415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
64 of 415
Significant Effect
Significant Effect
Taking Comments Now! 6/29/26 11:59 PM PDT
Umatilla National Forest
Battle Bruin Integrated Vegetation Management Project
This project proposes to restore a healthy, diverse, and resilient forest ecosystem and create defensible fuel breaks for use during wildfire emergencies through the use of mechanical and non-mechanical thinning and fuels treatments, reforestation, and seeding and planting of native plants.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
2 Days Left to Comment
Taking Comments Now! 6/29/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
2025 Crescent Lake Recreation Residence Small Projects Fall
Authorization was requested from 2 recreation residence owners on Crescent Lake to complete two projects. Project one is the installation of a new septic system. Project two is the removal of a cabin damaged beyond repair due to a fallen tree.
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
2025 Crescent and Odell Lake Recreation Residence Small Projects Batch 1
Authorization was requested from 5 recreation residence owners on Crescent Lake, 4 owners on Odell Lake, and from the Shelter Cove Resort to complete minor upgrades or replacements such as deck or stair replacements and roof repairs.
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
Bend to Lava Lands Paved Path
Construct a non-motorized paved path that would provide connections to recreation sites south of Bend, OR. The entire length of the path would be from Baker Road to Lava Lands Visitor Center.
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Black Butte Ranch Wildland Urban Interface Fuels Reduction
The BBR WUI project proposes to maintain and restore resiliency and forest health and to address the potential risk of large-scale high severity wildfires. Proposed actions include thinning, mowing and prescribed burning on up to 2,800 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2,800
📍 Sisters Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 2,800
Significant Effect
Significant Effect
Deschutes National Forest
Boundary Road Fuels Reduction Project
Fuels reduction project to reduce wildfire risk to local communities in La Pine, OR and to enhance forest resilience to insect and disease. The project area is in the Wildland Urban Interface and in a high-risk fireshed adjacent to neighborhoods.
Learn About Wildfire Learn About Thinning
📍 Bend/Fort Rock Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
City of Bend Outback Site Conveyance
The purpose of this EA is to respond to the application submitted by the City under the Townsite Act. The proposed action would allow for 48 acres to be conveyed to the City at fair market value and would be used to expand its potable water infrastructure.
Acres 48
📍 Deschutes National Forest 🏷 Land ownership management Added: 2026-05-28
Completed
Acres 48
Uncategorized
Uncategorized
Deschutes National Forest
Class 1, Pedal-assist E-bikes on Select Trails
This project is considering the use of class 1 e-bikes on select trails with the designed use of bicycle. The proposed action includes 67 trails, totaling 161.4 miles as open to class 1 e-bikes.
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
📍 Deschutes National Forest 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Cougar Rock Restoration Project
The project proposes to maintain and restore resiliency and forest health and to address the potential risk of large-scale high severity wildfires. Proposed actions include thinning, mowing and prescribed burning on up to 2,800 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
📍 Sisters Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Crate Vegetation Management Project and Site-Specific Forest Plan Amendment
Vegetation management on approximately 18,168 acres to move forest conditions toward historic range of variability and improve forest resilience to disturbance to reduce the likelihood of uncharacteristic large-scale loss of forest habitat.
Learn About Thinning
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Deschutes Fuels Maintenance Project
Proposed fuels maintenance actions including non-fire and prescribed fire treatments on previously treated units on the east side of the forest.
Learn About Wildfire Learn About Thinning
📍 Deschutes National Forest 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Deschutes National Forest
Flat Top Fire Site Preparation and Reforestation Project
This project proposes site preparation cutting and reforestation on approximately 9,530 acres that experienced a high basal area loss of vegetation as a result of the Flat Top Fire in 2024.
Learn About Wildfire Learn About Thinning
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Deschutes National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
Significant Effect
Significant Effect
Deschutes National Forest
Green Ridge Landscape Restoration
The project would maintain and restore forest conditions closer to the historic range of variability and contribute to the restoration of ecosystem process and function in the planning area. Timber products are an outcome of restoration activities.
Learn About Wildfire Learn About Thinning
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
📍 Sisters Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
MEC Walker Mountain Tower Replacement
MEC is proposing to replace their existing communications tower and expand their control building at Walker Mountain Communication Site. Proposal includes moving the tower's location to improve line-of-sight with nearby microwave devices.
MilestoneDate
Scoping Start 06/04/2024
Decision 09/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 06/04/2024
Decision 09/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Deschutes National Forest
MODA Active Management Project
The MODA Active Management Project proposes dry forest restoration techniques in order to improve and maintain the forested ecosystem of of the Moore Creek and Davis Creek Subwatersheds on the Crescent Ranger District.
Learn About Wildfire Learn About Thinning
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
📍 Crescent Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Managed Stands Eastside Project
This project proposes vegetation management actions on 14,830 acres within previously managed stands on the eastside of the Crescent Ranger District.
Learn About Wildfire Learn About Thinning
Acres 14,830
📍 Crescent Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres 14,830
Uncategorized
Uncategorized
Deschutes National Forest
Meissner Groomer Garage Number 2
Meissner Nordic Club is proposing to build a second garage to store an additional groomer at an existing storage facility just north of the Virginia Meissner Sno-Park. The site currently has one garage and one metal storage container. The second garage will be placed in the existing site clearing.
📍 Bend/Fort Rock Ranger District 🏷 Facility management · Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Northwest Lift Improvements
Mt. Bachelor proposes to modernize the existing Northwest Express lift by replacing the lift's electric drive components and safety switches as well as replacing two operator shacks and increasing chair storage.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Outback Lift Bottom Terminal Power Supply Replacement
Mt. Bachelor is proposing to replace a 0.83 mile segment of power cable that supplies the bottom terminal of Outback Lift to maintain safe resort operations.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Summer 2025 Maintenance Projects
Maintenance proposals within Mt. Bachelor's special use permit area: installing new fiber optic conduit route to replace a damaged section of fiber line and connecting a power supply to the propane tank that serves Sunrise Lodge.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Sunrise Deck Expansion, Little Pine Power Distribution, and West Village Base Area Powe
Mt. Bachelor Ski Resort is proposing to expand the existing deck at Sunrise Lodge, upgrade the power feed to Little Pine Ski Lift to combat power supply issues, and install a generator and associated transformers, junction/sector cabinets, and buried powerlines in the West Village area.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Deschutes National Forest
Royce Mountain Roadside Hazardous Fuels
Intent is to reduce the risk of uncharacteristic wildfire on Federal land or catastrophic wildfire for an adjacent, at-risk community by reducing fuel loading, ladder fuels, and raising canopy base heights.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/26/2024
Decision 03/2025 (Estimated)
Implementation 04/2025 (Estimated)
📍 Crescent Ranger District 🏷 Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/26/2024
Decision 03/2025 (Estimated)
Implementation 04/2025 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
Sisters RD Recreation Shuttle Services
The Forest Service is proposing to approve special use permits for two local businesses, Stagecoach Adventures and Cog Wild. The two companies would provide shuttle services to and from several trailheads within the Sisters Ranger District.
📍 Sisters Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Sisters Trail Additions and Realignments (STAR)
The STAR project proposes several trail actions including new trail construction, additions of existing routes to the official Forest Service trail system, as well as realignments and decommissioning of existing trails on the Sisters Ranger District.
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
📍 Sisters Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
Mixed Impact
Mixed Impact
Deschutes National Forest
Upper Black Butte Swamp Restoration
Upper Black Butte Swamp is a 34-acre wetland that has incised channels and drying out vegetation. The project would restore the fen through channel filling, planting native vegetation, aspen restoration and invasive weed management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
📍 Sisters Ranger District 🏷 Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
West Bend Trails Project
Trail modifications, such as reroutes, new trails, decommissioning to create a more sustainable trail network while minimizing resource impacts.
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
West Bend Vegetation Management Project
Moving the area toward a more resilient landscape, providing a diversity of habitats, & reducing hazardous fuels. Approximately 14,750 acres of commercial thinning, for a total of 22,000 acres proposed for thinning, mowing, and/or underburning.
Learn About Wildfire Learn About Thinning
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
54 North Fuels Reduction and Huckleberry Restoration Project
To restore resilience in dry upland forests by protecting old trees, reducing surface fuels, reducing overall forest density, and shifting composition from intolerant to fire tolerant species. Improve habitat for huckleberry.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Fuels management · Heritage resource management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Blue Mountains Forest Plan Revision
Land Management Plan revision for the Malheur, Umatilla, and Wallowa-Whitman National Forests, which will provide management direction on approximately 4.9 million acres of public lands. https://www.fs.usda.gov/r06/umatilla/planning/blue-mountains-forest-plan-revision
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
📍 Umatilla National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Bone Point Planting CE
In accordance with the National Forest Management Act of 1976, this project proposes to replant trees in areas burned by the 2024 Bone Point Fire, where stocking levels have fallen below Umatilla National Forest Plan requirements.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Double Snag Planting CE
The proposed action is to plant ponderosa pine, Douglas-fir, western larch, and western white pine seedlings by hand on 107 acres of the Double Snag fire burn scar. This will be non-RHCA planting.
Learn About Wildfire Learn About Thinning
Acres of The Double Snag Fire Burn Scar 107
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of The Double Snag Fire Burn Scar 107
Significant Effect
Significant Effect
Umatilla National Forest
Ellis Integrated Vegetation Project
The Ellis Project is being developed to improve wildlife habitat, restore resiliency against insect/disease and wildfire, protect values at risk, provide timber products, and enhance public and traditional land uses.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
FSR 47 Chipseal
There is a need to complete repairs initiated after the 2020 flood and resurfacing the existing 8 miles of asphalt pavement to provide a smooth-running surface for the portion of NFSR 47 that accesses the Forest Service land.
📍 Umatilla National Forest All Units 🏷 Road management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Umatilla National Forest
Forestwide Aquatic Restoration
Aquatic restoration on public and private lands within the boundary of the UNF and/or adjacent lands in boundary-spanning 5th HUC watersheds where restoration activities would benefit or help achieve Forest Service aquatic restoration goals.
📍 Umatilla National Forest All Units 🏷 Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Lane Creek Drilling Survey
Proponent requesting to drill 5 holes 8" in diameter to depths of 15-50 feet to survey the location of bedrock to best determine stream channel design for culvert upgrade at Lane Creek and Highway 244.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Lone Rock Post Fire Recovery CE
Address hazardous fuel conditions and insect outbreaks caused by the 2024 Lone Rock fire by creating a fuel break and reducing excess fuel loads. Regenerate areas of forest cover where viable seed sources of desired tree species are insufficient.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Mottet Vegetation Management Project
Vegetation management project for stand structure and composition, socioeconomics by providing timber products.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Mt. Misery Snowshelter Relocation
Mt. Misery Snowshelter proposed to be moved to reduce ongoing impacts and comply with NHPA.
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
📍 Pomeroy Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Pearson Tract Lot 1A Expansion (SUP)
Increase footprint from 562 sq. ft. by adding an additional 16%u2019x16%u2019 to the back side (southwest side) of the cabin bringing the total footprint of the cabin to 818 sq. ft., well below the 1,200 sq. ft. maximum.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Penland Lake Water Tank
Install 2000 gallon holding tank and 425 feet of waterline attached to private well to gravity feed 3 private cabins adjacent to FS Lands.
📍 Umatilla National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Summit Road Fuels Reduction
The project would reduce fuels and improve forest health along the strategic control features of Forest Roads 31 (Summit Road) and 32 (Dry Creek).
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
Tiger-Mill
The Tiger-Mill Project is being proposed to protect the Mill Creek Municipal Watershed and restore ecosystem processes and functions that foster landscape diversity and achieve desired vegetation conditions.
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Top Road Fuel Break (CE)
Top Road Fuelbreak Project is located in the Lower Big Wall Creek and Cupper Canyon-North Fork John Day River watersheds. The constructed fuelbreak will run along roadways and existing fire break on National Forest Service lands.
Learn About Wildfire Learn About Thinning
📍 Umatilla National Forest All Units 🏷 Fuels management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Umatilla National Forest
Tucannon Watershed Restoration Projects
Activities are planned to correct areas compromised by 2020 flood event, 2022 post-Green Ridge fire event and identified restoration needs. Activities include bank stabilization, culvert and road repair under the Forestwide Aquatics EA (47428).
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 01/1970 (Estimated)
Implementation 07/2025 (Estimated)
📍 Umatilla National Forest All Units 🏷 Watershed management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 01/1970 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Umatilla National Forest
Zulu Post Fire Rehabilitation CE
This project will regenerate forest stands in burned areas that no longer have viable seed source for desired tree species. Treatments may include removing vegetation and planting seedlings in prepared areas.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Inyo National Forest
Airport Pit Disposal Site Permit Renewal
Reissuance of special use permit to the Town of Mammoth Lakes for operation of clean waste disposal at the Airport Pit
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Control Silver Peak Project
Southern California Edison is proposing to update and reconfigure approximately 61 linear miles of two existing 55 kilovolt subtransmission lines originally designed and built in the 1930s. BLM is lead agency. Full description: https://bit.ly/44zSlg
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Coyote Flat OHV Recreation Enhancement
Improve road and motorized trail management in the Coyote Flat area. Repair system roads for safety and resource protection, review travel management decision in this area and adjust if needed for resource protection and recreation enhancement.
📍 Inyo National Forest All Units 🏷 Recreation management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Inyo National Forest
Crystal Crag Water Storage Tank Replacement
The removal of two existing water storage tanks & constructing a new one. The new steel water storage tank will be 20,000-gallons, 16-foot diameter and 16 ft high. Including new inlet, outlet, drain, overflow, water supply, and distribution pipelines
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
E. Clampus Vitus Bodie Chapter No. 64 Tamarack Lodge Plaque
Bodie Chapter No. 64 of E. Clampus Vitus is to construct a historical marker w/ bronze plaque northeast of the Tamarack Lodge entrance commemorating the history of the Lodge & its contribution to the history of Mono County and the Mammoth Lakes Basin
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Mammoth Ranger District 🏷 Heritage resource management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Eastern Sierra Climate and Communities Resilience Project
Project collaboration website link: https://www.eswildfirealliance.org/esccrp. Approx. 58,000 acre forest restoration project around the Town of Mammoth Lakes. Activities may include thinning of live and dead trees, pile burning, mechanical and hand.
Learn About Wildfire Learn About Thinning
Acres (approx.) 58,000
📍 Inyo National Forest All Units 🏷 Fuels management · Climate change adaptation Added: 2026-05-28
Completed
Acres (approx.) 58,000
Uncategorized
Uncategorized
Inyo National Forest
Inyo National Forest Over-Snow Vehicle (OSV) Use Designation
The Inyo National Forest is evaluating its management of over snow vehicle (OSV) use. The purpose of this project is to designate system roads, trails and areas where OSV use will be allowed, in compliance with 36 CFR 212, Subpart C.
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
LADWP Long Valley Pole Removal and Pole Replacement Project
LADWP Utility Maintenance Project:1)removal of poles & replacement of poles in one line and 2)removal of poles & rehab in second line, 3)relinquish poles
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Long Valley Exploration Drilling
On November 12, 2025, the Mammoth Lakes Ranger District of the Inyo National Forest received a Plan of Operations (Plan) from KORE USA Ltd. (KORE) for their Long Valley Exploration Drilling project in Mono County, California. KORE plans to conduct exploration-level activities for deposits of gold.
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
📍 Inyo National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Inyo National Forest
Mammoth Mountain Main Lodge Redevelopment
Mammoth Mountain proposes redeveloping its Main Lodge area on private land, with related development on adjacent National Forest lands. Joint CEQA/NEPA analysis. Proposed construction/reconstruction of parking lots,buildings,chairlifts and ski runs.
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management · Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Mazourka Canyon Abandoned Mine Lands Safety Closures
Safety closures and restoration for three abandoned mine sites in Mazourka Canyon. Closures will include plugging or placing bat-friendly gates on mine shafts, removing abandoned equipment or materials, and placing rocks for more natural appearance.
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Minerals and geology Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Permit Reissuances - Ongoing, various permit types
Ongoing and continuous reissuance of various special use authorizations. Examples of these are resorts, research activities, utilities and events. For further information on any specific permit or permitted activities, contact Erin Noesser.
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Inyo National Forest
Reds Meadow Valley Recreation Site Renovations
Renovations & ecological restoration at 7 recreation sites / campgrounds in Reds Meadow Valley designed to enhance overall visitor experience, ensure recreation assets support current & future visitation & protect/restore ecologically sensitive areas
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
Restorative Impact
Restorative Impact
Inyo National Forest
Removal of Wild Horses Outside the Montgomery Pass Wild Horse Territory (MPWHT)
Gather and removal of excess wild horses that are located outside MPWHT to protect rangeland resources and proposed critical habitat for greater sage-grouse as well as address public safety concerns along highways/roadways.
📍 Mono Ranger District 🏷 Special area management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Inyo National Forest
Rock Creek Lodge Resort Wildfire Resilience
Fuels reduction and forest resilience project surrounding the Rock Creek Lakes Resort permit area on the Inyo National Forest. Project is funded by a National Resources Conservation Service grant.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Sherwin Area Recreation Plan 3 (SHARP)
Development of designated trails for protection of natural and cultural resources. This proposed action includes decommissioning of user created trails, reconstruction of user created trails, and new trail construction.
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Southern California Edison Control-Silver Peak 55kV Reliability Project
Installation of remote fault indicators, packet routers, and installation of remote switches along with poles replacements.
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Vista Towers, multi-carrier facility at Little Antelope Communication Site
Placement of multi-carrier building and tower at the Little Antelope Communications Site
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)