The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
46 of 162 active projects
Mixed Impact
Mixed Impact
Colville National Forest
Buckhorn Project
Vegetation management, fuels management, and aquatic restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
📍 Tonasket Ranger District 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management Added: 2026-06-15
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
2025 Mt. Baker Geothermal Consent to Lease
To explore or develop geothermal resources on National Forest lands, the USFS must consent to lease areas nominated by the BLM. This analysis does not authorize ground disturbance, but creates stipulations for authorized leasing areas. https://usfs-public.box.com/s/r56gzyn1msyfvj8md81arv1mo15tgoso
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
📍 Mt. Baker Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Deception Falls Trail Bridge Replacements
Replacement of 2 failing bridges with new bridges in more sustainable locations, with trail reroutes leading to the new locations. Bridges 70'-80' in length each, with about 750' of new trail total.
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
📍 Skykomish Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Forestwide Thinning Analysis
This analysis will streamline the implementation of commercial thinning treatments designed to increase structural diversity of overstocked and planted stands and provide a sustainable flow of timber to local communities.
LFDC Commented Learn About Thinning
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Martin Gap Restoration Thinning Project
This project aims to restore forest health and resilience, improve wildlife habitat, and support native plants that are important to Tribal communities by thinning and diversifying previously regenerated plantation stands.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
📍 Snoqualmie Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
North Fork Stillaguamish Landscape Analysis
Landscape scale analysis of habitat restoration, and actions to improve ecological conditions.
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
South Fork Canyon Creek Road Bridge Removal and Footbridge Install
Removal of the failed FSR 41 road bridge over the South Fork of Canyon Creek and removal of earth abutments in the creekbed to restore natural hydrologic flow. Construction of a footbridge for access to the area north of the creek for recreation use.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Darrington Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Tenas Creek Restoration Project
The Darrington Ranger District proposes to replace a bridge on the Suiattle River Road to improve an important Chinook Salmon run and restore important salmon habitat for species.
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
📍 Darrington Ranger District 🏷 Road management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
Uncategorized
Uncategorized
Colville National Forest
49 Degrees North Mountain Resort Enhancement
New bike park and alpine roller coaster for summer use. Expansion of snowmaking to include additional terrain and reservoirs. Modification of 4 ski trails to improve access. Construction of Saddle Lodge and restrooms.
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
📍 Newport Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Boulder Park Ecological Resotration Project
placeholder
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog supplemental
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Chewelah A-Z
Placeholder
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Harvey Creek Subwatershed Restoration
placeholder
Learn About Thinning
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Leclerc Creek Grazing Allotment Management Planning
Analyze the options for management of grazing in the LeClerc Creek drainage.
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
📍 Sullivan Lake Ranger District 🏷 Grazing management Added: 2026-05-28
Cancelled
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
Uncategorized
Uncategorized
Colville National Forest
Meadow Lakes
Placeholder
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Meadow Maintenance
Maintain Meadows by removing encroaching conifers and maintaining infrastructure (e.g. exclosures, boulders).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
📍 Newport Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Quartz
Up to 2,900 acres of forest health treatments, about 4 miles of hand and machine fireline to support prescribed fire underburning, about 3 miles of temporary road access to treatment units, reconstruction of about 5 miles of existing non-system road templates (all 8 miles would be decommissioned).
Learn About Wildfire Learn About Thinning
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Slate
Improve forest health and resilience to disturbance through 13,000 acres of forest thinning, and improve aquatic and wildlife habitat with over 6 miles of instream restoration projects.
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Sweet-Ione Integrated Resources Improvement Project
Create a range of forest structural stages that supports resilience and is compatible with characteristic disturbance processes (wildland fire, insects and diseases), and supports aquatic and terrestrial habitat conditions and associated species.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Sxwuytn-Kaniksu Connections (Trail) Project
This is a multi-faceted project focusing on restoring healthy forests, connecting lands and people, improving watershed function, and providing economic stability.
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Tacoma Creek Salvage
Salvage trees within previously identified units of the Swamp Creek sale area that burned in the Tacoma Creek Fire.
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Tonata Trout
A project to conduct vegetation and fuels management, meadow restoration, aquatic restoration, and other work in the Tonata Trout project area.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Recreation management · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Upper West Branch LeClerc Creek fish Management Structure
Installation of a fish management structure on Upper West Branch LeClerc Creek for the purpose of non-native trout eradication by WDFW and Kalispel Tribe
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Significant Effect
Significant Effect
Siuslaw National Forest
Five Green Restoration Project
The project purpose is thinning stands less than 80 years old in order to enhance and accelerate old-growth conditions in Late Successional Reserve and Matrix areas. There are commercial thinning actions as well as road work, invasive weed treatments, and slash disposal.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Central Coast Ranger District-ODNRA 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Siuslaw National Forest
Forest Plan Amendment for Wilderness Management
Updating standards, guidelines, and other Forest Plan components for stewardship of the Siuslaw's four wilderness areas. Responding to changed conditions since Forest Plan approval, including designation of new wilderness in 2019.
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Special area management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Integrated Invasive Species Project
This project would develop a strategy that allows an array of tools to be used for reducing invasive weeds across the Siuslaw NF. One component would add four new chemicals to approved use list, requiring a plan amendment. https://bit.ly/3RT9D4e
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Wildlife, fish, rare plants · Vegetation management (other than forest products) · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
North Fork Smith Restoration
This is a landscape-scale terrestrial restoration project in the North Fork Smith River watershed area. Activities include: plantation thinning, wildlife habitat enhancement, invasive plant treatments, and road improvements.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Yamina (Yamhill-Willamina) Restoration Project
The Yamina project will focus on commercial thinning to support development of old growth characteristics for the future in the Yamhill-Willamina Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
📍 Hebo Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
Uncategorized
Uncategorized
Inyo National Forest
Crystal Crag Water Storage Tank Replacement
The removal of two existing water storage tanks & constructing a new one. The new steel water storage tank will be 20,000-gallons, 16-foot diameter and 16 ft high. Including new inlet, outlet, drain, overflow, water supply, and distribution pipelines
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
E. Clampus Vitus Bodie Chapter No. 64 Tamarack Lodge Plaque
Bodie Chapter No. 64 of E. Clampus Vitus is to construct a historical marker w/ bronze plaque northeast of the Tamarack Lodge entrance commemorating the history of the Lodge & its contribution to the history of Mono County and the Mammoth Lakes Basin
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Mammoth Ranger District 🏷 Heritage resource management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
LADWP Long Valley Pole Removal and Pole Replacement Project
LADWP Utility Maintenance Project:1)removal of poles & replacement of poles in one line and 2)removal of poles & rehab in second line, 3)relinquish poles
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Long Valley Exploration Drilling
On November 12, 2025, the Mammoth Lakes Ranger District of the Inyo National Forest received a Plan of Operations (Plan) from KORE USA Ltd. (KORE) for their Long Valley Exploration Drilling project in Mono County, California. KORE plans to conduct exploration-level activities for deposits of gold.
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
📍 Inyo National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Inyo National Forest
Mammoth Mountain Main Lodge Redevelopment
Mammoth Mountain proposes redeveloping its Main Lodge area on private land, with related development on adjacent National Forest lands. Joint CEQA/NEPA analysis. Proposed construction/reconstruction of parking lots,buildings,chairlifts and ski runs.
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management · Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Permit Reissuances - Ongoing, various permit types
Ongoing and continuous reissuance of various special use authorizations. Examples of these are resorts, research activities, utilities and events. For further information on any specific permit or permitted activities, contact Erin Noesser.
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
Restorative Impact
Restorative Impact
Inyo National Forest
Reds Meadow Valley Recreation Site Renovations
Renovations & ecological restoration at 7 recreation sites / campgrounds in Reds Meadow Valley designed to enhance overall visitor experience, ensure recreation assets support current & future visitation & protect/restore ecologically sensitive areas
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/08/2024
Decision 12/2024 (Estimated)
Implementation 06/2025 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Rock Creek Lodge Resort Wildfire Resilience
Fuels reduction and forest resilience project surrounding the Rock Creek Lakes Resort permit area on the Inyo National Forest. Project is funded by a National Resources Conservation Service grant.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Sherwin Area Recreation Plan 3 (SHARP)
Development of designated trails for protection of natural and cultural resources. This proposed action includes decommissioning of user created trails, reconstruction of user created trails, and new trail construction.
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)