415 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
90 of 415
Significant Effect
Significant Effect
Taking Objections Now! 7/31/26 11:59 PM PDT
Willamette National Forest
Dead Mountain
Timber harvest, small diameter fuels reduction, roadside fuels reductions, burn blocks, and recreation management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
34 Days Left to Comment
Taking Objections Now! 7/31/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore A-Cam
This project proposes installing 5,631 feet of fiber optic near Butte Valley Airport, and another 4,740 feet south of the airport. Actions for the underground conduit install would require cable plow and directional boring within the existing right of way.
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
📍 Goosenest Ranger District 🏷 Special use management Added: 2026-06-26
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
2025 Crescent Lake Recreation Residence Small Projects Fall
Authorization was requested from 2 recreation residence owners on Crescent Lake to complete two projects. Project one is the installation of a new septic system. Project two is the removal of a cabin damaged beyond repair due to a fallen tree.
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
2025 Crescent and Odell Lake Recreation Residence Small Projects Batch 1
Authorization was requested from 5 recreation residence owners on Crescent Lake, 4 owners on Odell Lake, and from the Shelter Cove Resort to complete minor upgrades or replacements such as deck or stair replacements and roof repairs.
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
Bend to Lava Lands Paved Path
Construct a non-motorized paved path that would provide connections to recreation sites south of Bend, OR. The entire length of the path would be from Baker Road to Lava Lands Visitor Center.
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Black Butte Ranch Wildland Urban Interface Fuels Reduction
The BBR WUI project proposes to maintain and restore resiliency and forest health and to address the potential risk of large-scale high severity wildfires. Proposed actions include thinning, mowing and prescribed burning on up to 2,800 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2,800
📍 Sisters Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 2,800
Significant Effect
Significant Effect
Deschutes National Forest
Boundary Road Fuels Reduction Project
Fuels reduction project to reduce wildfire risk to local communities in La Pine, OR and to enhance forest resilience to insect and disease. The project area is in the Wildland Urban Interface and in a high-risk fireshed adjacent to neighborhoods.
Learn About Wildfire Learn About Thinning
📍 Bend/Fort Rock Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
City of Bend Outback Site Conveyance
The purpose of this EA is to respond to the application submitted by the City under the Townsite Act. The proposed action would allow for 48 acres to be conveyed to the City at fair market value and would be used to expand its potable water infrastructure.
Acres 48
📍 Deschutes National Forest 🏷 Land ownership management Added: 2026-05-28
Completed
Acres 48
Uncategorized
Uncategorized
Deschutes National Forest
Class 1, Pedal-assist E-bikes on Select Trails
This project is considering the use of class 1 e-bikes on select trails with the designed use of bicycle. The proposed action includes 67 trails, totaling 161.4 miles as open to class 1 e-bikes.
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
📍 Deschutes National Forest 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Cougar Rock Restoration Project
The project proposes to maintain and restore resiliency and forest health and to address the potential risk of large-scale high severity wildfires. Proposed actions include thinning, mowing and prescribed burning on up to 2,800 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
📍 Sisters Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Crate Vegetation Management Project and Site-Specific Forest Plan Amendment
Vegetation management on approximately 18,168 acres to move forest conditions toward historic range of variability and improve forest resilience to disturbance to reduce the likelihood of uncharacteristic large-scale loss of forest habitat.
Learn About Thinning
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Deschutes Fuels Maintenance Project
Proposed fuels maintenance actions including non-fire and prescribed fire treatments on previously treated units on the east side of the forest.
Learn About Wildfire Learn About Thinning
📍 Deschutes National Forest 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Deschutes National Forest
Flat Top Fire Site Preparation and Reforestation Project
This project proposes site preparation cutting and reforestation on approximately 9,530 acres that experienced a high basal area loss of vegetation as a result of the Flat Top Fire in 2024.
Learn About Wildfire Learn About Thinning
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Deschutes National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
Significant Effect
Significant Effect
Deschutes National Forest
Green Ridge Landscape Restoration
The project would maintain and restore forest conditions closer to the historic range of variability and contribute to the restoration of ecosystem process and function in the planning area. Timber products are an outcome of restoration activities.
Learn About Wildfire Learn About Thinning
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
📍 Sisters Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
MEC Walker Mountain Tower Replacement
MEC is proposing to replace their existing communications tower and expand their control building at Walker Mountain Communication Site. Proposal includes moving the tower's location to improve line-of-sight with nearby microwave devices.
MilestoneDate
Scoping Start 06/04/2024
Decision 09/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 06/04/2024
Decision 09/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Deschutes National Forest
MODA Active Management Project
The MODA Active Management Project proposes dry forest restoration techniques in order to improve and maintain the forested ecosystem of of the Moore Creek and Davis Creek Subwatersheds on the Crescent Ranger District.
Learn About Wildfire Learn About Thinning
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
📍 Crescent Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Managed Stands Eastside Project
This project proposes vegetation management actions on 14,830 acres within previously managed stands on the eastside of the Crescent Ranger District.
Learn About Wildfire Learn About Thinning
Acres 14,830
📍 Crescent Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres 14,830
Uncategorized
Uncategorized
Deschutes National Forest
Meissner Groomer Garage Number 2
Meissner Nordic Club is proposing to build a second garage to store an additional groomer at an existing storage facility just north of the Virginia Meissner Sno-Park. The site currently has one garage and one metal storage container. The second garage will be placed in the existing site clearing.
📍 Bend/Fort Rock Ranger District 🏷 Facility management · Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Northwest Lift Improvements
Mt. Bachelor proposes to modernize the existing Northwest Express lift by replacing the lift's electric drive components and safety switches as well as replacing two operator shacks and increasing chair storage.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Outback Lift Bottom Terminal Power Supply Replacement
Mt. Bachelor is proposing to replace a 0.83 mile segment of power cable that supplies the bottom terminal of Outback Lift to maintain safe resort operations.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Summer 2025 Maintenance Projects
Maintenance proposals within Mt. Bachelor's special use permit area: installing new fiber optic conduit route to replace a damaged section of fiber line and connecting a power supply to the propane tank that serves Sunrise Lodge.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Sunrise Deck Expansion, Little Pine Power Distribution, and West Village Base Area Powe
Mt. Bachelor Ski Resort is proposing to expand the existing deck at Sunrise Lodge, upgrade the power feed to Little Pine Ski Lift to combat power supply issues, and install a generator and associated transformers, junction/sector cabinets, and buried powerlines in the West Village area.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Deschutes National Forest
Royce Mountain Roadside Hazardous Fuels
Intent is to reduce the risk of uncharacteristic wildfire on Federal land or catastrophic wildfire for an adjacent, at-risk community by reducing fuel loading, ladder fuels, and raising canopy base heights.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/26/2024
Decision 03/2025 (Estimated)
Implementation 04/2025 (Estimated)
📍 Crescent Ranger District 🏷 Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/26/2024
Decision 03/2025 (Estimated)
Implementation 04/2025 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
Sisters RD Recreation Shuttle Services
The Forest Service is proposing to approve special use permits for two local businesses, Stagecoach Adventures and Cog Wild. The two companies would provide shuttle services to and from several trailheads within the Sisters Ranger District.
📍 Sisters Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Sisters Trail Additions and Realignments (STAR)
The STAR project proposes several trail actions including new trail construction, additions of existing routes to the official Forest Service trail system, as well as realignments and decommissioning of existing trails on the Sisters Ranger District.
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
📍 Sisters Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
Mixed Impact
Mixed Impact
Deschutes National Forest
Upper Black Butte Swamp Restoration
Upper Black Butte Swamp is a 34-acre wetland that has incised channels and drying out vegetation. The project would restore the fen through channel filling, planting native vegetation, aspen restoration and invasive weed management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
📍 Sisters Ranger District 🏷 Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
West Bend Trails Project
Trail modifications, such as reroutes, new trails, decommissioning to create a more sustainable trail network while minimizing resource impacts.
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
West Bend Vegetation Management Project
Moving the area toward a more resilient landscape, providing a diversity of habitats, & reducing hazardous fuels. Approximately 14,750 acres of commercial thinning, for a total of 22,000 acres proposed for thinning, mowing, and/or underburning.
Learn About Wildfire Learn About Thinning
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2022 ODOT rock stockpile
Expand the Santiam Pass Oregon Department of Transportation (ODOT) rock disposal site by 5 acres and build a short connecting road to the Santiam sand shed. Accomplished by blading away native soil and vegetation with standard earth moving equipment.
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2023 Big Lake Youth Camp
McKenzie River Ranger District is proposing to authorize the operators of Big Lake Youth Camp (BLYC) to conduct several site improvements.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
2024 McKenzie River Trail Connector
McKenzie River Ranger District wants to complete construction of a short trail connection between the newly installed trail bridge at the Deer Creek to Forest Service Road 2654 in support of the McKenzie River National Recreation Trail #3507.
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
2024 Monkey Flower Research Weather Station
This project will provide weather data to support a long-running research project on the Monkey flower. A small weather station will be installed by digging a hole approximately the size of a 5-gallon bucket and filling it with cement to anchor it.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
2024 Peek Thin
The McKenzie River Ranger District is proposing approximately 109 acres of variable density thinning in three 46 to 48 year old plantation stands. Treatment would consist of thinning, dominant tree release, gaps up to 3 acres, and unthinned skips.
Learn About Thinning
Acres of Variable Density Thinning In Three 46 109
Acres (approx.) 3
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of Variable Density Thinning In Three 46 109
Acres (approx.) 3
Uncategorized
Uncategorized
Willamette National Forest
2024 USGS Pit Tag Application
The USGS will install a Passive-Integrated-Transporter (PIT) tags in the South Fork of the McKenzie River, upstream from Cougar Reservoir. It will operate in association with an existing USGS stream gage.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Bado Thin
The Detroit Ranger District proposes to commercially thin approximately 33 acres in a plantation stand that is 65 years old. The purpose of the project is to increase stand health and vigor and provide timber to the local economy.
Learn About Wildfire Learn About Thinning
Acres (approx.) 33
📍 Detroit Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres (approx.) 33
Uncategorized
Uncategorized
Willamette National Forest
Big Lake Boat Launch
The McKenzie River Ranger District is proposing to add a temporary dock to the boat launch at the Big Lake Campground Boat Launch. The proposed dock will be a temporary dock that can be pulled in and out each season.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Willamette National Forest
Bingham Bridge Floodplain Restoration
Vegetation would be removed and large wood would be placed in the floodplain while reconnecting side channels. Heavy equipment would be used to cut high areas and fill low areas while trying to maintain as much established vegetation as possible.
📍 Middle Fork Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Blair Lake Campground Fire Recovery
We are proposing to remove damaged trees at the Blair Lake Campground that were affected by the Cedar Creek Fire. The campground was heavily impacted by the fire and is currently closed to public access due to the dangerous conditions.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Willamette National Forest
Breitenbush Subsoiling and Floodplain Restoration
The Breitenbush floodplain restoration will improve watershed and habitat conditions affected by historic management actions, the 2020 Beachie-Lionshead Fires, and subsequent post-fire emergency actions.
📍 Detroit Ranger District 🏷 Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
CF Thin
The McKenzie River Ranger District is proposing approximately 125 acres of variable density thinning in three 65-70 year old plantation stands.
Learn About Thinning
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Cala-Wiley
The district proposes to treat 899 acres of under 80 plantations using thinning, dominant tree releases, gap creation, and skips then fuel treatments.
Learn About Wildfire Learn About Thinning
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Calloway
This project area encompasses 45,041 acres and is located on the McKenzie River and Sweet Home Districts of the Willamette National Forest north of Blue River, Oregon. Harvest units are in two sub watersheds, with 281 units totaling 5,886 acres.
Learn About Wildfire Learn About Thinning
Acres 45,041
Acres 5,886
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres 45,041
Acres 5,886
Uncategorized
Uncategorized
Willamette National Forest
Campground Host Site Improvements
Underground plastic holding tanks would be installed at many campgrounds within 10 feet of trailer pad. If the current host site is unsuitable, a new site could be selected. Parking barriers would be installed to prevent driving over tanks.
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
Cedar Creek Fire Trail Bridge Replacements
The purpose of this project is to return two stream crossings on the Jim Weaver Loop to a useable and safe state for public use. The Dam Camp and Elbow Lake bridges were burned in the 2022 Cedar Creek Fire and are now a hazard for public use.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Clark Creek Organizational Camp Hazard Tree Removal
The purpose of this project is to remove damaged trees at Clark Creek Organizational Campground that was affected by the 2023 Bedrock Fire.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Cowhorn Trail Cutoff
Oregon Cascades Recreation Area remains disconnected between the west and east sides as it stands. No bike-legal single track route exists from the popular Timpanogas area to the Windy Lakes. This proposed cutoff will create better connectivity.
MilestoneDate
Scoping Start 05/09/2018
Decision 06/2024 (Estimated)
Implementation 07/2024 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/09/2018
Decision 06/2024 (Estimated)
Implementation 07/2024 (Estimated)
Restorative Impact
Restorative Impact
Willamette National Forest
Devils Creek and Breitenbush Forks post-fire Cabins Rebuild
In 2020, the Lionshead Fire destroyed 70 recreation residences (cabins) on the Devil's Creek and Breitenbush Forks tracks. This project is to allow the rebuild of the fire-destroyed cabins, where appropriate.
MilestoneDate
Scoping Start 08/2023 (Estimated)
Decision 05/2024 (Estimated)
Implementation 05/2025 (Estimated)
📍 Detroit Ranger District 🏷 Recreation management · Special area management · Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/2023 (Estimated)
Decision 05/2024 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Divide
This project would commercially harvest about 1,918 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes meadow restoration and sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
📍 Willamette National Forest 🏷 Forest products · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
In Progress
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
Significant Effect
Significant Effect
Willamette National Forest
Fall Creek
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Fish Lake Fire Resilience
The purpose of this project is to reduce the abundance of ladder fuels and canopy densities adjacent to Fish Lake Historic Site that is within the Wildland Urban Interface (WUI).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Flat Country Floral Greens Project
This project would remove floral greens: beargrass, salal, fern fronds, and vine maple/ceanothus sticks. This would occur on approximately 28,523 acres of the McKenzie River Ranger District. The sell of these products will be done under permits.
Learn About Thinning
Acres of The Mckenzie River Ranger District 28,523
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of The Mckenzie River Ranger District 28,523
Mixed Impact
Mixed Impact
Willamette National Forest
Forest System Road 2209 Segment Repair
The District is proposing to return a 3.2 mile segment of FSR 2209 between the Opal Creek trailhead and Jawbone Flats to pre-Beachie Creek Fire condition. Road work may include culvert replacement, drainage repair, and incidental hazard tree removal.
📍 Detroit Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Hazard Tree Removal at Developed Recreation Sites
The proposed action is to fall hazardous trees at developed recreation sites within the portions of the Detroit Ranger District burned by the Beachie Creek and Lionshead fires of 2020.
📍 Detroit Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Ivy Cliff
This project would commercially harvest about 2037 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes road density management, fuels improvement, sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Detroit Ranger District 🏷 Forest products · Land management planning · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lava Parks
Commercial harvest, rock pit expansion, meadows within units, Lava View Loop Viewpoint.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Little Owl Small Sale
Treat proposed units using a combination of commercial thinning, gaps, skips, and dominant tree release.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lowell Country Project
The project includes thinning of ~15,900 net acres of managed stands under 80 years of age to improve stand growth/vigor and to produce a sustainable supply of forest products, as well as maintain, store and/or decommission ~650 miles of roads.
Learn About Wildfire Learn About Thinning
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Willamette National Forest
Middle Fork Fire Affected Roads Project
Reduce the risks posed by fire-killed and injured trees that have fallen across or remain standing along important access routes of the Cedar Creek, Gales and Bedrock fire-affected road system. (Formerly known as Cedar-Gales Roadside Risk Reduction)
Learn About Wildfire Learn About Thinning
📍 Middle Fork Ranger District 🏷 Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Monkeyflower Weather Stations
A special use permit has been requested by the University of Louisiana at Lafayette to install four weather stations around the common monkeyflower sites to monitor temperature and soil moisture.
📍 Sweet Home Ranger District 🏷 Research Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Post Fire Planting
Post-fire tree planting to reforest existing and future wildfire impacted areas to meet desired conditions for forest cover.
Learn About Wildfire Learn About Thinning
📍 Willamette National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Roadside Hazardous Fuels Reduction
The Detroit Ranger District is proposing to create fuel breaks to reduce hazardous fuels on strategic roads across the District: 10, 1012, 2212, 2236, and low severity burn sections of 2231 and 2233.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
📍 Detroit Ranger District 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Scott Lake Parking Improvements
The project is proposing to create additional parking locations for a high use campground and trailhead.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Willamette National Forest
Soda Fork Large Wood Enhancement
Improve spawning and rearing habitat in Soda Fork Creek for Upper Willamette Winter Steelhead and Spring Chinook that are listed as Threatened under the Endangered Species Act and improve stream complexity in Soda Fork Creek.
📍 Sweet Home Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Willamette National Forest
South Fork Delta Restoration Expansion
This project will expand the the restoration area initially included in the 2018 Lower South Fork McKenzie River Floodplain Enhancement Project Environmental Assessment and provide recreational opportunities near the Delta Campground area.
📍 McKenzie River Ranger District 🏷 Watershed management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Willamette National Forest
South Santiam Tree Tipping
The project objective is to improve stream habitat to aid recovery of the Endangered Species Act listed Upper Willamette Winter Steelhead and Spring Chinook Salmon by tipping approximately 25 trees into the South Santiam River.
📍 Sweet Home Ranger District 🏷 Wildlife, fish, rare plants Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Station Butte
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Steeple Rock Rigdon
Thinning with skips and gaps in about 3,200 acres, meadow restoration, floodplain restoration, roadside fuels reductions, dispersed campsite reconfiguration, travel management, and quarry development.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,200
📍 Middle Fork Ranger District 🏷 Recreation management · Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres (approx.) 3,200
Uncategorized
Uncategorized
Willamette National Forest
Strube Flats Fire Camp
This project would establish a permanent site for accommodating fire camps, and secure the site from motor vehicles by installing four gates at the entrances.
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Sunny Thin
The McKenzie River Ranger District is proposing to treat approximately 63 acres located in four stands. Stands #1-3 are approximately 30 years old, whilestand #10 is approximately 110 years old.
Learn About Wildfire Learn About Thinning
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Supplemental EA for 2020 Fire Affected Road System Risk Reduction
Allow ground-based equipment to operate outside of the road prism to conduct fire killed and injured tree felling previously authorized by the 2020 Fire Affected Road System Risk Reduction project #61749.
Learn About Wildfire Learn About Thinning
📍 Willamette National Forest All Units 🏷 Forest products · Fuels management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Upper Canyon
The district proposes to treat 1,069 acres of under 80 stands using thinning, dominant tree release, gap creation, and skips. Meadows would be restored and fuels treated.
Learn About Wildfire Learn About Thinning
Acres 1,069
📍 Sweet Home Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Acres 1,069
Uncategorized
Uncategorized
Willamette National Forest
West Fork 8th Creek OHV Trail Bridge Replacement
The purpose of this project is to rebuild the West Fork 8th creek trail bridge. The bridge has failed and collapsed. There is a need for the bridge to be replaced to enhance user safety and protect natural resources.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Youngs Rock Rigdon
Forest management treatments are proposed on approximately 6,500 acres within the project area. Treatment proposed include thinning, early seral creation, fuel reduction, habitat restoration, system road management, recreation management.
Learn About Wildfire Learn About Thinning
Acres (approx.) 6,500
📍 Middle Fork Ranger District 🏷 Recreation management · Heritage resource management · Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres (approx.) 6,500
Uncategorized
Uncategorized
Klamath National Forest
Alert California Wildfire Cameras
Installation and operation of wildfire camera system at 11 lookout sites.
📍 Klamath National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore IMA 2502
Cal-Ore Communication is proposing to place a telecommunication cable and appurtenances in and around the Macdoel and Tenant area. This new fiber optic cable would upgrade existing telecommunications and internet services.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore Reconnect 3
The project proposes to install and operate approximately 8.19 miles of new fiber optic communications cables and ancillary facilities in non-continuous routes within the project area.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Discovery Day Mine
The Discovery Day Mins is an established mine site that consists of a road, three working pads, and underground tunnels. A Plan of Operations has been proposed to mine the Discovery Day claim
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Gate Installation and Seasonal Road Closure on FS Road 46N73
Installation of a seasonal gate on Forest Service Road 46N73. New special use permit. Water Board Waiver n/a.
📍 Happy Camp Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Goosenest Developed Recreation Sites Fuels Reduction Project
Remove hazardous fuels from within and around all developed recreation sites on the Goosenest Ranger District.
Learn About Wildfire Learn About Thinning
📍 Klamath National Forest All Units 🏷 Recreation management · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. Project details: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
📍 Klamath National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
Restorative Impact
Restorative Impact
Klamath National Forest
Large Wood Loading and Floodplain Restoration Phase II
Implement recovery actions for Federally listed Coho Salmon in Mid-Klamath tributaries (Horse Trough Creek Floodplain). Waterboard waiver B and 401/404 permits.
📍 Happy Camp Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
McKinney Fire Restoration EA_Veg/Fuels
The McKinney Fire Restoration EA is proposed within and adjacent to the 2022 McKinney Fire footprint with the purpose of increasing wildfire resilience on the landscape. Proposed activities include a variety of fuels reduction treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Oak Knoll Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Middle Mile Broadband Initiative
This project is proposing to use Federal funding to provide broadband access to rural communities. Using Federal funds to place fiber optic lines in the existing right-of-way corridor is the only viable way to provide residents with broadband.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Klamath National Forest
River Complex Post Fire Restoration
This project was created to respond to conditions created by the 2021 River Complex Fires and to reflect the changes in post fire conditions. This project includes site preparation, prescribed burning, reforestation, and sediment reduction activities
Learn About Wildfire Learn About Thinning
📍 Salmon River Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Seiad Restoration Thin
The project will treat 3,350 acres within the 4,648-acre project boundary for fire risk reduction and community and resource protection within the Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
📍 Klamath National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Klamath National Forest
South End
Vegetation management and fuels reduction project with watershed restoration, resource protection, and public safety aspects. Water Board Waiver Category B expected.
Learn About Wildfire Learn About Thinning
📍 Goosenest Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
South Fork
The South Fork project is an active management project with the purpose of addressing hazardous fuels conditions along roads and private property, as well as aligning with Executive Order 14225, Immediate Expansion of American Timber Production.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Klamath National Forest All Units 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Klamath National Forest
Tennant Waterline
This project proposes to replace approximately two miles of water pipeline and two water troughs in the Bray cattle allotment on the Goosenest Ranger District.
📍 Goosenest Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Restorative Impact
Restorative Impact
Klamath National Forest
Windler Bar Habitat Enhancement
There is a need to enhance both fisheries and riparian habitat within the Project area, which is known to host rearing and spawning at-risk salmon. The purpose of this project is to address several critical elements of long-term restoration goals for salmon habitat and water quality.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date