The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
55 of 415
Significant Effect
Significant Effect
Siuslaw National Forest
Five Green Restoration Project
The project purpose is thinning stands less than 80 years old in order to enhance and accelerate old-growth conditions in Late Successional Reserve and Matrix areas. There are commercial thinning actions as well as road work, invasive weed treatments, and slash disposal.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Central Coast Ranger District-ODNRA 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Siuslaw National Forest
Forest Plan Amendment for Wilderness Management
Updating standards, guidelines, and other Forest Plan components for stewardship of the Siuslaw's four wilderness areas. Responding to changed conditions since Forest Plan approval, including designation of new wilderness in 2019.
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Special area management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Integrated Invasive Species Project
This project would develop a strategy that allows an array of tools to be used for reducing invasive weeds across the Siuslaw NF. One component would add four new chemicals to approved use list, requiring a plan amendment. https://bit.ly/3RT9D4e
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Wildlife, fish, rare plants · Vegetation management (other than forest products) · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Long Term Development of a Plan to Restore Vehicular Access to Cascade Head via FSR 1861
To re-establish safe vehicular access to upper Cascade Head and stabilize landslide impacted areas from a 2021 landslide.
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
📍 Hebo Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Marys Peak Thatch Burning Project
This project is intended to remove built-up thatch produced from a large patch of treated creeping velvetgrass (Holcus mollis) by mowing, burning, and other actions and to revegetate these sites with native plants sourced exclusively from Marys Peak.
Learn About Wildfire Learn About Thinning
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
North Fork Smith Restoration
This is a landscape-scale terrestrial restoration project in the North Fork Smith River watershed area. Activities include: plantation thinning, wildlife habitat enhancement, invasive plant treatments, and road improvements.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Siuslaw National Forest
ODNRA South Jetty and Eel Creek Water Systems
Drinking water system replacement at Eel Creek Campground and South Jetty Area. Work at this facility would include waterline and treatment system replacement and well rehabilitation.
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Oregon Dunes National Recreation Area OHV Sound Limit Forest Plan Amendment
Forest Plan amendment proposal to increase the sound limit for ORVs to more nearly match those of Oregon State DEQ limits.
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Sand Lake Restoration Project
This is a landscape-scale restoration project in the Sand Lake watershed. Activities include: plantation thinning, fish and wildlife habitat enhancement, invasive plant treatments, road and recreation improvements, and sand dune restoration.
Learn About Wildfire Learn About Thinning
📍 Hebo Ranger District 🏷 Recreation management · Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Yamina (Yamhill-Willamina) Restoration Project
The Yamina project will focus on commercial thinning to support development of old growth characteristics for the future in the Yamhill-Willamina Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
📍 Hebo Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Antlers Resort Marina 20-Year Permit Issuance
Issuance of a new 20-year special use authorization (permit) to replace the existing permit which will allow for continued operation and management of Antlers Resort Marina. No changes will be made to currently authorized operations or facilities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Ash Creek Forest Health and Fuels Reduction Project
The Shasta-Trinity National Forest proposed the Ash Creek Forest Health and Fuels Reduction project to address high stand densities, on-going insect and disease outbreaks, and wildfire risk. Project information is available at: https://usfs-public.box.com/s/wqgxkuomwx42lfx6f31owbqoep2w5jyi
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 McCloud Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Shasta-Trinity National Forest
Beegum Watershed Restoration
Road-related improvements, including road decommissioning and safe OHV recreation opportunities, in the Beegum Creek Watershed of the Shasta-Trinity National Forest.
MilestoneDate
Scoping Start 05/04/2011
Comment Period 08/2020 (Estimated)
Objection Period Start 01/2021 (Estimated)
Decision 05/2021 (Estimated)
Implementation 06/2021 (Estimated)
📍 Yolla Bolla Ranger District 🏷 Recreation management · Watershed management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 05/04/2011
Comment Period 08/2020 (Estimated)
Objection Period Start 01/2021 (Estimated)
Decision 05/2021 (Estimated)
Implementation 06/2021 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Big Ranch Community Risk Reduction
The Project designed to reduce the risks associated with high intensity wildfire and improve forest health and function through forest thinning, reduction of hazardous fuels, reforestation and prescribed fire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Bowerman Cooperative Fuel Break Project
The purpose of the Project is to increase the effectiveness of fuel breaks and fuel reduction projects across ownership boundaries, to improve forest health and function, and to improve ingress and egress for firefighters and the public.
Learn About Wildfire Learn About Thinning
📍 Weaverville Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Carlson Road Construction Authorization
Issuance of a special use permit to authorize a private landowner to construct a new access road that would be 2,337 feet long by 30 feet wide on National Forest System lands. Road location is within the Backbone Inventoried Roadless Area.
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Corral Gulch Restoration
The FS will work with the Watershed Center of Hayfork, CA to restore floodplain function, raise the groundwater table, increase streamflow, decrease water temperatures, and decrease erosion and sedimentation, ultimately improving wildlife habitat.
Learn About Wildfire Learn About Thinning
📍 Hayfork Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Gemmill Thin
Thinning and fuels reduction to enhance and protect late successional habitat.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Hyampom Community Wildfire Risk Reduction Project
This project proposes to reduce wildfire risk to the community of Hyampom and improve forest resiliency through forest thinning, reduction of hazardous fuels and prescribed fire to reestablish natural fire regimes.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Junction City Community Risk Reduction Project PALS #68960
e Project is being designed to lower high- severity wildfire risk to the community of Junction City by reducing hazardous fuels around the community and improving forest health and resilience.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Weaverville Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. For more information, visit: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Lakehead and Platina Transfer Stations Permit Reauthorization
Issue new special use permit to Shasta County to replace expiring permits. There will be no changes to the authorized facilities or increases in the scope or intensity of authorized activities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Lava Roads Repair Project
The Forest plans to improve, realign, and decommission project roads to establish a minimum and efficient transportation system and address safety, accessibility, and maintenance concerns.
📍 Mt. Shasta Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Minersville Boat Launching Facility Improvements
Remove existing asphalt boat ramp & replace with a two-lane, concrete, v-grooved, low-water ramp with turn-arounds & sidewalk. Add parking area above high water mark of Trinity Lake. Replace existing restroom with new restroom. Widen access driveway.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
North Trinity Community Risk Reduction
The proposed project is designed to reduce risk to rural communities from catastrophic wildfire by reducing hazardous fuels, increasing safety adjacent to critical egress/ingress routes, and improving the resiliency of forested ecosystems.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment -- Antler 12kV Powerline Undergrounding Phases 1, 1.2, 1.3, and 2
Authorize the use and occupancy of National Forest System lands for PG&E's Antler 1101 1384 Phases 1, 1.2, 1.3 and 2 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019 ("Master Permit").
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6
Authorize the use and occupancy of NFS lands for PG&E's Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PGE Hogback Microgrid 30-Year Permit Issuance
Issuance of a 30-year special use authorization to PG&E for construction, operation & maintenance of a remote microgrid on Hogback Mountain to replace the existing source of service via the existing Pit No. 7 1101 electric distribution 12KV line.
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Parks-Trinity Fuelbreak Project
The Forest plans to create a linear fuelbreak approximately 500 feet on either side of FS 17 Road to help protect the wildland-urban interface and establish safe routes for the public and firefighters in a wildfire situation.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Pit/Curl Cooperative Fuel Break Project
Create linear fuel breaks to modify future fire behavior and connect fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire while also reducing risk to nearby communities. For project documents, visit: https://usfs-public.box.com/s/7oxlzaz0ebn7zb1fjs9amje8izehgqwf
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Root Fire Hazard Abatement Project
The project is proposed to recover the economic value of fire impacted stands, reduce the risk from roadside hazards, accelerate forest recovery, and reduce the likelihood and intensity of a reburn. Project information is available at - https://usfs-public.box.com/s/al78orqta5ilowffv2snxq4ie6y0eemm
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
📍 Mt. Shasta Ranger District 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Shasta-Trinity National Forest Outfitter/Guide Temporary and Priority Permit Authorizations
The Shasta-Trinity National is amending its process for authorizing outfitter and guide permits and will issue both temporary permits (authorizes use for less than one year) and priority permits (authorizes use for ten years).
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
South Fork Motorized Trail Project
Up to 19-miles of motorized user created trails would be added to the system. These trails would be constructed and maintained to Forest Service standards.
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
South Fork Sacramento Public Safety and Forest Restoration Project
Establish fuel management zones; thin trees; reduce fuels; restore meadows; develop new/expand existing campgrounds & parking; establish trailheads & trails; & repair riparian/habitat damage.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Recreation management · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Trinity Divide / Lakehead Cooperative Fuel Break Project
Creation of linear fuel breaks to modify future fire behavior and connect with fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire and reduce risk to communities. For project documents visit: https://usfs-public.box.com/s/6a1i45z4za8fpq24158rf0mhjhresu8d
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
Restorative Impact
Restorative Impact
Shasta-Trinity National Forest
Trinity River Watershed Restoration Project
The purpose of the project is to enhance quality and quantity of accessible cold-water aquatic habitat and water temperature conditions, and decrease fine sediment loading through watershed restoration activities in the Trinity River watershed.
📍 Shasta Trinity National Forest All Units 🏷 Wildlife, fish, rare plants · Watershed management · Climate change adaptation Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP)Project
The Trinity Public Utilities District and the Western Area Power Administration (lead Federal agency) propose a right-of-way expansion and vegetation management project to reduce fire risk to the surrounding communities. STNF is a cooperating agency.
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Airport Pit Disposal Site Permit Renewal
Reissuance of special use permit to the Town of Mammoth Lakes for operation of clean waste disposal at the Airport Pit
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Control Silver Peak Project
Southern California Edison is proposing to update and reconfigure approximately 61 linear miles of two existing 55 kilovolt subtransmission lines originally designed and built in the 1930s. BLM is lead agency. Full description: https://bit.ly/44zSlg
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Coyote Flat OHV Recreation Enhancement
Improve road and motorized trail management in the Coyote Flat area. Repair system roads for safety and resource protection, review travel management decision in this area and adjust if needed for resource protection and recreation enhancement.
📍 Inyo National Forest All Units 🏷 Recreation management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Inyo National Forest
Crystal Crag Water Storage Tank Replacement
The removal of two existing water storage tanks & constructing a new one. The new steel water storage tank will be 20,000-gallons, 16-foot diameter and 16 ft high. Including new inlet, outlet, drain, overflow, water supply, and distribution pipelines
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
E. Clampus Vitus Bodie Chapter No. 64 Tamarack Lodge Plaque
Bodie Chapter No. 64 of E. Clampus Vitus is to construct a historical marker w/ bronze plaque northeast of the Tamarack Lodge entrance commemorating the history of the Lodge & its contribution to the history of Mono County and the Mammoth Lakes Basin
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Mammoth Ranger District 🏷 Heritage resource management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Eastern Sierra Climate and Communities Resilience Project
Project collaboration website link: https://www.eswildfirealliance.org/esccrp. Approx. 58,000 acre forest restoration project around the Town of Mammoth Lakes. Activities may include thinning of live and dead trees, pile burning, mechanical and hand.
Learn About Wildfire Learn About Thinning
Acres (approx.) 58,000
📍 Inyo National Forest All Units 🏷 Fuels management · Climate change adaptation Added: 2026-05-28
Completed
Acres (approx.) 58,000
Uncategorized
Uncategorized
Inyo National Forest
Inyo National Forest Over-Snow Vehicle (OSV) Use Designation
The Inyo National Forest is evaluating its management of over snow vehicle (OSV) use. The purpose of this project is to designate system roads, trails and areas where OSV use will be allowed, in compliance with 36 CFR 212, Subpart C.
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
LADWP Long Valley Pole Removal and Pole Replacement Project
LADWP Utility Maintenance Project:1)removal of poles & replacement of poles in one line and 2)removal of poles & rehab in second line, 3)relinquish poles
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Long Valley Exploration Drilling
On November 12, 2025, the Mammoth Lakes Ranger District of the Inyo National Forest received a Plan of Operations (Plan) from KORE USA Ltd. (KORE) for their Long Valley Exploration Drilling project in Mono County, California. KORE plans to conduct exploration-level activities for deposits of gold.
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
📍 Inyo National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Inyo National Forest
Mammoth Mountain Main Lodge Redevelopment
Mammoth Mountain proposes redeveloping its Main Lodge area on private land, with related development on adjacent National Forest lands. Joint CEQA/NEPA analysis. Proposed construction/reconstruction of parking lots,buildings,chairlifts and ski runs.
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management · Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Mazourka Canyon Abandoned Mine Lands Safety Closures
Safety closures and restoration for three abandoned mine sites in Mazourka Canyon. Closures will include plugging or placing bat-friendly gates on mine shafts, removing abandoned equipment or materials, and placing rocks for more natural appearance.
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Minerals and geology Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Permit Reissuances - Ongoing, various permit types
Ongoing and continuous reissuance of various special use authorizations. Examples of these are resorts, research activities, utilities and events. For further information on any specific permit or permitted activities, contact Erin Noesser.
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Inyo National Forest
Reds Meadow Valley Recreation Site Renovations
Renovations & ecological restoration at 7 recreation sites / campgrounds in Reds Meadow Valley designed to enhance overall visitor experience, ensure recreation assets support current & future visitation & protect/restore ecologically sensitive areas
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
Restorative Impact
Restorative Impact
Inyo National Forest
Removal of Wild Horses Outside the Montgomery Pass Wild Horse Territory (MPWHT)
Gather and removal of excess wild horses that are located outside MPWHT to protect rangeland resources and proposed critical habitat for greater sage-grouse as well as address public safety concerns along highways/roadways.
📍 Mono Ranger District 🏷 Special area management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Inyo National Forest
Rock Creek Lodge Resort Wildfire Resilience
Fuels reduction and forest resilience project surrounding the Rock Creek Lakes Resort permit area on the Inyo National Forest. Project is funded by a National Resources Conservation Service grant.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Sherwin Area Recreation Plan 3 (SHARP)
Development of designated trails for protection of natural and cultural resources. This proposed action includes decommissioning of user created trails, reconstruction of user created trails, and new trail construction.
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Southern California Edison Control-Silver Peak 55kV Reliability Project
Installation of remote fault indicators, packet routers, and installation of remote switches along with poles replacements.
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Vista Towers, multi-carrier facility at Little Antelope Communication Site
Placement of multi-carrier building and tower at the Little Antelope Communications Site
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)