162 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
28 of 162 active projects
Restorative Impact
Restorative Impact
Okanogan-Wenatchee National Forest
Frazer Creek BDA 2026
In Upper Frazer Creek on US Forest Service managed lands, the Methow Okanogan Beaver Project (MBP) proposes to support restoration of natural processes toward stream and floodplain connectivity, increased base streamflows, and climate resilience in the watershed.
MilestoneDate
NEPA Start Date 4/29/2026
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Special use management · Watershed management Added: 2026-06-24
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 4/29/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Canyon and Trout Creek Trail Bridge Replacements 2024
Replace damaged trail bridges at Jackita Ridge trail # 738 over Canyon Creek and W. Fork Methow trail #480 over Trout Creek.
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Methow Valley Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Chelan PUD Fiber Optic Installation Project
The project proposes aerial fiber optic installation, use, operation, and maintenance along roads within the existing transmission line right-of-way.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
📍 Wenatchee River Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Forest-wide Tree Seed Orchard Fire Protection Project
Maintain and protect developed tree seed orchards by thinning trees and maintaining fuel break in the surrounding 300 foot buffer.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
📍 Okanogan-Wenatchee National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Icicle Creek Rockfall Mitigation project
Provide rockfall mitigation on up to three slopes on Icicle Creek Road from MP4.3 to 4.8. Project is scheduled to be completed Fall of 2023.
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
📍 Wenatchee River Ranger District 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Midnight Restoration
Landscape-scale wildfire risk reduction and terrestrial restoration project in Rader Creek, lower Wolf Creek, and upper Twisp River drainages. Excludes Lake Chelan-Sawtooth Wilderness.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Fuels management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Okanogan-Wenatchee National Forest
Mineral Creek Road Decommissioning
This project would decommission approx. 1 mile of FS-4600 (Mineral Creek Road), which would no longer be needed after the Upper Kachess River Restoration project constructs a new trailhead for the Mineral Creek Trail.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Comment Period 07/2025 (Estimated)
Objection Period Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Cle Elum Ranger District 🏷 Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 07/2025 (Estimated)
Comment Period 07/2025 (Estimated)
Objection Period Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Planning and Management of Domestic Sheep and Goat Grazing within the Range of Bighorn Sheep
Proposal to amend Land and Resource Management Plans to provide forest plan direction for managing domestic sheep and goat grazing within the range of Bighorn sheep to better provide for bighorn sheep viability in the context of range management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Okanogan-Wenatchee National Forest 🏷 Grazing management · Land management planning · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
South Fork Tieton Prescribed Fire Project
Wildfire Crisis Strategy Project
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Naches Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Methow
Landscape-scale wildfire risk reduction and terrestrial restoration project in Goat Creek, Cub Creek and Lost River drainages using emergency authorities.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Swauk Restoration Project
Fuels & Forest Health EAD Project. Proposing forest restoration activities including commercial and non-commercial thinning, prescribed fire, fuels breaks, aquatic restoration activities, and transportation system changes.
Learn About Wildfire Learn About Thinning
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
📍 Cle Elum Ranger District 🏷 Forest products · Fuels management · Road management · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
White Pass Ski Area - Chairlift 4 Replacement Project
White Pass proposes to replace the existing double chairlift with a new quad chairlift. The new lift would be installed in the same alignment as the current lift, with the same bottom and top terminal locations.
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Naches Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Forest Wide Thinning & Potential Control Line Treatments
The proposed action would include 2 primary elements: plantation thinning of previously regenerated stands under 80 years of age, and small diameter hand thinning within 500 feet of roadsides identified by fire management staff as PCLs for use in future wildfire management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Little White Salmon Forest Resiliency and Fire Risk Mitigation Project
Increase forest resiliency to climate-related stressors and mitigate fire risk to highly valued resources in the Little White Salmon Watershed. Proposed actions will include commercial timber harvest, fuels treatments and other restoration projects.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Adams South Climb / Cold Springs Trailhead Improvements
Trailhead improvements necessary to ensure quality visitor experiences, improved sanitation and safety, and resource protection and restoration in the vicinity of the Mt. Adams South Climb (#183) and Cold Springs (#72) trailheads.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Margaret Backcountry Toilet Replacement
Project proposes to replace aging toilet facilities at 8 backcountry campsites in the Mount Margaret Backcountry Area within Mount St. Helens National Volcanic Monument.
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
📍 Mount St. Helens National Volcanic Monument 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Review of Wind River Consent to Geothermal Lease Request
The Gifford Pinchot National Forest is responding to two requests provided by Bureau of Land Management to evaluate consent to lease two nominated parcels of Forest Service lands for geothermal exploration and development.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Spirit Lake Outflow Safety Improvement Project
The Project proposes to evaluate options to improve safety of the outflow at Spirit Lake located within the Mount St. Helens National Volcanic Monument. A draft Record of Decision and corresponding documents will be published on July 7, 2026 opening up Objections for the Project.
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Regulations, directives, orders Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Bull Run Restoration Geotechnical Analysis CE
Bull Run Meadows Restoration Project geotechnical analysis of current subsurface substrates in mine waste piles. Excavation of a trench 8-10 feet deep, 3 feet wide and 12 feet long. Total disturbance will be less than 1/10th acre.
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Wallowa-Whitman National Forest All Units 🏷 Wildlife, fish, rare plants · Minerals and geology Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry DFPZ
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry Defensible Fuels Profile Zone
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Meadow Creek Watershed Restoration
Hazardous fuel reduction, watershed restoration, and research
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
ODOT Summit Point Communication Site, SUP PIN201802
Renewal of communication tower lease.
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Race Cow Project
Improve forest resilience, reduce hazardous fuels, enhance native grasslands, improve road access, develop two rock pits, reduce sediment delivery, provide timber products. Requesting EAD under IIJA, comment period per IIJA offered if granted.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Salmon River Ranger District 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Red Cougar Integrated Vegetation Management
Hazardous fuels reduction using prescribed burning, commercial and noncommercial thinning.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Sufferin' Springs Vegetation Management Project
Hazardous fuels reduction within stands at high risk for insect and disease out break as well as a high risk fireshed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date