structure, conduct riparian thinning to support seasonal migration in and out of the pond by native anadromous fishes and encourage beaver recolonization.
📍 Olympic National Forest All Units 🏷 Wildlife, fish, rare plants Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Olympic National Forest
Mt Walker North Restroom Decommissioning
As part of sustainable recreation strategy and resource protection the two single-seat vault toilet structures at the north trailhead of Mt Walker would be removed and rehabilitated.
📍 Olympic National Forest All Units 🏷 Recreation management · Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Mixed Impact
Mixed Impact
Ochoco National Forest
3 Fires Reforestation Initiative
The Forest experienced 3 very large wildfires in 2024 which require reforestation though planting native fire-adapted tree species where regeneration is unlikely. Plantings would generally take place in areas that had greater than 75% mortality.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Day Wireless Gray Butte Tower Addition Special Use Permit
Day Management Corporation submitted an application to install a 60' support tower, foundation and ice bridge on the existing site. This would allow for transmitting and receiving wireless communication signals. ACCESS DOCUMENTS: https://usfs-public.box.com/s/p6wjo60fl9mal90ej8oo9tmtph0y3uaw
📍 Crooked River National Grassland 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Ochoco National Forest
Lower Derr Restoration
The project is to improve hydrologic conditions and aquatic habitat on portions of Jackson Creek and Derr Creek. Specific actions include beaver dam analogues, riparian planting, LWD placement, meadow encroachment reduction and buck and pole fence.
📍 Ochoco National Forest All Units 🏷 Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Ochoco National Forest
North Fork Crooked River Forest Resilience Project
The main project purpose is to improve forest resilience to disturbance events, like insect and disease outbreaks and wildfire, and to promote adaptation to drought conditions by reducing tree density and fuels loading.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Ochoco National Forest
Wiley Flat Roadside Hazard Tree Abatement
The Lookout Mountain Ranger District will reduce roadside hazards along approximately 21.7 miles open roads within the Wiley Flat wildfire area through commercial salvage. After further analysis, 2.6 more miles of roadside treatment were added.
📍 Lookout Mountain Ranger District 🏷 Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
62 Road Fuel Break
The 62 Roadside Fuel Break CE Project would address hazardous fuel conditions on approximately 305.97 contiguous acres adjacent to roadways
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
📍 Prairie City Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
Significant Effect
Significant Effect
Malheur National Forest
Emigrant Creek Ranger District Aspen Project
The purpose of this project is to improve and restore aspen communities within the boundary of the Emigrant Creek Ranger District of the Malheur National Forest.
Learn About Wildfire Learn About Thinning
📍 Malheur National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Malheur National Forest
Murderers Creek Wild Horse Joint Management Area, Herd Management Area Plan
Establish a Herd Management Area Plan including appropriate management level. Conduct population management actions (gather activities) to attain proposed population and habitat objectives for wild horses in the joint management area.
📍 Malheur National Forest All Units 🏷 Special area management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
North Fork Allotment Range Improvements and Maintenance
This project authorizes improvements and subsequent maintenance of range infrastructure on the North Fork allotment on the Prairie City Ranger District of the Malheur NF. These include spring developments, fencing, and water gaps.
📍 Prairie City Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Malheur National Forest
OTEC Power Pole Replacement Project
Replace existing wooden power poles with fire resistant Ductile Iron poles.
📍 Emigrant Creek Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
Upper Bear Lake
Promoting landscape resiliency within a complex disturbance regime of wildfire, drought, insects, and diseases, providing a road system that is environmentally and economically sustainable that moves toward access and resource management objectives.
Learn About Wildfire Learn About Thinning
📍 Prairie City Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Completed