162 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
38 of 162 active projects
Mixed Impact
Mixed Impact
Taking Objections Now! 7/1/26 11:59 PM PDT
Olympic National Forest
Canyon Forest Restoration
Proposed Action proposes variable density thinning of forest stands in a manner that progresses towards development of late-successional forest wildlife habitat, while protecting existing habitat. Harvesting activities are estimated to be 36% ground-based harvest, 23% cable yardin
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
📍 Olympic National Forest 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
4 Days Left to Comment
Taking Objections Now! 7/1/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
Significant Effect
Significant Effect
Taking Objections Now! 7/31/26 11:59 PM PDT
Willamette National Forest
Dead Mountain
Timber harvest, small diameter fuels reduction, roadside fuels reductions, burn blocks, and recreation management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
34 Days Left to Comment
Taking Objections Now! 7/31/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Taking Comments Now! 6/30/26 11:59 PM PDT
Los Padres National Forest
Wildfire Risk Reduction Project (formerly the Ecological Restoration Project) PALS # 62369
The project is designed to increase community/infrastructure protection, improve wildfire containment opportunities, and improve vegetation resilience to environmental stressors. A notice of Emergency Situation Determination approval has been posted. Comments will be accepted from June 24-30, 2026.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
📍 Los Padres National Forest 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
3 Days Left to Comment
Taking Comments Now! 6/30/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
South Wasco Ecosystem Resiliency
The project proposes to conduct commercial and non-commercial fuels and vegetation treatments on approximately 19,000 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-06-15
Developing Proposal
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Mixed Impact
Mixed Impact
Olympic National Forest
Flood Damage Road Repairs
Proposed treatment of multiple sites along FS Roads 29, 30, 2922, and 2932 damaged in storm events. Range of activities proposed: debris clearing, culvert replacement, fill removal, bank stabilization, temporary bridges to restore access.
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Olympic National Forest All Units 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Anvil Vegetation Management Project
This project seeks to improve forest health and diversity in plantations. In addition, this project seeks to reduce excessive fuel loading primarily along forest roads. Approximately 4,000 acres may be proposed for vegetation and fuels treatments.
Learn About Wildfire Learn About Thinning
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Clear Branch Dam Remediation
There is a need to remediate Clear Branch Dam to meet current dam safety and environmental compliance standards in order to continue to provide a clean dependable water supply for the Upper Hood River valley. More information at: clearbranchdam.com.
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Lost Lake Late Successional Reserve Acre Swap
There is a need to amend the Forest Plan to remove the high use recreational area of Lost Lake Resort, Campground and Day Use Area from Late-successional Reserve (LSR), and reallocate more appropriate areas as LSR.
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Timberline Chairlifts and Improvements
To improve connectivity between Summit Pass and Timberline Lodge, enhance skiing experience, and improve communications, the following is proposed: replacement of Summit Pass chairlift and new chairlift construction, ski terrain improvements, and fiber optic cable installation.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2022 ODOT rock stockpile
Expand the Santiam Pass Oregon Department of Transportation (ODOT) rock disposal site by 5 acres and build a short connecting road to the Santiam sand shed. Accomplished by blading away native soil and vegetation with standard earth moving equipment.
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2024 McKenzie River Trail Connector
McKenzie River Ranger District wants to complete construction of a short trail connection between the newly installed trail bridge at the Deer Creek to Forest Service Road 2654 in support of the McKenzie River National Recreation Trail #3507.
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
Big Lake Boat Launch
The McKenzie River Ranger District is proposing to add a temporary dock to the boat launch at the Big Lake Campground Boat Launch. The proposed dock will be a temporary dock that can be pulled in and out each season.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
CF Thin
The McKenzie River Ranger District is proposing approximately 125 acres of variable density thinning in three 65-70 year old plantation stands.
Learn About Thinning
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Cala-Wiley
The district proposes to treat 899 acres of under 80 plantations using thinning, dominant tree releases, gap creation, and skips then fuel treatments.
Learn About Wildfire Learn About Thinning
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Campground Host Site Improvements
Underground plastic holding tanks would be installed at many campgrounds within 10 feet of trailer pad. If the current host site is unsuitable, a new site could be selected. Parking barriers would be installed to prevent driving over tanks.
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Divide
This project would commercially harvest about 1,918 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes meadow restoration and sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
📍 Willamette National Forest 🏷 Forest products · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
In Progress
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
Significant Effect
Significant Effect
Willamette National Forest
Fall Creek
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Fish Lake Fire Resilience
The purpose of this project is to reduce the abundance of ladder fuels and canopy densities adjacent to Fish Lake Historic Site that is within the Wildland Urban Interface (WUI).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Ivy Cliff
This project would commercially harvest about 2037 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes road density management, fuels improvement, sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Detroit Ranger District 🏷 Forest products · Land management planning · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lava Parks
Commercial harvest, rock pit expansion, meadows within units, Lava View Loop Viewpoint.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Little Owl Small Sale
Treat proposed units using a combination of commercial thinning, gaps, skips, and dominant tree release.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Roadside Hazardous Fuels Reduction
The Detroit Ranger District is proposing to create fuel breaks to reduce hazardous fuels on strategic roads across the District: 10, 1012, 2212, 2236, and low severity burn sections of 2231 and 2233.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
📍 Detroit Ranger District 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Scott Lake Parking Improvements
The project is proposing to create additional parking locations for a high use campground and trailhead.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Station Butte
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Strube Flats Fire Camp
This project would establish a permanent site for accommodating fire camps, and secure the site from motor vehicles by installing four gates at the entrances.
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Sunny Thin
The McKenzie River Ranger District is proposing to treat approximately 63 acres located in four stands. Stands #1-3 are approximately 30 years old, whilestand #10 is approximately 110 years old.
Learn About Wildfire Learn About Thinning
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Los Padres National Forest
Establishing Interim Direction for Oil & Gas Leasing Management
Amend the Los Padres Forest Plan and the Southern California Forest Plan to establish interim direction for processing new lease applications for oil and gas, and remove references to and withdraw the 2005 Oil and Gas Record of Decision. https://usfs-public.box.com/s/8hb9zdav0fv3huge15oga4bzaec0yji6
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
📍 Los Padres National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
Uncategorized
Uncategorized
Los Padres National Forest
Los Prietos Helibase
The proposal is to construct a helicopter pad, associated safety facilities, and office space for the module within the lower compound at the Los Prietos Ranger Station.
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
📍 Santa Barbara Ranger District 🏷 Facility management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
Significant Effect
Significant Effect
Los Padres National Forest
Mount Pinos Forest Health Project - PALS #58380
Healthy Forest thinning project designed to improve the health and vigor of the existing stands and to make the stands more resilient to stressors such as drought, insects & wildfire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
📍 Los Padres National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
Restorative Impact
Restorative Impact
Los Padres National Forest
Rose Valley Creek Restoration Project
This proposal aims to restore Rose Valley Creek to its historical stream function, form, and habitat to benefit native aquatic species and armor Rose Valley creek from future wildfires by bolstering the riparian zone.
MilestoneDate
Scoping Start 05/11/2022
Comment Period 06/09/2022
Decision 05/2025 (Estimated)
Implementation 08/2026 (Estimated)
📍 Ojai Ranger District 🏷 Wildlife, fish, rare plants · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/11/2022
Comment Period 06/09/2022
Decision 05/2025 (Estimated)
Implementation 08/2026 (Estimated)