415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
64 of 415
Significant Effect
Significant Effect
Taking Comments Now! 6/29/26 11:59 PM PDT
Umatilla National Forest
Battle Bruin Integrated Vegetation Management Project
This project proposes to restore a healthy, diverse, and resilient forest ecosystem and create defensible fuel breaks for use during wildfire emergencies through the use of mechanical and non-mechanical thinning and fuels treatments, reforestation, and seeding and planting of native plants.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
2 Days Left to Comment
Taking Comments Now! 6/29/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Blowdown Insect and Disease Management
Remove excess buildup of dead and down trees including incidental removal of standing stressed dying trees from areas along National Forest System roads 46, 4640, and 5710 to control insect infestation and spread.
Learn About Wildfire Learn About Thinning
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-06-26
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Long Prairie Allotment - Reevaluation of Environmental Documents
The Long Prairie Allotment Decision Notice was signed in 2005. A Reevaluation of Environmental Documents (7 CFR 1b.9 (r)) was conducted to evaluate grazing on the Long Prairie Pasture within the allotment.
📍 Hood River Ranger District 🏷 Grazing management Added: 2026-06-24
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
South Wasco Ecosystem Resiliency
The project proposes to conduct commercial and non-commercial fuels and vegetation treatments on approximately 19,000 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-06-15
Developing Proposal
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
MBS, ONF, Okan-Wen, Colville
Pacific Northwest National Scenic Trail Comprehensive Plan
The Comprehensive Plan will develop administrative and management objectives and practices and desired conditions for the Pacific Northwest National Scenic Trail on public lands in Forest Service Regions 1 and Regions 6.
📍 R6 - Pacific Northwest Region All Units 🏷 Recreation management · Special area management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Mt. Hood National Forest
Basin Thinning Project
The purpose of this project is to restore forest health and resiliency on 110 acres of selected plantations.
Learn About Wildfire Learn About Thinning
Acres of Selected Plantations 110
📍 Zigzag Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of Selected Plantations 110
Uncategorized
Uncategorized
Mt. Hood National Forest
Big Eddy-Ostrander Conductor Replacement Project
For more information the Big Eddy-Ostrander Conductor Replacement Project, visit the BPA project website https://www.bpa.gov/learn-and-participate/public-involvement-decisions/project-reviews/big-eddy-ostrander-project
📍 Mt. Hood National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Cascade Utilities Reflector Decommissioning
A communication reflector, owned by Cascade Utilities, is no longer is use and needs to be removed from National Forest System lands. The microwave dish is 20 feet by 24 feet in size and weighs 9,170 pounds. Once removed, the site would be restored.
📍 Clackamas River Ranger District 🏷 Special use management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Cloud Cap Inn Water System Renovation
The proposed action is reconstruction of the existing spring box, redevelopment of the existing spring, and installation of a new distribution main from the spring box to the Cloud Cap Saddle Campground, Cloud Cap Inn and Snowshoe Cabin.
📍 Hood River Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Consent for Geothermal Leasing
The Bureau of Land Management (BLM) received nominations of National Forest System lands to be considered for a future, competitive geothermal lease sale. The Forest Service is considering whether to consent to the BLM to lease these lands.
📍 Clackamas River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Hootnanny Insect and Disease
The primary purposes of this project are to reduce the risk of landscape level disturbance and increase forest resiliency to insect and disease.
Learn About Wildfire Learn About Thinning
📍 Barlow Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Anvil Vegetation Management Project
This project seeks to improve forest health and diversity in plantations. In addition, this project seeks to reduce excessive fuel loading primarily along forest roads. Approximately 4,000 acres may be proposed for vegetation and fuels treatments.
Learn About Wildfire Learn About Thinning
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Cascade Utilities Fiber Optic at Ripplebrook
Install fiber communication cable along existing roads, to provide high speed internet to the Ripplebrook administrative site.
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Clear Branch Dam Remediation
There is a need to remediate Clear Branch Dam to meet current dam safety and environmental compliance standards in order to continue to provide a clean dependable water supply for the Upper Hood River valley. More information at: clearbranchdam.com.
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Lost Lake Late Successional Reserve Acre Swap
There is a need to amend the Forest Plan to remove the high use recreational area of Lost Lake Resort, Campground and Day Use Area from Late-successional Reserve (LSR), and reallocate more appropriate areas as LSR.
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Timberline Chairlifts and Improvements
To improve connectivity between Summit Pass and Timberline Lodge, enhance skiing experience, and improve communications, the following is proposed: replacement of Summit Pass chairlift and new chairlift construction, ski terrain improvements, and fiber optic cable installation.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
Portland General Electric (PGE) Undergrounding Summit 13 Distribution Powerline
As part of PGE's Wildfire Mitigation Plan, there is a need to minimize wildland fire risk associated with utilities in the National Forest. Therefore, this project would underground approximately 5 miles of existing powerline.
📍 Zigzag Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Routine Repair and Maintenance of Existing Utilities in Ski Areas
Ski areas have ongoing repair and maintenance needs to meet Forest Service standards. This project allows for ski areas to better maintain existing utilities within permitted areas.
📍 Mt. Hood National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Stone Creek Vegetation Management Project
The project seeks to improve forest health and diversity on approximately 3,225 acres within the Oak Grove Fork Clackamas River watershed.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,225
📍 Clackamas River Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Completed
Acres (approx.) 3,225
Uncategorized
Uncategorized
Mt. Hood National Forest
Timberline Mountain Bike Connector Trails
There is a need to move advanced riders away from beginner riders more efficiently by adding short trail connectors from the Gravy Train Trail and upper Brobi Wan Trail. Also, a 245-foot trail alignment would be added to The Rock Trail.
📍 Zigzag Ranger District 🏷 Recreation management · Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Wapinitia Fuels Reduction
The purpose of this project is to improve forest conditions by reducing accumulated fuels on approximately 100 acres west of the Wapinitia subdivision. Work includes non-commercial hand-cutting trees 6-8 inches DBH. Access will use existing roads.
Learn About Wildfire Learn About Thinning
Acres (approx.) 100
📍 Zigzag Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 100
Significant Effect
Significant Effect
Umatilla National Forest
54 North Fuels Reduction and Huckleberry Restoration Project
To restore resilience in dry upland forests by protecting old trees, reducing surface fuels, reducing overall forest density, and shifting composition from intolerant to fire tolerant species. Improve habitat for huckleberry.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Fuels management · Heritage resource management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Blue Mountains Forest Plan Revision
Land Management Plan revision for the Malheur, Umatilla, and Wallowa-Whitman National Forests, which will provide management direction on approximately 4.9 million acres of public lands. https://www.fs.usda.gov/r06/umatilla/planning/blue-mountains-forest-plan-revision
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
📍 Umatilla National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Bone Point Planting CE
In accordance with the National Forest Management Act of 1976, this project proposes to replant trees in areas burned by the 2024 Bone Point Fire, where stocking levels have fallen below Umatilla National Forest Plan requirements.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Double Snag Planting CE
The proposed action is to plant ponderosa pine, Douglas-fir, western larch, and western white pine seedlings by hand on 107 acres of the Double Snag fire burn scar. This will be non-RHCA planting.
Learn About Wildfire Learn About Thinning
Acres of The Double Snag Fire Burn Scar 107
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of The Double Snag Fire Burn Scar 107
Significant Effect
Significant Effect
Umatilla National Forest
Ellis Integrated Vegetation Project
The Ellis Project is being developed to improve wildlife habitat, restore resiliency against insect/disease and wildfire, protect values at risk, provide timber products, and enhance public and traditional land uses.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
FSR 47 Chipseal
There is a need to complete repairs initiated after the 2020 flood and resurfacing the existing 8 miles of asphalt pavement to provide a smooth-running surface for the portion of NFSR 47 that accesses the Forest Service land.
📍 Umatilla National Forest All Units 🏷 Road management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Umatilla National Forest
Forestwide Aquatic Restoration
Aquatic restoration on public and private lands within the boundary of the UNF and/or adjacent lands in boundary-spanning 5th HUC watersheds where restoration activities would benefit or help achieve Forest Service aquatic restoration goals.
📍 Umatilla National Forest All Units 🏷 Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Lane Creek Drilling Survey
Proponent requesting to drill 5 holes 8" in diameter to depths of 15-50 feet to survey the location of bedrock to best determine stream channel design for culvert upgrade at Lane Creek and Highway 244.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Lone Rock Post Fire Recovery CE
Address hazardous fuel conditions and insect outbreaks caused by the 2024 Lone Rock fire by creating a fuel break and reducing excess fuel loads. Regenerate areas of forest cover where viable seed sources of desired tree species are insufficient.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Mottet Vegetation Management Project
Vegetation management project for stand structure and composition, socioeconomics by providing timber products.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Mt. Misery Snowshelter Relocation
Mt. Misery Snowshelter proposed to be moved to reduce ongoing impacts and comply with NHPA.
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
📍 Pomeroy Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Pearson Tract Lot 1A Expansion (SUP)
Increase footprint from 562 sq. ft. by adding an additional 16%u2019x16%u2019 to the back side (southwest side) of the cabin bringing the total footprint of the cabin to 818 sq. ft., well below the 1,200 sq. ft. maximum.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Penland Lake Water Tank
Install 2000 gallon holding tank and 425 feet of waterline attached to private well to gravity feed 3 private cabins adjacent to FS Lands.
📍 Umatilla National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Summit Road Fuels Reduction
The project would reduce fuels and improve forest health along the strategic control features of Forest Roads 31 (Summit Road) and 32 (Dry Creek).
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
Tiger-Mill
The Tiger-Mill Project is being proposed to protect the Mill Creek Municipal Watershed and restore ecosystem processes and functions that foster landscape diversity and achieve desired vegetation conditions.
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Top Road Fuel Break (CE)
Top Road Fuelbreak Project is located in the Lower Big Wall Creek and Cupper Canyon-North Fork John Day River watersheds. The constructed fuelbreak will run along roadways and existing fire break on National Forest Service lands.
Learn About Wildfire Learn About Thinning
📍 Umatilla National Forest All Units 🏷 Fuels management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Umatilla National Forest
Tucannon Watershed Restoration Projects
Activities are planned to correct areas compromised by 2020 flood event, 2022 post-Green Ridge fire event and identified restoration needs. Activities include bank stabilization, culvert and road repair under the Forestwide Aquatics EA (47428).
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 01/1970 (Estimated)
Implementation 07/2025 (Estimated)
📍 Umatilla National Forest All Units 🏷 Watershed management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 01/1970 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Umatilla National Forest
Zulu Post Fire Rehabilitation CE
This project will regenerate forest stands in burned areas that no longer have viable seed source for desired tree species. Treatments may include removing vegetation and planting seedlings in prepared areas.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Alaska DOT - turnagain Arm Weather Station
Installation and maintenance of a weather station to monitor an avalanche zone at MP 21 Seward Highway.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Alaska Energy Authority Transmission Line Rebuild Russian River to Cooper Creek
Alaska Energy Authority is proposing to upgrade the infrastructure in an existing right-of-way (ROW).
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
CCO Experiential is proposing hiking and camping on Cordova Ranger District
Coalition of Christian Outreach Experiential Designs is proposing to bring college students to camp in Sheep Bay, Orca Inlet, Orca Bay, and Simpson Bay and hike and camp on the Sand Trail leading to the Scott Glacier.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Cannery Creek Dam Structural and Safety Improvements
Alaska Department of Fish & Game have proposed dam improvements on the Cannery Creek Dam. The current structure has safety issues for staff operating the dam as well as in protection of the hatchery in the event of a dam breach.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Chugach Electric Association Portage to Whittier Shore Power Line Rebuild
CEA has proposed a line rebuild between Portage and Whittier to provide shore power to the Whittier cruise ship terminals.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Chugach National Forest Elodea Early Detection and Rapid Response
Adopt the language of the Programmatic Environmental Assessment of the U.S. Fish and Wildlife Service Management Strategy for Elodea and Other Submersed Aquatic Invasive Plants in the Alaska Region as the Chugach NF's management strategy.
Learn About Wildfire Learn About Thinning
📍 Chugach National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Eyak River Trail Maintenance
Maintain and repair trail within existing footprint.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Chugach National Forest
Forest Service Road 250 Realignment
Realign United States Forest Service Road 250 to educe erosion from the road surface, improve public access, restore essential fish habitat, and improve fish passage and floodplain connectivity.
📍 Cordova Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Main Bay Hatchery Safety Upgrades
ADFG has proposed the following safety upgrades at the Main Bay Fish Hatchery in Prince William Sound: removal and replacement of fuel tanks and lines, installation of permanent seine net anchors,& improved electric bear fence to protect brood pond.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Marine Debris Removal in Prince William Sound
The Cordova Ranger District has received proposals for (3) separate marine debris clean up projects in Prince William Sound.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
McCarthy River tours is proposing to conduct Outfitter Guide activities along the Copper River.
Nick Merlino or McCarthy River tours is proposing to raft clients down the Copper River and camp on National Forest system lands along the way.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Chugach National Forest
NGOA Marine, LLC (Aurelia Charters) has submitted a proposal to provide hiking to his clients.
NGOA Marine, LLC (Aurelia Charters)has submitted a proposal to provide guided hiking on the both Cordova and Glacier Ranger Districts. 90 service days is being requested.
📍 Glacier Ranger District 🏷 Special area management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Port Chalmers Cabin Relocation
Build a new Port Chalmers Cabin at a site more easily accessed by users, and decommission the existing site.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Derickson Bay Trail Addition 2026
The Glacier Ranger District proposes to add Derickson Bay Trail as a .26 mile Trail Class 2 Hiker/Pedestrian trail. https://usfs-public.box.com/s/zzj5kdpemsfmd2b2mt7ssjjtj3pep6lq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Esther Island North Trail Decommission 2026
The GRD Trails program would like to formally decommission Trail 113: Esther Island North Portage Trail which no longer exists. https://usfs-public.box.com/s/z2mezylqg11rmu1el1ve096i765s58qi
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Red Lake Portage Trail Decomission 2026
The Glacier Ranger District proposes to decommission Trail 127: Red Lake Portage Trail. This is a .2 mile trail is located in Esther Passage in Prince William Sound that no longer exists. https://usfs-public.box.com/s/l9qo4yxtanvw665o727m1nby1zqjt30q
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Sunburt Ski Trail Addition 2026
The Glacier Ranger District proposes to add Sunburst Ski Trail as a Trail Class 2 (snow) trail. This over snow trail starts at the mile 67 turnoff on the Seward Highway and continues to the crest of Sunburst. https://usfs-public.box.com/s/ote9omeuspdylddcooa4orwjfbjkb7z9
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD TOBI Extension Project
This project would connect the two currently existing segments of the Trail of Blue Ice in Portage Valley through the Moose Flats Day Use Area. This project would also decommission one vault toilet and the Moose Flats Trail. https://usfs.app.box.com/folder/373153676432
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Tincan Trailhead 2026
Creation of new trailhead and associated facilities in Turnagain Pass near mile post 69.9 of the Seward Highway. https://usfs-public.app.box.com/s/6bhyjz1p3ky33bvc14xn9gfxzd4vdqfq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Trinity Point Recreation Area 2026
The USDA Forest Service is proposing to construct new day use recreation facilities on National Forest System Lands on the Glacier Ranger District of the Chugach National Forest. https://usfs-public.box.com/s/b6mrcughst0hw6rsedbmz68v3s8csaml
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Recreation Opportunity Spectrum Forest Plan Amendment
The proposed amendment would change the ROS Class at Trinity Point from Semi-Primitive Motorized to Roaded Natural. Only 30 acres of land at Trinity Point would be affected.
Acres of Land At Trinity Point Would Be Affected 30
📍 Chugach National Forest All Units 🏷 Land management planning Added: 2026-05-28
Completed
Acres of Land At Trinity Point Would Be Affected 30
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Use Permits - New Proposals and Modifications to existing authorizations
Issuance of new outfitting and guiding authorizations to approved applications, or modification to existing outfitter guide authorizations in areas that have no capacity or resource concerns.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Uses - Reissuance of expiring authorizations with no changes.
Reissuance of existing outfitting and guiding authorizations with no change in location or scope of use.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed