The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
21 of 162 active projects
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
2025 Mt. Baker Geothermal Consent to Lease
To explore or develop geothermal resources on National Forest lands, the USFS must consent to lease areas nominated by the BLM. This analysis does not authorize ground disturbance, but creates stipulations for authorized leasing areas. https://usfs-public.box.com/s/r56gzyn1msyfvj8md81arv1mo15tgoso
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
📍 Mt. Baker Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Deception Falls Trail Bridge Replacements
Replacement of 2 failing bridges with new bridges in more sustainable locations, with trail reroutes leading to the new locations. Bridges 70'-80' in length each, with about 750' of new trail total.
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
📍 Skykomish Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Forestwide Thinning Analysis
This analysis will streamline the implementation of commercial thinning treatments designed to increase structural diversity of overstocked and planted stands and provide a sustainable flow of timber to local communities.
LFDC Commented Learn About Thinning
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Martin Gap Restoration Thinning Project
This project aims to restore forest health and resilience, improve wildlife habitat, and support native plants that are important to Tribal communities by thinning and diversifying previously regenerated plantation stands.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
📍 Snoqualmie Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
North Fork Stillaguamish Landscape Analysis
Landscape scale analysis of habitat restoration, and actions to improve ecological conditions.
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
South Fork Canyon Creek Road Bridge Removal and Footbridge Install
Removal of the failed FSR 41 road bridge over the South Fork of Canyon Creek and removal of earth abutments in the creekbed to restore natural hydrologic flow. Construction of a footbridge for access to the area north of the creek for recreation use.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Darrington Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Tenas Creek Restoration Project
The Darrington Ranger District proposes to replace a bridge on the Suiattle River Road to improve an important Chinook Salmon run and restore important salmon habitat for species.
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
📍 Darrington Ranger District 🏷 Road management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Forest Wide Thinning & Potential Control Line Treatments
The proposed action would include 2 primary elements: plantation thinning of previously regenerated stands under 80 years of age, and small diameter hand thinning within 500 feet of roadsides identified by fire management staff as PCLs for use in future wildfire management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Little White Salmon Forest Resiliency and Fire Risk Mitigation Project
Increase forest resiliency to climate-related stressors and mitigate fire risk to highly valued resources in the Little White Salmon Watershed. Proposed actions will include commercial timber harvest, fuels treatments and other restoration projects.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Adams South Climb / Cold Springs Trailhead Improvements
Trailhead improvements necessary to ensure quality visitor experiences, improved sanitation and safety, and resource protection and restoration in the vicinity of the Mt. Adams South Climb (#183) and Cold Springs (#72) trailheads.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Margaret Backcountry Toilet Replacement
Project proposes to replace aging toilet facilities at 8 backcountry campsites in the Mount Margaret Backcountry Area within Mount St. Helens National Volcanic Monument.
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
📍 Mount St. Helens National Volcanic Monument 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Review of Wind River Consent to Geothermal Lease Request
The Gifford Pinchot National Forest is responding to two requests provided by Bureau of Land Management to evaluate consent to lease two nominated parcels of Forest Service lands for geothermal exploration and development.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Spirit Lake Outflow Safety Improvement Project
The Project proposes to evaluate options to improve safety of the outflow at Spirit Lake located within the Mount St. Helens National Volcanic Monument. A draft Record of Decision and corresponding documents will be published on July 7, 2026 opening up Objections for the Project.
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Regulations, directives, orders Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date