415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
37 of 415
Mixed Impact
Mixed Impact
Taking Comments Now! 6/30/26 11:59 PM PDT
Los Padres National Forest
Wildfire Risk Reduction Project (formerly the Ecological Restoration Project) PALS # 62369
The project is designed to increase community/infrastructure protection, improve wildfire containment opportunities, and improve vegetation resilience to environmental stressors. A notice of Emergency Situation Determination approval has been posted. Comments will be accepted from June 24-30, 2026.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
📍 Los Padres National Forest 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
3 Days Left to Comment
Taking Comments Now! 6/30/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
Restorative Impact
Restorative Impact
Okanogan-Wenatchee National Forest
Frazer Creek BDA 2026
In Upper Frazer Creek on US Forest Service managed lands, the Methow Okanogan Beaver Project (MBP) proposes to support restoration of natural processes toward stream and floodplain connectivity, increased base streamflows, and climate resilience in the watershed.
MilestoneDate
NEPA Start Date 4/29/2026
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Special use management · Watershed management Added: 2026-06-24
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 4/29/2026
Finding/Decision Date
Restorative Impact
Restorative Impact
MBS, ONF, Okan-Wen, Colville
Pacific Northwest National Scenic Trail Comprehensive Plan
The Comprehensive Plan will develop administrative and management objectives and practices and desired conditions for the Pacific Northwest National Scenic Trail on public lands in Forest Service Regions 1 and Regions 6.
📍 R6 - Pacific Northwest Region All Units 🏷 Recreation management · Special area management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Canyon and Trout Creek Trail Bridge Replacements 2024
Replace damaged trail bridges at Jackita Ridge trail # 738 over Canyon Creek and W. Fork Methow trail #480 over Trout Creek.
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Methow Valley Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Chelan PUD Fiber Optic Installation Project
The project proposes aerial fiber optic installation, use, operation, and maintenance along roads within the existing transmission line right-of-way.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
📍 Wenatchee River Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Chumstick to LP Project
Landscape scale terrestrial restoration project.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/25/2023
Comment Period 08/2025 (Estimated)
Decision 12/2025 (Estimated)
Implementation 01/2026 (Estimated)
📍 Wenatchee River Ranger District 🏷 Fuels management · Watershed management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 09/25/2023
Comment Period 08/2025 (Estimated)
Decision 12/2025 (Estimated)
Implementation 01/2026 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Cougar Creek Danger Trees
The Forest Service is proposing the removal of dead trees within 150 feet of selected roads. Any tree that is dead, and is within 150 feet of the road, will be subject to removal regardless of species.
Learn About Wildfire Learn About Thinning
📍 Entiat Ranger District 🏷 Road management · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Eagle Creek Project
Commercial, non-commercial, and fuels activities to reduce wildfire risk, improve timber sands and forest structure, and improve wildlife habitat.
Learn About Wildfire Learn About Thinning
📍 Wenatchee River Ranger District 🏷 Forest products · Fuels management · Wildlife, fish, rare plants Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Entiat River Road, North Fork Entiat Road, Duncan Road, Shady Pass Danger Tree Removal
Removal of dead trees within 150 feet of selected roads to address potential of dead trees falling on vehicles or people and blocking ingress/egress.
📍 Entiat Ranger District 🏷 Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
FSR6910 Road Repair and maintenance
Project is to issue a road use permit to T-Mobile to complete light maintenance road repairs to FSR6910 to the communications site on Round Mountain.
📍 Wenatchee River Ranger District 🏷 Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Forest-wide Tree Seed Orchard Fire Protection Project
Maintain and protect developed tree seed orchards by thinning trees and maintaining fuel break in the surrounding 300 foot buffer.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
📍 Okanogan-Wenatchee National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
Restorative Impact
Restorative Impact
Okanogan-Wenatchee National Forest
Gold Creek Valley Restoration
A multi-partner effort to recover Gold Creek bull trout populations by correcting habitat conditions which create significant mortality, reconnecting the creek and floodplain, and restoring natural processes. Provide recreation at this valued site.
📍 Cle Elum Ranger District 🏷 Wildlife, fish, rare plants Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Icicle Creek Rockfall Mitigation project
Provide rockfall mitigation on up to three slopes on Icicle Creek Road from MP4.3 to 4.8. Project is scheduled to be completed Fall of 2023.
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
📍 Wenatchee River Ranger District 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Lower Lake Cle Elum Fuel Break Project
Establish linear fuel breaks around lower Lake Cle Elum to reduce the risk of uncharacteristic wildfire, incorporating existing linear features.
Learn About Wildfire Learn About Thinning
📍 Cle Elum Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Midnight Restoration
Landscape-scale wildfire risk reduction and terrestrial restoration project in Rader Creek, lower Wolf Creek, and upper Twisp River drainages. Excludes Lake Chelan-Sawtooth Wilderness.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Fuels management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Okanogan-Wenatchee National Forest
Mineral Creek Road Decommissioning
This project would decommission approx. 1 mile of FS-4600 (Mineral Creek Road), which would no longer be needed after the Upper Kachess River Restoration project constructs a new trailhead for the Mineral Creek Trail.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Comment Period 07/2025 (Estimated)
Objection Period Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Cle Elum Ranger District 🏷 Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 07/2025 (Estimated)
Comment Period 07/2025 (Estimated)
Objection Period Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Planning and Management of Domestic Sheep and Goat Grazing within the Range of Bighorn Sheep
Proposal to amend Land and Resource Management Plans to provide forest plan direction for managing domestic sheep and goat grazing within the range of Bighorn sheep to better provide for bighorn sheep viability in the context of range management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Okanogan-Wenatchee National Forest 🏷 Grazing management · Land management planning · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Okanogan-Wenatchee National Forest
Railroad Creek Driftwood Harbor Protection
Temporarily place 6-10 ecology blocks above OHW to deflect overbank flows from Railroad Creek away from a potential avulsion low spot that flows directly into Driftwood Harbor.
📍 Chelan Ranger District 🏷 Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
South Fork Tieton Prescribed Fire Project
Wildfire Crisis Strategy Project
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Naches Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Methow
Landscape-scale wildfire risk reduction and terrestrial restoration project in Goat Creek, Cub Creek and Lost River drainages using emergency authorities.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Swauk Restoration Project
Fuels & Forest Health EAD Project. Proposing forest restoration activities including commercial and non-commercial thinning, prescribed fire, fuels breaks, aquatic restoration activities, and transportation system changes.
Learn About Wildfire Learn About Thinning
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
📍 Cle Elum Ranger District 🏷 Forest products · Fuels management · Road management · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Wenatchee Mountain Alpine Huts Special Use Permit
Issue 2-year transitional priority use special use authorization for seasonal (winter) lodging facilities and outfitter guiding at DeRoux Campground, North Fork Teanaway River.
📍 Cle Elum Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
White Pass Ski Area - Chairlift 4 Replacement Project
White Pass proposes to replace the existing double chairlift with a new quad chairlift. The new lift would be installed in the same alignment as the current lift, with the same bottom and top terminal locations.
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Naches Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Los Padres National Forest
DOJ Tower Replacement at Tassajera Peak Communications Site
The US Department of Justice (DOJ) proposes to replace their existing 20' tower with a new 40' tower on an approximately 8' x 8' concrete pad within the existing footprint of the communications site, and enclosed by a new 22' x 28' security fence.
📍 Santa Lucia Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
East Camino Cielo Ignition Reduction Project
To improve the ecological condition of roadside environments and reduce the probability of ignitions. This will be accomplished by removing non-native grasses and herbs followed by native seeding and planting.
Learn About Wildfire Learn About Thinning
📍 Santa Barbara Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
Establishing Interim Direction for Oil & Gas Leasing Management
Amend the Los Padres Forest Plan and the Southern California Forest Plan to establish interim direction for processing new lease applications for oil and gas, and remove references to and withdraw the 2005 Oil and Gas Record of Decision. https://usfs-public.box.com/s/8hb9zdav0fv3huge15oga4bzaec0yji6
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
📍 Los Padres National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
Uncategorized
Uncategorized
Los Padres National Forest
King City Fire Station
Proposal to build a fire station to replace the Nacimiento Fire Station, which burned in the 2020 Dolan Fire. Proposed construction would occur on the King City administrative site, adjacent to the Monterey District Ranger Station. https://usfs-public.app.box.com/v/PinyonPublic/folder/364597850112
📍 Monterey Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Los Padres National Forest
Los Padres Flood Damage Repair, Road Maintenance, and Aquatic Passage Improvement Project
Flood Damage Repair, Road Maintenance and Aquatic Passage Improvement.
📍 Los Padres National Forest All Units 🏷 Wildlife, fish, rare plants · Watershed management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Los Prietos Helibase
The proposal is to construct a helicopter pad, associated safety facilities, and office space for the module within the lower compound at the Los Prietos Ranger Station.
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
📍 Santa Barbara Ranger District 🏷 Facility management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Los Padres National Forest
Manzana Creek Watershed Sediment Reduction Project
Fire and subsequent impacts from flooding and runoff have damaged existing drainage features. The Manzana Creek Watershed Sediment Reduction Project proposes to improve erosion control through erosion prevention treatments along several roads in the
📍 Santa Lucia Ranger District 🏷 Wildlife, fish, rare plants · Watershed management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
Mount Pinos Forest Health Project - PALS #58380
Healthy Forest thinning project designed to improve the health and vigor of the existing stands and to make the stands more resilient to stressors such as drought, insects & wildfire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
📍 Los Padres National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
Significant Effect
Significant Effect
Los Padres National Forest
Piru Creek Wild and Scenic River (WSR) - Comprehensive River Management Plan (CRMP)
In support of the CRMP for Piru Creek WSR, final documents are available for an objection period pursuant to Forest Service Regulations (36 CFR 218). See posted notice for background and instructions on submitting comments.
📍 Angeles National Forest All Units 🏷 Land management planning Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Pothole Trail (18W04) Reroute
Reroute 3.1 miles of the existing Pothole Trail from it's junction with Piru Canyon Road to the Sespe Wilderness boundary to create a more sustainable, user-friendly trailway that meets Forest Service trail standards.
📍 Ojai Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Renewal of expired Special Use Permit ORD12012
Renewal of an expired SUP of a 3" oil pipeline in the Sespe oil field, with no change to the facilities or scope of operation.
📍 Los Padres National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Los Padres National Forest
Rose Valley Creek Restoration Project
This proposal aims to restore Rose Valley Creek to its historical stream function, form, and habitat to benefit native aquatic species and armor Rose Valley creek from future wildfires by bolstering the riparian zone.
MilestoneDate
Scoping Start 05/11/2022
Comment Period 06/09/2022
Decision 05/2025 (Estimated)
Implementation 08/2026 (Estimated)
📍 Ojai Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/11/2022
Comment Period 06/09/2022
Decision 05/2025 (Estimated)
Implementation 08/2026 (Estimated)
Restorative Impact
Restorative Impact
Los Padres National Forest
Wheeler Gorge Campground Aquatic Organism Passage and Stream Restoration Project
This project will bolster campground crossing safety and provide aquatic organism passage by adding two bridges. During high flows four concrete crossings within the campground are dangerous for pedestrians and vehicles due to their smooth surfaces.
📍 Ojai Ranger District 🏷 Recreation management · Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed