415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
57 of 415
Mixed Impact
Mixed Impact
Taking Comments Now! 6/30/26 11:59 PM PDT
Los Padres National Forest
Wildfire Risk Reduction Project (formerly the Ecological Restoration Project) PALS # 62369
The project is designed to increase community/infrastructure protection, improve wildfire containment opportunities, and improve vegetation resilience to environmental stressors. A notice of Emergency Situation Determination approval has been posted. Comments will be accepted from June 24-30, 2026.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
📍 Los Padres National Forest 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
3 Days Left to Comment
Taking Comments Now! 6/30/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
Restorative Impact
Restorative Impact
MBS, ONF, Okan-Wen, Colville
Pacific Northwest National Scenic Trail Comprehensive Plan
The Comprehensive Plan will develop administrative and management objectives and practices and desired conditions for the Pacific Northwest National Scenic Trail on public lands in Forest Service Regions 1 and Regions 6.
📍 R6 - Pacific Northwest Region All Units 🏷 Recreation management · Special area management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Mixed Impact
Mixed Impact
Ochoco National Forest
3 Fires Reforestation Initiative
The Forest experienced 3 very large wildfires in 2024 which require reforestation though planting native fire-adapted tree species where regeneration is unlikely. Plantings would generally take place in areas that had greater than 75% mortality.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Day Wireless Gray Butte Tower Addition Special Use Permit
Day Management Corporation submitted an application to install a 60' support tower, foundation and ice bridge on the existing site. This would allow for transmitting and receiving wireless communication signals. ACCESS DOCUMENTS: https://usfs-public.box.com/s/p6wjo60fl9mal90ej8oo9tmtph0y3uaw
📍 Crooked River National Grassland 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Ochoco National Forest
Lower Derr Restoration
The project is to improve hydrologic conditions and aquatic habitat on portions of Jackson Creek and Derr Creek. Specific actions include beaver dam analogues, riparian planting, LWD placement, meadow encroachment reduction and buck and pole fence.
📍 Ochoco National Forest All Units 🏷 Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Ochoco National Forest
North Fork Crooked River Forest Resilience Project
The main project purpose is to improve forest resilience to disturbance events, like insect and disease outbreaks and wildfire, and to promote adaptation to drought conditions by reducing tree density and fuels loading.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Ochoco National Forest
Wiley Flat Roadside Hazard Tree Abatement
The Lookout Mountain Ranger District will reduce roadside hazards along approximately 21.7 miles open roads within the Wiley Flat wildfire area through commercial salvage. After further analysis, 2.6 more miles of roadside treatment were added.
📍 Lookout Mountain Ranger District 🏷 Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
62 Road Fuel Break
The 62 Roadside Fuel Break CE Project would address hazardous fuel conditions on approximately 305.97 contiguous acres adjacent to roadways
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
📍 Prairie City Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
Significant Effect
Significant Effect
Malheur National Forest
Emigrant Creek Ranger District Aspen Project
The purpose of this project is to improve and restore aspen communities within the boundary of the Emigrant Creek Ranger District of the Malheur National Forest.
Learn About Wildfire Learn About Thinning
📍 Malheur National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Malheur National Forest
Murderers Creek Wild Horse Joint Management Area, Herd Management Area Plan
Establish a Herd Management Area Plan including appropriate management level. Conduct population management actions (gather activities) to attain proposed population and habitat objectives for wild horses in the joint management area.
📍 Malheur National Forest All Units 🏷 Special area management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
North Fork Allotment Range Improvements and Maintenance
This project authorizes improvements and subsequent maintenance of range infrastructure on the North Fork allotment on the Prairie City Ranger District of the Malheur NF. These include spring developments, fencing, and water gaps.
📍 Prairie City Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Malheur National Forest
OTEC Power Pole Replacement Project
Replace existing wooden power poles with fire resistant Ductile Iron poles.
📍 Emigrant Creek Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
Upper Bear Lake
Promoting landscape resiliency within a complex disturbance regime of wildfire, drought, insects, and diseases, providing a road system that is environmentally and economically sustainable that moves toward access and resource management objectives.
Learn About Wildfire Learn About Thinning
📍 Prairie City Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
DOJ Tower Replacement at Tassajera Peak Communications Site
The US Department of Justice (DOJ) proposes to replace their existing 20' tower with a new 40' tower on an approximately 8' x 8' concrete pad within the existing footprint of the communications site, and enclosed by a new 22' x 28' security fence.
📍 Santa Lucia Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
East Camino Cielo Ignition Reduction Project
To improve the ecological condition of roadside environments and reduce the probability of ignitions. This will be accomplished by removing non-native grasses and herbs followed by native seeding and planting.
Learn About Wildfire Learn About Thinning
📍 Santa Barbara Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
Establishing Interim Direction for Oil & Gas Leasing Management
Amend the Los Padres Forest Plan and the Southern California Forest Plan to establish interim direction for processing new lease applications for oil and gas, and remove references to and withdraw the 2005 Oil and Gas Record of Decision. https://usfs-public.box.com/s/8hb9zdav0fv3huge15oga4bzaec0yji6
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
📍 Los Padres National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
Uncategorized
Uncategorized
Los Padres National Forest
King City Fire Station
Proposal to build a fire station to replace the Nacimiento Fire Station, which burned in the 2020 Dolan Fire. Proposed construction would occur on the King City administrative site, adjacent to the Monterey District Ranger Station. https://usfs-public.app.box.com/v/PinyonPublic/folder/364597850112
📍 Monterey Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Los Padres National Forest
Los Padres Flood Damage Repair, Road Maintenance, and Aquatic Passage Improvement Project
Flood Damage Repair, Road Maintenance and Aquatic Passage Improvement.
📍 Los Padres National Forest All Units 🏷 Wildlife, fish, rare plants · Watershed management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Los Prietos Helibase
The proposal is to construct a helicopter pad, associated safety facilities, and office space for the module within the lower compound at the Los Prietos Ranger Station.
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
📍 Santa Barbara Ranger District 🏷 Facility management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Los Padres National Forest
Manzana Creek Watershed Sediment Reduction Project
Fire and subsequent impacts from flooding and runoff have damaged existing drainage features. The Manzana Creek Watershed Sediment Reduction Project proposes to improve erosion control through erosion prevention treatments along several roads in the
📍 Santa Lucia Ranger District 🏷 Wildlife, fish, rare plants · Watershed management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
Mount Pinos Forest Health Project - PALS #58380
Healthy Forest thinning project designed to improve the health and vigor of the existing stands and to make the stands more resilient to stressors such as drought, insects & wildfire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
📍 Los Padres National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
Significant Effect
Significant Effect
Los Padres National Forest
Piru Creek Wild and Scenic River (WSR) - Comprehensive River Management Plan (CRMP)
In support of the CRMP for Piru Creek WSR, final documents are available for an objection period pursuant to Forest Service Regulations (36 CFR 218). See posted notice for background and instructions on submitting comments.
📍 Angeles National Forest All Units 🏷 Land management planning Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Pothole Trail (18W04) Reroute
Reroute 3.1 miles of the existing Pothole Trail from it's junction with Piru Canyon Road to the Sespe Wilderness boundary to create a more sustainable, user-friendly trailway that meets Forest Service trail standards.
📍 Ojai Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Renewal of expired Special Use Permit ORD12012
Renewal of an expired SUP of a 3" oil pipeline in the Sespe oil field, with no change to the facilities or scope of operation.
📍 Los Padres National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Los Padres National Forest
Rose Valley Creek Restoration Project
This proposal aims to restore Rose Valley Creek to its historical stream function, form, and habitat to benefit native aquatic species and armor Rose Valley creek from future wildfires by bolstering the riparian zone.
MilestoneDate
Scoping Start 05/11/2022
Comment Period 06/09/2022
Decision 05/2025 (Estimated)
Implementation 08/2026 (Estimated)
📍 Ojai Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/11/2022
Comment Period 06/09/2022
Decision 05/2025 (Estimated)
Implementation 08/2026 (Estimated)
Restorative Impact
Restorative Impact
Los Padres National Forest
Wheeler Gorge Campground Aquatic Organism Passage and Stream Restoration Project
This project will bolster campground crossing safety and provide aquatic organism passage by adding two bridges. During high flows four concrete crossings within the campground are dangerous for pedestrians and vehicles due to their smooth surfaces.
📍 Ojai Ranger District 🏷 Recreation management · Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Alaska DOT - turnagain Arm Weather Station
Installation and maintenance of a weather station to monitor an avalanche zone at MP 21 Seward Highway.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Alaska Energy Authority Transmission Line Rebuild Russian River to Cooper Creek
Alaska Energy Authority is proposing to upgrade the infrastructure in an existing right-of-way (ROW).
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
CCO Experiential is proposing hiking and camping on Cordova Ranger District
Coalition of Christian Outreach Experiential Designs is proposing to bring college students to camp in Sheep Bay, Orca Inlet, Orca Bay, and Simpson Bay and hike and camp on the Sand Trail leading to the Scott Glacier.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Cannery Creek Dam Structural and Safety Improvements
Alaska Department of Fish & Game have proposed dam improvements on the Cannery Creek Dam. The current structure has safety issues for staff operating the dam as well as in protection of the hatchery in the event of a dam breach.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Chugach Electric Association Portage to Whittier Shore Power Line Rebuild
CEA has proposed a line rebuild between Portage and Whittier to provide shore power to the Whittier cruise ship terminals.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Chugach National Forest Elodea Early Detection and Rapid Response
Adopt the language of the Programmatic Environmental Assessment of the U.S. Fish and Wildlife Service Management Strategy for Elodea and Other Submersed Aquatic Invasive Plants in the Alaska Region as the Chugach NF's management strategy.
Learn About Wildfire Learn About Thinning
📍 Chugach National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Eyak River Trail Maintenance
Maintain and repair trail within existing footprint.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Chugach National Forest
Forest Service Road 250 Realignment
Realign United States Forest Service Road 250 to educe erosion from the road surface, improve public access, restore essential fish habitat, and improve fish passage and floodplain connectivity.
📍 Cordova Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Main Bay Hatchery Safety Upgrades
ADFG has proposed the following safety upgrades at the Main Bay Fish Hatchery in Prince William Sound: removal and replacement of fuel tanks and lines, installation of permanent seine net anchors,& improved electric bear fence to protect brood pond.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Marine Debris Removal in Prince William Sound
The Cordova Ranger District has received proposals for (3) separate marine debris clean up projects in Prince William Sound.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
McCarthy River tours is proposing to conduct Outfitter Guide activities along the Copper River.
Nick Merlino or McCarthy River tours is proposing to raft clients down the Copper River and camp on National Forest system lands along the way.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Chugach National Forest
NGOA Marine, LLC (Aurelia Charters) has submitted a proposal to provide hiking to his clients.
NGOA Marine, LLC (Aurelia Charters)has submitted a proposal to provide guided hiking on the both Cordova and Glacier Ranger Districts. 90 service days is being requested.
📍 Glacier Ranger District 🏷 Special area management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Port Chalmers Cabin Relocation
Build a new Port Chalmers Cabin at a site more easily accessed by users, and decommission the existing site.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Derickson Bay Trail Addition 2026
The Glacier Ranger District proposes to add Derickson Bay Trail as a .26 mile Trail Class 2 Hiker/Pedestrian trail. https://usfs-public.box.com/s/zzj5kdpemsfmd2b2mt7ssjjtj3pep6lq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Esther Island North Trail Decommission 2026
The GRD Trails program would like to formally decommission Trail 113: Esther Island North Portage Trail which no longer exists. https://usfs-public.box.com/s/z2mezylqg11rmu1el1ve096i765s58qi
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Red Lake Portage Trail Decomission 2026
The Glacier Ranger District proposes to decommission Trail 127: Red Lake Portage Trail. This is a .2 mile trail is located in Esther Passage in Prince William Sound that no longer exists. https://usfs-public.box.com/s/l9qo4yxtanvw665o727m1nby1zqjt30q
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Sunburt Ski Trail Addition 2026
The Glacier Ranger District proposes to add Sunburst Ski Trail as a Trail Class 2 (snow) trail. This over snow trail starts at the mile 67 turnoff on the Seward Highway and continues to the crest of Sunburst. https://usfs-public.box.com/s/ote9omeuspdylddcooa4orwjfbjkb7z9
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD TOBI Extension Project
This project would connect the two currently existing segments of the Trail of Blue Ice in Portage Valley through the Moose Flats Day Use Area. This project would also decommission one vault toilet and the Moose Flats Trail. https://usfs.app.box.com/folder/373153676432
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Tincan Trailhead 2026
Creation of new trailhead and associated facilities in Turnagain Pass near mile post 69.9 of the Seward Highway. https://usfs-public.app.box.com/s/6bhyjz1p3ky33bvc14xn9gfxzd4vdqfq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Trinity Point Recreation Area 2026
The USDA Forest Service is proposing to construct new day use recreation facilities on National Forest System Lands on the Glacier Ranger District of the Chugach National Forest. https://usfs-public.box.com/s/b6mrcughst0hw6rsedbmz68v3s8csaml
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Recreation Opportunity Spectrum Forest Plan Amendment
The proposed amendment would change the ROS Class at Trinity Point from Semi-Primitive Motorized to Roaded Natural. Only 30 acres of land at Trinity Point would be affected.
Acres of Land At Trinity Point Would Be Affected 30
📍 Chugach National Forest All Units 🏷 Land management planning Added: 2026-05-28
Completed
Acres of Land At Trinity Point Would Be Affected 30
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Use Permits - New Proposals and Modifications to existing authorizations
Issuance of new outfitting and guiding authorizations to approved applications, or modification to existing outfitter guide authorizations in areas that have no capacity or resource concerns.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Uses - Reissuance of expiring authorizations with no changes.
Reissuance of existing outfitting and guiding authorizations with no change in location or scope of use.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed