The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
46 of 415
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Blowdown Insect and Disease Management
Remove excess buildup of dead and down trees including incidental removal of standing stressed dying trees from areas along National Forest System roads 46, 4640, and 5710 to control insect infestation and spread.
Learn About Wildfire Learn About Thinning
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-06-26
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Long Prairie Allotment - Reevaluation of Environmental Documents
The Long Prairie Allotment Decision Notice was signed in 2005. A Reevaluation of Environmental Documents (7 CFR 1b.9 (r)) was conducted to evaluate grazing on the Long Prairie Pasture within the allotment.
📍 Hood River Ranger District 🏷 Grazing management Added: 2026-06-24
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
South Wasco Ecosystem Resiliency
The project proposes to conduct commercial and non-commercial fuels and vegetation treatments on approximately 19,000 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-06-15
Developing Proposal
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
25 Road Fuel Break
. The project would establish and maintain fuel breaks along the 25 Road that tie together recent Upper Briggs project (signed in 2019) area treatments to the old Taylor-Klondike Fire control lines and Rum Creek Fire contingency lines
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 01/10/2023
Decision 11/2023 (Estimated)
Implementation 03/2024 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/10/2023
Decision 11/2023 (Estimated)
Implementation 03/2024 (Estimated)
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
AT&T Cell Tower Replacement
Crown Castle (Agent for AT&T) is proposing to replace 80 foot existing self-support tower with a 150 foot self-support tower to provide elevation and space for equipment for 4 wireless communication providers and other users requesting collocation.
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
Dutchman Radio Building
Installation of a freestanding radio building to store radio equipment. Repair/replacement of Radio tower that was damaged during storms during the winter. Move and install ODF solar panels South of the Dutchman Lookout living quarters.
MilestoneDate
Scoping Start 06/20/2023
Decision 02/2027 (Estimated)
Implementation 06/2027 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Facility management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 06/20/2023
Decision 02/2027 (Estimated)
Implementation 06/2027 (Estimated)
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Moon Fire Recovery
The project will fell and remove hazard trees and reduce fuel loading in critical linear fuel management zones, perform site preparation for reforestation and plant site appropriate conifer seedlings.
Learn About Wildfire Learn About Thinning
📍 Gold Beach Ranger District 🏷 Forest products · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Mt. Ashland Ski Lift Replacement
To replace two lifts Areil and Windsor,which are aging lifts that are no longer repairable. Replacing the two lifts will increase safety and reliability, increase operational efficiency and inprove winter-sport infrastructure.
Learn About Wildfire Learn About Thinning
📍 Rogue River-Siskiyou National Forest All Units 🏷 Recreation management · Vegetation management (other than forest products) · Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
North Fork Diamond Bridge Replacement
Replacement of the North Fork Bridge that was burned in the Smith River complex fire.
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
📍 Wild Rivers Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Snowy Butte Landscape Restoration Project
The District is proposing a vegetation and watershed restoration project in collaboration with the Medford Watershed Commission to support fire resiliency and forest health in spring-fed water supply of the Big Butte Springs Municipal Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
📍 High Cascades Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Special area management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Thompson Creek Fuel Break
Treatments will reduce fuels and protect large residual trees by manually cutting brush and select live trees eight-inch DBH and under, ten-inch DBH and under of dead trees, hand piling, and pile burning within the project footprint.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Yellowjacket
The Yellowjacket Project aims to reduce hazardous fuels, and foster a more fire, insect, and disease resilient forest. This project will help to protect vulnerable communities from catastrophic wildfires by tying into past treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
Basin Thinning Project
The purpose of this project is to restore forest health and resiliency on 110 acres of selected plantations.
Learn About Wildfire Learn About Thinning
Acres of Selected Plantations 110
📍 Zigzag Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of Selected Plantations 110
Uncategorized
Uncategorized
Mt. Hood National Forest
Big Eddy-Ostrander Conductor Replacement Project
For more information the Big Eddy-Ostrander Conductor Replacement Project, visit the BPA project website https://www.bpa.gov/learn-and-participate/public-involvement-decisions/project-reviews/big-eddy-ostrander-project
📍 Mt. Hood National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Cascade Utilities Reflector Decommissioning
A communication reflector, owned by Cascade Utilities, is no longer is use and needs to be removed from National Forest System lands. The microwave dish is 20 feet by 24 feet in size and weighs 9,170 pounds. Once removed, the site would be restored.
📍 Clackamas River Ranger District 🏷 Special use management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Cloud Cap Inn Water System Renovation
The proposed action is reconstruction of the existing spring box, redevelopment of the existing spring, and installation of a new distribution main from the spring box to the Cloud Cap Saddle Campground, Cloud Cap Inn and Snowshoe Cabin.
📍 Hood River Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Consent for Geothermal Leasing
The Bureau of Land Management (BLM) received nominations of National Forest System lands to be considered for a future, competitive geothermal lease sale. The Forest Service is considering whether to consent to the BLM to lease these lands.
📍 Clackamas River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Hootnanny Insect and Disease
The primary purposes of this project are to reduce the risk of landscape level disturbance and increase forest resiliency to insect and disease.
Learn About Wildfire Learn About Thinning
📍 Barlow Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Anvil Vegetation Management Project
This project seeks to improve forest health and diversity in plantations. In addition, this project seeks to reduce excessive fuel loading primarily along forest roads. Approximately 4,000 acres may be proposed for vegetation and fuels treatments.
Learn About Wildfire Learn About Thinning
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Cascade Utilities Fiber Optic at Ripplebrook
Install fiber communication cable along existing roads, to provide high speed internet to the Ripplebrook administrative site.
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Clear Branch Dam Remediation
There is a need to remediate Clear Branch Dam to meet current dam safety and environmental compliance standards in order to continue to provide a clean dependable water supply for the Upper Hood River valley. More information at: clearbranchdam.com.
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Lost Lake Late Successional Reserve Acre Swap
There is a need to amend the Forest Plan to remove the high use recreational area of Lost Lake Resort, Campground and Day Use Area from Late-successional Reserve (LSR), and reallocate more appropriate areas as LSR.
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Timberline Chairlifts and Improvements
To improve connectivity between Summit Pass and Timberline Lodge, enhance skiing experience, and improve communications, the following is proposed: replacement of Summit Pass chairlift and new chairlift construction, ski terrain improvements, and fiber optic cable installation.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
Portland General Electric (PGE) Undergrounding Summit 13 Distribution Powerline
As part of PGE's Wildfire Mitigation Plan, there is a need to minimize wildland fire risk associated with utilities in the National Forest. Therefore, this project would underground approximately 5 miles of existing powerline.
📍 Zigzag Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Routine Repair and Maintenance of Existing Utilities in Ski Areas
Ski areas have ongoing repair and maintenance needs to meet Forest Service standards. This project allows for ski areas to better maintain existing utilities within permitted areas.
📍 Mt. Hood National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Stone Creek Vegetation Management Project
The project seeks to improve forest health and diversity on approximately 3,225 acres within the Oak Grove Fork Clackamas River watershed.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,225
📍 Clackamas River Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Completed
Acres (approx.) 3,225
Uncategorized
Uncategorized
Mt. Hood National Forest
Timberline Mountain Bike Connector Trails
There is a need to move advanced riders away from beginner riders more efficiently by adding short trail connectors from the Gravy Train Trail and upper Brobi Wan Trail. Also, a 245-foot trail alignment would be added to The Rock Trail.
📍 Zigzag Ranger District 🏷 Recreation management · Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Wapinitia Fuels Reduction
The purpose of this project is to improve forest conditions by reducing accumulated fuels on approximately 100 acres west of the Wapinitia subdivision. Work includes non-commercial hand-cutting trees 6-8 inches DBH. Access will use existing roads.
Learn About Wildfire Learn About Thinning
Acres (approx.) 100
📍 Zigzag Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 100
Uncategorized
Uncategorized
Inyo National Forest
Airport Pit Disposal Site Permit Renewal
Reissuance of special use permit to the Town of Mammoth Lakes for operation of clean waste disposal at the Airport Pit
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Control Silver Peak Project
Southern California Edison is proposing to update and reconfigure approximately 61 linear miles of two existing 55 kilovolt subtransmission lines originally designed and built in the 1930s. BLM is lead agency. Full description: https://bit.ly/44zSlg
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Coyote Flat OHV Recreation Enhancement
Improve road and motorized trail management in the Coyote Flat area. Repair system roads for safety and resource protection, review travel management decision in this area and adjust if needed for resource protection and recreation enhancement.
📍 Inyo National Forest All Units 🏷 Recreation management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Inyo National Forest
Crystal Crag Water Storage Tank Replacement
The removal of two existing water storage tanks & constructing a new one. The new steel water storage tank will be 20,000-gallons, 16-foot diameter and 16 ft high. Including new inlet, outlet, drain, overflow, water supply, and distribution pipelines
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
E. Clampus Vitus Bodie Chapter No. 64 Tamarack Lodge Plaque
Bodie Chapter No. 64 of E. Clampus Vitus is to construct a historical marker w/ bronze plaque northeast of the Tamarack Lodge entrance commemorating the history of the Lodge & its contribution to the history of Mono County and the Mammoth Lakes Basin
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Mammoth Ranger District 🏷 Heritage resource management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Eastern Sierra Climate and Communities Resilience Project
Project collaboration website link: https://www.eswildfirealliance.org/esccrp. Approx. 58,000 acre forest restoration project around the Town of Mammoth Lakes. Activities may include thinning of live and dead trees, pile burning, mechanical and hand.
Learn About Wildfire Learn About Thinning
Acres (approx.) 58,000
📍 Inyo National Forest All Units 🏷 Fuels management · Climate change adaptation Added: 2026-05-28
Completed
Acres (approx.) 58,000
Uncategorized
Uncategorized
Inyo National Forest
Inyo National Forest Over-Snow Vehicle (OSV) Use Designation
The Inyo National Forest is evaluating its management of over snow vehicle (OSV) use. The purpose of this project is to designate system roads, trails and areas where OSV use will be allowed, in compliance with 36 CFR 212, Subpart C.
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
LADWP Long Valley Pole Removal and Pole Replacement Project
LADWP Utility Maintenance Project:1)removal of poles & replacement of poles in one line and 2)removal of poles & rehab in second line, 3)relinquish poles
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Long Valley Exploration Drilling
On November 12, 2025, the Mammoth Lakes Ranger District of the Inyo National Forest received a Plan of Operations (Plan) from KORE USA Ltd. (KORE) for their Long Valley Exploration Drilling project in Mono County, California. KORE plans to conduct exploration-level activities for deposits of gold.
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
📍 Inyo National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Inyo National Forest
Mammoth Mountain Main Lodge Redevelopment
Mammoth Mountain proposes redeveloping its Main Lodge area on private land, with related development on adjacent National Forest lands. Joint CEQA/NEPA analysis. Proposed construction/reconstruction of parking lots,buildings,chairlifts and ski runs.
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management · Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Mazourka Canyon Abandoned Mine Lands Safety Closures
Safety closures and restoration for three abandoned mine sites in Mazourka Canyon. Closures will include plugging or placing bat-friendly gates on mine shafts, removing abandoned equipment or materials, and placing rocks for more natural appearance.
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Minerals and geology Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Permit Reissuances - Ongoing, various permit types
Ongoing and continuous reissuance of various special use authorizations. Examples of these are resorts, research activities, utilities and events. For further information on any specific permit or permitted activities, contact Erin Noesser.
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Inyo National Forest
Reds Meadow Valley Recreation Site Renovations
Renovations & ecological restoration at 7 recreation sites / campgrounds in Reds Meadow Valley designed to enhance overall visitor experience, ensure recreation assets support current & future visitation & protect/restore ecologically sensitive areas
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
Restorative Impact
Restorative Impact
Inyo National Forest
Removal of Wild Horses Outside the Montgomery Pass Wild Horse Territory (MPWHT)
Gather and removal of excess wild horses that are located outside MPWHT to protect rangeland resources and proposed critical habitat for greater sage-grouse as well as address public safety concerns along highways/roadways.
📍 Mono Ranger District 🏷 Special area management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Inyo National Forest
Rock Creek Lodge Resort Wildfire Resilience
Fuels reduction and forest resilience project surrounding the Rock Creek Lakes Resort permit area on the Inyo National Forest. Project is funded by a National Resources Conservation Service grant.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Sherwin Area Recreation Plan 3 (SHARP)
Development of designated trails for protection of natural and cultural resources. This proposed action includes decommissioning of user created trails, reconstruction of user created trails, and new trail construction.
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Southern California Edison Control-Silver Peak 55kV Reliability Project
Installation of remote fault indicators, packet routers, and installation of remote switches along with poles replacements.
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Vista Towers, multi-carrier facility at Little Antelope Communication Site
Placement of multi-carrier building and tower at the Little Antelope Communications Site
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)