415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
60 of 415
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore A-Cam
This project proposes installing 5,631 feet of fiber optic near Butte Valley Airport, and another 4,740 feet south of the airport. Actions for the underground conduit install would require cable plow and directional boring within the existing right of way.
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
📍 Goosenest Ranger District 🏷 Special use management Added: 2026-06-26
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
Restorative Impact
Restorative Impact
MBS, ONF, Okan-Wen, Colville
Pacific Northwest National Scenic Trail Comprehensive Plan
The Comprehensive Plan will develop administrative and management objectives and practices and desired conditions for the Pacific Northwest National Scenic Trail on public lands in Forest Service Regions 1 and Regions 6.
📍 R6 - Pacific Northwest Region All Units 🏷 Recreation management · Special area management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Mixed Impact
Mixed Impact
Ochoco National Forest
3 Fires Reforestation Initiative
The Forest experienced 3 very large wildfires in 2024 which require reforestation though planting native fire-adapted tree species where regeneration is unlikely. Plantings would generally take place in areas that had greater than 75% mortality.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Day Wireless Gray Butte Tower Addition Special Use Permit
Day Management Corporation submitted an application to install a 60' support tower, foundation and ice bridge on the existing site. This would allow for transmitting and receiving wireless communication signals. ACCESS DOCUMENTS: https://usfs-public.box.com/s/p6wjo60fl9mal90ej8oo9tmtph0y3uaw
📍 Crooked River National Grassland 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Ochoco National Forest
Lower Derr Restoration
The project is to improve hydrologic conditions and aquatic habitat on portions of Jackson Creek and Derr Creek. Specific actions include beaver dam analogues, riparian planting, LWD placement, meadow encroachment reduction and buck and pole fence.
📍 Ochoco National Forest All Units 🏷 Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Ochoco National Forest
North Fork Crooked River Forest Resilience Project
The main project purpose is to improve forest resilience to disturbance events, like insect and disease outbreaks and wildfire, and to promote adaptation to drought conditions by reducing tree density and fuels loading.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Ochoco National Forest
Wiley Flat Roadside Hazard Tree Abatement
The Lookout Mountain Ranger District will reduce roadside hazards along approximately 21.7 miles open roads within the Wiley Flat wildfire area through commercial salvage. After further analysis, 2.6 more miles of roadside treatment were added.
📍 Lookout Mountain Ranger District 🏷 Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
62 Road Fuel Break
The 62 Roadside Fuel Break CE Project would address hazardous fuel conditions on approximately 305.97 contiguous acres adjacent to roadways
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
📍 Prairie City Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
Significant Effect
Significant Effect
Malheur National Forest
Emigrant Creek Ranger District Aspen Project
The purpose of this project is to improve and restore aspen communities within the boundary of the Emigrant Creek Ranger District of the Malheur National Forest.
Learn About Wildfire Learn About Thinning
📍 Malheur National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Malheur National Forest
Murderers Creek Wild Horse Joint Management Area, Herd Management Area Plan
Establish a Herd Management Area Plan including appropriate management level. Conduct population management actions (gather activities) to attain proposed population and habitat objectives for wild horses in the joint management area.
📍 Malheur National Forest All Units 🏷 Special area management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
North Fork Allotment Range Improvements and Maintenance
This project authorizes improvements and subsequent maintenance of range infrastructure on the North Fork allotment on the Prairie City Ranger District of the Malheur NF. These include spring developments, fencing, and water gaps.
📍 Prairie City Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Malheur National Forest
OTEC Power Pole Replacement Project
Replace existing wooden power poles with fire resistant Ductile Iron poles.
📍 Emigrant Creek Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
Upper Bear Lake
Promoting landscape resiliency within a complex disturbance regime of wildfire, drought, insects, and diseases, providing a road system that is environmentally and economically sustainable that moves toward access and resource management objectives.
Learn About Wildfire Learn About Thinning
📍 Prairie City Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Alert California Wildfire Cameras
Installation and operation of wildfire camera system at 11 lookout sites.
📍 Klamath National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore IMA 2502
Cal-Ore Communication is proposing to place a telecommunication cable and appurtenances in and around the Macdoel and Tenant area. This new fiber optic cable would upgrade existing telecommunications and internet services.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore Reconnect 3
The project proposes to install and operate approximately 8.19 miles of new fiber optic communications cables and ancillary facilities in non-continuous routes within the project area.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Discovery Day Mine
The Discovery Day Mins is an established mine site that consists of a road, three working pads, and underground tunnels. A Plan of Operations has been proposed to mine the Discovery Day claim
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Gate Installation and Seasonal Road Closure on FS Road 46N73
Installation of a seasonal gate on Forest Service Road 46N73. New special use permit. Water Board Waiver n/a.
📍 Happy Camp Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Goosenest Developed Recreation Sites Fuels Reduction Project
Remove hazardous fuels from within and around all developed recreation sites on the Goosenest Ranger District.
Learn About Wildfire Learn About Thinning
📍 Klamath National Forest All Units 🏷 Recreation management · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. Project details: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
📍 Klamath National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
Restorative Impact
Restorative Impact
Klamath National Forest
Large Wood Loading and Floodplain Restoration Phase II
Implement recovery actions for Federally listed Coho Salmon in Mid-Klamath tributaries (Horse Trough Creek Floodplain). Waterboard waiver B and 401/404 permits.
📍 Happy Camp Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
McKinney Fire Restoration EA_Veg/Fuels
The McKinney Fire Restoration EA is proposed within and adjacent to the 2022 McKinney Fire footprint with the purpose of increasing wildfire resilience on the landscape. Proposed activities include a variety of fuels reduction treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Oak Knoll Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Middle Mile Broadband Initiative
This project is proposing to use Federal funding to provide broadband access to rural communities. Using Federal funds to place fiber optic lines in the existing right-of-way corridor is the only viable way to provide residents with broadband.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Klamath National Forest
River Complex Post Fire Restoration
This project was created to respond to conditions created by the 2021 River Complex Fires and to reflect the changes in post fire conditions. This project includes site preparation, prescribed burning, reforestation, and sediment reduction activities
Learn About Wildfire Learn About Thinning
📍 Salmon River Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Seiad Restoration Thin
The project will treat 3,350 acres within the 4,648-acre project boundary for fire risk reduction and community and resource protection within the Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
📍 Klamath National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Klamath National Forest
South End
Vegetation management and fuels reduction project with watershed restoration, resource protection, and public safety aspects. Water Board Waiver Category B expected.
Learn About Wildfire Learn About Thinning
📍 Goosenest Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
South Fork
The South Fork project is an active management project with the purpose of addressing hazardous fuels conditions along roads and private property, as well as aligning with Executive Order 14225, Immediate Expansion of American Timber Production.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Klamath National Forest All Units 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Klamath National Forest
Tennant Waterline
This project proposes to replace approximately two miles of water pipeline and two water troughs in the Bray cattle allotment on the Goosenest Ranger District.
📍 Goosenest Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Klamath National Forest
Windler Bar Habitat Enhancement
There is a need to enhance both fisheries and riparian habitat within the Project area, which is known to host rearing and spawning at-risk salmon. The purpose of this project is to address several critical elements of long-term restoration goals for salmon habitat and water quality.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Chugach National Forest
Alaska DOT - turnagain Arm Weather Station
Installation and maintenance of a weather station to monitor an avalanche zone at MP 21 Seward Highway.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Alaska Energy Authority Transmission Line Rebuild Russian River to Cooper Creek
Alaska Energy Authority is proposing to upgrade the infrastructure in an existing right-of-way (ROW).
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
CCO Experiential is proposing hiking and camping on Cordova Ranger District
Coalition of Christian Outreach Experiential Designs is proposing to bring college students to camp in Sheep Bay, Orca Inlet, Orca Bay, and Simpson Bay and hike and camp on the Sand Trail leading to the Scott Glacier.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Cannery Creek Dam Structural and Safety Improvements
Alaska Department of Fish & Game have proposed dam improvements on the Cannery Creek Dam. The current structure has safety issues for staff operating the dam as well as in protection of the hatchery in the event of a dam breach.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Chugach Electric Association Portage to Whittier Shore Power Line Rebuild
CEA has proposed a line rebuild between Portage and Whittier to provide shore power to the Whittier cruise ship terminals.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Chugach National Forest Elodea Early Detection and Rapid Response
Adopt the language of the Programmatic Environmental Assessment of the U.S. Fish and Wildlife Service Management Strategy for Elodea and Other Submersed Aquatic Invasive Plants in the Alaska Region as the Chugach NF's management strategy.
Learn About Wildfire Learn About Thinning
📍 Chugach National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Eyak River Trail Maintenance
Maintain and repair trail within existing footprint.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Chugach National Forest
Forest Service Road 250 Realignment
Realign United States Forest Service Road 250 to educe erosion from the road surface, improve public access, restore essential fish habitat, and improve fish passage and floodplain connectivity.
📍 Cordova Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Main Bay Hatchery Safety Upgrades
ADFG has proposed the following safety upgrades at the Main Bay Fish Hatchery in Prince William Sound: removal and replacement of fuel tanks and lines, installation of permanent seine net anchors,& improved electric bear fence to protect brood pond.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Marine Debris Removal in Prince William Sound
The Cordova Ranger District has received proposals for (3) separate marine debris clean up projects in Prince William Sound.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
McCarthy River tours is proposing to conduct Outfitter Guide activities along the Copper River.
Nick Merlino or McCarthy River tours is proposing to raft clients down the Copper River and camp on National Forest system lands along the way.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Chugach National Forest
NGOA Marine, LLC (Aurelia Charters) has submitted a proposal to provide hiking to his clients.
NGOA Marine, LLC (Aurelia Charters)has submitted a proposal to provide guided hiking on the both Cordova and Glacier Ranger Districts. 90 service days is being requested.
📍 Glacier Ranger District 🏷 Special area management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Port Chalmers Cabin Relocation
Build a new Port Chalmers Cabin at a site more easily accessed by users, and decommission the existing site.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Derickson Bay Trail Addition 2026
The Glacier Ranger District proposes to add Derickson Bay Trail as a .26 mile Trail Class 2 Hiker/Pedestrian trail. https://usfs-public.box.com/s/zzj5kdpemsfmd2b2mt7ssjjtj3pep6lq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Esther Island North Trail Decommission 2026
The GRD Trails program would like to formally decommission Trail 113: Esther Island North Portage Trail which no longer exists. https://usfs-public.box.com/s/z2mezylqg11rmu1el1ve096i765s58qi
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Red Lake Portage Trail Decomission 2026
The Glacier Ranger District proposes to decommission Trail 127: Red Lake Portage Trail. This is a .2 mile trail is located in Esther Passage in Prince William Sound that no longer exists. https://usfs-public.box.com/s/l9qo4yxtanvw665o727m1nby1zqjt30q
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Sunburt Ski Trail Addition 2026
The Glacier Ranger District proposes to add Sunburst Ski Trail as a Trail Class 2 (snow) trail. This over snow trail starts at the mile 67 turnoff on the Seward Highway and continues to the crest of Sunburst. https://usfs-public.box.com/s/ote9omeuspdylddcooa4orwjfbjkb7z9
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD TOBI Extension Project
This project would connect the two currently existing segments of the Trail of Blue Ice in Portage Valley through the Moose Flats Day Use Area. This project would also decommission one vault toilet and the Moose Flats Trail. https://usfs.app.box.com/folder/373153676432
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Tincan Trailhead 2026
Creation of new trailhead and associated facilities in Turnagain Pass near mile post 69.9 of the Seward Highway. https://usfs-public.app.box.com/s/6bhyjz1p3ky33bvc14xn9gfxzd4vdqfq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Trinity Point Recreation Area 2026
The USDA Forest Service is proposing to construct new day use recreation facilities on National Forest System Lands on the Glacier Ranger District of the Chugach National Forest. https://usfs-public.box.com/s/b6mrcughst0hw6rsedbmz68v3s8csaml
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Recreation Opportunity Spectrum Forest Plan Amendment
The proposed amendment would change the ROS Class at Trinity Point from Semi-Primitive Motorized to Roaded Natural. Only 30 acres of land at Trinity Point would be affected.
Acres of Land At Trinity Point Would Be Affected 30
📍 Chugach National Forest All Units 🏷 Land management planning Added: 2026-05-28
Completed
Acres of Land At Trinity Point Would Be Affected 30
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Use Permits - New Proposals and Modifications to existing authorizations
Issuance of new outfitting and guiding authorizations to approved applications, or modification to existing outfitter guide authorizations in areas that have no capacity or resource concerns.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Uses - Reissuance of expiring authorizations with no changes.
Reissuance of existing outfitting and guiding authorizations with no change in location or scope of use.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed