415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
51 of 415
Significant Effect
Significant Effect
Fremont-Winema National Forest
Lake of the Woods Fuel Break
Project uses understory thinning, mastication, and prescribed fire to create and maintain fuel breaks and defensible space. Small trees are thinned, slash piled or burned, and fuels reduced through hand/machine piling, pile burning, underburning, and mastication.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Klamath Ranger District 🏷 Fuels management Added: 2026-06-18
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Fremont-Winema National Forest
QGold Exploration
Quartz Mountain Gold Ltd., a subsidiary of Q-Gold Resources Ltd., proposes to conduct mineral exploration activities on federal unpatented lode mining claims located on National Forest System (NFS) lands administered by the Fremont-Winema National Forest.
📍 Bly Ranger District 🏷 Minerals and geology Added: 2026-06-12
Completed
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
2025 Cougar Peak Reforestation and Fuel Break Project
Site preparation and planting of native trees on approximately 17,000 acres in the Cougar Peak Fire footprint. Creating and maintaining linear fuel breaks by reducing vegetation and down woody debris adjacent to roads in the project area.
Learn About Wildfire Learn About Thinning
Acres (approx.) 17,000
📍 Fremont-Winema National Forest All Units 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 17,000
Mixed Impact
Mixed Impact
Fremont-Winema National Forest
BPA-Lapine-Chiloquin Priority Pole Project
BPA has identified roads that require maintenance to ensure safe access to the LAPI-CHIL-1 transmission facilities. The road maintenance will allow BPA to also perform wood pole replacements that need to be completed along the transmission line.
MilestoneDate
Scoping Start 01/24/2023
Decision 06/2024 (Estimated)
Implementation 08/2024 (Estimated)
📍 Chemult Ranger District 🏷 Special use management · Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/24/2023
Decision 06/2024 (Estimated)
Implementation 08/2024 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Bly Mountain Insect and Disease Restoration Project (Bly Mountain Phase One)
The Chiloquin Ranger District aims to improve resource conditions and increase forest resilience to insect and disease infestation in a portion of the Bly Mountain planning area.
Learn About Wildfire Learn About Thinning
📍 Chiloquin Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Buck/Indian North Boundary Fence
There is a need to re-establish the northern boundary of the Buck/Indian cattle allotment to allow better management of the northern section of the allotment.
MilestoneDate
Scoping Start 01/23/2025
Decision 04/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Klamath Ranger District 🏷 Grazing management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/23/2025
Decision 04/2026 (Estimated)
Implementation 07/2026 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Buffalo Meadow Warming Shelter Project
This project proposes to install a pre-engineered shelter on the edge of a large meadow, known locally as Buffalo Meadow.
MilestoneDate
Scoping Start 01/18/2022
Decision 08/2026 (Estimated)
Implementation 11/2026 (Estimated)
📍 Klamath Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/18/2022
Decision 08/2026 (Estimated)
Implementation 11/2026 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Chiloquin Sewer project
This project will connect the Chiloquin Ranger District to the town of Chiloquin's sewer line
MilestoneDate
Scoping Start 03/20/2015
Decision 01/1970 (Estimated)
Implementation 06/2015 (Estimated)
📍 Chiloquin Ranger District 🏷 Facility management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 03/20/2015
Decision 01/1970 (Estimated)
Implementation 06/2015 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Clover Creek Fuel Break RAC
There is a need to improve the network of wildfire control and suppression features in a high-risk region by creating 12-miles of shaded fuel breaks along Clover Creek Road on Green Diamond Resource Company lands.
Learn About Wildfire Learn About Thinning
📍 Klamath Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Fremont-Winema National Forest
Dog Lake 303 Road Decommissioning
Due to poor road conditions, hydrological issues, unstable soils, presence of danger trees, and repeated maintenance by the Forest Service from locks and gates being removed by the public, there is a need to decommission the 303 road.
📍 Lakeview Ranger District 🏷 Road management · Wildlife, fish, rare plants Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Dry Prairie Spring Excavation
The Forest Service proposes to allow the permittee of the Yainax Butte Allotment to excavate the identified springs to find water and develop a water system off the spring to provide water to the cattle on the south end of the Dry Prairie pasture.
MilestoneDate
Scoping Start 02/02/2021
Decision 04/2021 (Estimated)
Implementation 04/2021 (Estimated)
📍 Bly Ranger District 🏷 Grazing management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 02/02/2021
Decision 04/2021 (Estimated)
Implementation 04/2021 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Klamath County-Summers Quarry Operations
There is a need for Klamath County to utilize the existing rock pit, Summers Quarry, for future road maintenance and construction projects. Klamath County would like to reauthorize a new permit for aggregate production and stockpiling of materials.
📍 Chiloquin Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Klamath Landscape Resiliency: Rocky Point WUI
The proposed action includes treatments on approximately 4,260 acres including vegetation restoration and resilience treatments, fuel breaks, road maintenance, and recreation enhancement activities.
Learn About Wildfire Learn About Thinning
Acres (approx.) 4,260
📍 Klamath Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 4,260
Uncategorized
Uncategorized
Fremont-Winema National Forest
Lake of the Woods Resort Expansion Project
I am proposing several actions at Lake of the Woods Resort including road and transportation improvements, dock renovation at the Resort Marina, installation of park model cabins, septic system upgrades, and remodeling of the Marina building.
📍 Klamath Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Fremont-Winema National Forest
Midstate Electric - Master Permit
Midstate Electric currently has seven separate permits and we are working on combining all seven into one authorization. This Master Permit will also be used to create an Operating Plan to be in compliance with the new FSH 2709.11 Ch. 80.
📍 Chemult Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Fremont-Winema National Forest
Miller Creek Fish Barrier Removal
In the 1950s, Miller Lake lamprey parasitized introduced trout in Miller Lake. There were concerns that the lamprey would compromise trout fisheries in the lake and a barrier was constructed. This project proposes full removal of the barrier.
📍 Chemult Ranger District 🏷 Wildlife, fish, rare plants Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Fremont-Winema National Forest
Mt. McLoughlin Trailhead Relocation Project
There is a need to relocate the Mt. Mcloughlin Trailhead and parking area to avoid initial and long-term maintenance costs associated with constructing a new bridge across the Cascade Canal.
MilestoneDate
Scoping Start 11/2024 (Estimated)
Comment Period 02/2025 (Estimated)
Objection Period Start 05/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 06/2026 (Estimated)
📍 Klamath Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 11/2024 (Estimated)
Comment Period 02/2025 (Estimated)
Objection Period Start 05/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Paddock Butte Prescribed Fire
Working together, Federal, State and Private land managers have the opportunity to reintroduce fire on an interagency landscape in the Paddock Butte area.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 10/30/2024
Decision 01/2025 (Estimated)
Implementation 04/2025 (Estimated)
📍 Bly Ranger District 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 10/30/2024
Decision 01/2025 (Estimated)
Implementation 04/2025 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Paradise Restoration Project
The primary purpose of the Paradise Restoration Project is ecosystem restoration. Action is needed to restore healthy forest ecosystems, improve wildlife habitats, and protect life, property, and infrastructure within and adjacent to the project area.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Bly Ranger District 🏷 Forest products · Fuels management · Land management planning · Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Fremont-Winema National Forest
Post-fire Competing Vegetation Management
The Forest Service is proposing to implement herbicide treatments for forest re-establishment and trail maintenance to reduce competing vegetation on approximately 43,000 acres of Forest System Lands that have been impacted by recent wildfires.
Learn About Wildfire Learn About Thinning
Acres 426,500
Acres 91,710
Acres 62,160
Acres 51,380
Acres (approx.) 43,000
Acres 8,946
MilestoneDate
NEPA Start Date 2/4/2026
Finding/Decision Date
📍 Fremont-Winema National Forest 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres 426,500
Acres 91,710
Acres 62,160
Acres 51,380
Acres (approx.) 43,000
Acres 8,946
MilestoneDate
NEPA Start Date 2/4/2026
Finding/Decision Date
Uncategorized
Uncategorized
Fremont-Winema National Forest
Seed Orchard Cone Stimulation Project
There is a need to inoculate three seed orchards in late July/August to stimulate cone production. Available seed is an obstacle reforestation needs. Research has shown that this treatment may increase the production of cones.
📍 Klamath Ranger District 🏷 Research Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Stams Restoration Project
The Silver Lake Ranger District is proposing the Stams Restoration Project to implement project activities to improve forest resiliency and sustainability, maintain and enhance habitat diversity, and reduce wildfire risk on approximately 2790 acres within the project area.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2790
📍 Silver Lake Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres (approx.) 2790
Significant Effect
Significant Effect
Fremont-Winema National Forest
Switchback Restoration Project (Bly Mountain Phase Two)
The Chiloquin Ranger District aims to improve resource conditions and increase forest resilience to insect and disease infestation in a portion of the Bly Mountain planning area.
Learn About Wildfire Learn About Thinning
📍 Chiloquin Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Antlers Resort Marina 20-Year Permit Issuance
Issuance of a new 20-year special use authorization (permit) to replace the existing permit which will allow for continued operation and management of Antlers Resort Marina. No changes will be made to currently authorized operations or facilities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Ash Creek Forest Health and Fuels Reduction Project
The Shasta-Trinity National Forest proposed the Ash Creek Forest Health and Fuels Reduction project to address high stand densities, on-going insect and disease outbreaks, and wildfire risk. Project information is available at: https://usfs-public.box.com/s/wqgxkuomwx42lfx6f31owbqoep2w5jyi
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 McCloud Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Restorative Impact
Restorative Impact
Shasta-Trinity National Forest
Beegum Watershed Restoration
Road-related improvements, including road decommissioning and safe OHV recreation opportunities, in the Beegum Creek Watershed of the Shasta-Trinity National Forest.
MilestoneDate
Scoping Start 05/04/2011
Comment Period 08/2020 (Estimated)
Objection Period Start 01/2021 (Estimated)
Decision 05/2021 (Estimated)
Implementation 06/2021 (Estimated)
📍 Yolla Bolla Ranger District 🏷 Recreation management · Watershed management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 05/04/2011
Comment Period 08/2020 (Estimated)
Objection Period Start 01/2021 (Estimated)
Decision 05/2021 (Estimated)
Implementation 06/2021 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Big Ranch Community Risk Reduction
The Project designed to reduce the risks associated with high intensity wildfire and improve forest health and function through forest thinning, reduction of hazardous fuels, reforestation and prescribed fire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Bowerman Cooperative Fuel Break Project
The purpose of the Project is to increase the effectiveness of fuel breaks and fuel reduction projects across ownership boundaries, to improve forest health and function, and to improve ingress and egress for firefighters and the public.
Learn About Wildfire Learn About Thinning
📍 Weaverville Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Carlson Road Construction Authorization
Issuance of a special use permit to authorize a private landowner to construct a new access road that would be 2,337 feet long by 30 feet wide on National Forest System lands. Road location is within the Backbone Inventoried Roadless Area.
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Corral Gulch Restoration
The FS will work with the Watershed Center of Hayfork, CA to restore floodplain function, raise the groundwater table, increase streamflow, decrease water temperatures, and decrease erosion and sedimentation, ultimately improving wildlife habitat.
Learn About Wildfire Learn About Thinning
📍 Hayfork Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Gemmill Thin
Thinning and fuels reduction to enhance and protect late successional habitat.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Hyampom Community Wildfire Risk Reduction Project
This project proposes to reduce wildfire risk to the community of Hyampom and improve forest resiliency through forest thinning, reduction of hazardous fuels and prescribed fire to reestablish natural fire regimes.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Junction City Community Risk Reduction Project PALS #68960
e Project is being designed to lower high- severity wildfire risk to the community of Junction City by reducing hazardous fuels around the community and improving forest health and resilience.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Weaverville Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. For more information, visit: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Lakehead and Platina Transfer Stations Permit Reauthorization
Issue new special use permit to Shasta County to replace expiring permits. There will be no changes to the authorized facilities or increases in the scope or intensity of authorized activities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Lava Roads Repair Project
The Forest plans to improve, realign, and decommission project roads to establish a minimum and efficient transportation system and address safety, accessibility, and maintenance concerns.
📍 Mt. Shasta Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Minersville Boat Launching Facility Improvements
Remove existing asphalt boat ramp & replace with a two-lane, concrete, v-grooved, low-water ramp with turn-arounds & sidewalk. Add parking area above high water mark of Trinity Lake. Replace existing restroom with new restroom. Widen access driveway.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
North Trinity Community Risk Reduction
The proposed project is designed to reduce risk to rural communities from catastrophic wildfire by reducing hazardous fuels, increasing safety adjacent to critical egress/ingress routes, and improving the resiliency of forested ecosystems.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment -- Antler 12kV Powerline Undergrounding Phases 1, 1.2, 1.3, and 2
Authorize the use and occupancy of National Forest System lands for PG&E's Antler 1101 1384 Phases 1, 1.2, 1.3 and 2 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019 ("Master Permit").
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6
Authorize the use and occupancy of NFS lands for PG&E's Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PGE Hogback Microgrid 30-Year Permit Issuance
Issuance of a 30-year special use authorization to PG&E for construction, operation & maintenance of a remote microgrid on Hogback Mountain to replace the existing source of service via the existing Pit No. 7 1101 electric distribution 12KV line.
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Parks-Trinity Fuelbreak Project
The Forest plans to create a linear fuelbreak approximately 500 feet on either side of FS 17 Road to help protect the wildland-urban interface and establish safe routes for the public and firefighters in a wildfire situation.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Pit/Curl Cooperative Fuel Break Project
Create linear fuel breaks to modify future fire behavior and connect fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire while also reducing risk to nearby communities. For project documents, visit: https://usfs-public.box.com/s/7oxlzaz0ebn7zb1fjs9amje8izehgqwf
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Root Fire Hazard Abatement Project
The project is proposed to recover the economic value of fire impacted stands, reduce the risk from roadside hazards, accelerate forest recovery, and reduce the likelihood and intensity of a reburn. Project information is available at - https://usfs-public.box.com/s/al78orqta5ilowffv2snxq4ie6y0eemm
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
📍 Mt. Shasta Ranger District 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Shasta-Trinity National Forest Outfitter/Guide Temporary and Priority Permit Authorizations
The Shasta-Trinity National is amending its process for authorizing outfitter and guide permits and will issue both temporary permits (authorizes use for less than one year) and priority permits (authorizes use for ten years).
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
South Fork Motorized Trail Project
Up to 19-miles of motorized user created trails would be added to the system. These trails would be constructed and maintained to Forest Service standards.
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
South Fork Sacramento Public Safety and Forest Restoration Project
Establish fuel management zones; thin trees; reduce fuels; restore meadows; develop new/expand existing campgrounds & parking; establish trailheads & trails; & repair riparian/habitat damage.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Recreation management · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Trinity Divide / Lakehead Cooperative Fuel Break Project
Creation of linear fuel breaks to modify future fire behavior and connect with fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire and reduce risk to communities. For project documents visit: https://usfs-public.box.com/s/6a1i45z4za8fpq24158rf0mhjhresu8d
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
Restorative Impact
Restorative Impact
Shasta-Trinity National Forest
Trinity River Watershed Restoration Project
The purpose of the project is to enhance quality and quantity of accessible cold-water aquatic habitat and water temperature conditions, and decrease fine sediment loading through watershed restoration activities in the Trinity River watershed.
📍 Shasta Trinity National Forest All Units 🏷 Wildlife, fish, rare plants · Watershed management · Climate change adaptation Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP)Project
The Trinity Public Utilities District and the Western Area Power Administration (lead Federal agency) propose a right-of-way expansion and vegetation management project to reduce fire risk to the surrounding communities. STNF is a cooperating agency.
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)