The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
32 of 162 active projects
Significant Effect
Significant Effect
Taking Objections Now! 7/31/26 11:59 PM PDT
Willamette National Forest
Dead Mountain
Timber harvest, small diameter fuels reduction, roadside fuels reductions, burn blocks, and recreation management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
34 Days Left to Comment
Taking Objections Now! 7/31/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Forest Wide Thinning & Potential Control Line Treatments
The proposed action would include 2 primary elements: plantation thinning of previously regenerated stands under 80 years of age, and small diameter hand thinning within 500 feet of roadsides identified by fire management staff as PCLs for use in future wildfire management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Little White Salmon Forest Resiliency and Fire Risk Mitigation Project
Increase forest resiliency to climate-related stressors and mitigate fire risk to highly valued resources in the Little White Salmon Watershed. Proposed actions will include commercial timber harvest, fuels treatments and other restoration projects.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Adams South Climb / Cold Springs Trailhead Improvements
Trailhead improvements necessary to ensure quality visitor experiences, improved sanitation and safety, and resource protection and restoration in the vicinity of the Mt. Adams South Climb (#183) and Cold Springs (#72) trailheads.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Margaret Backcountry Toilet Replacement
Project proposes to replace aging toilet facilities at 8 backcountry campsites in the Mount Margaret Backcountry Area within Mount St. Helens National Volcanic Monument.
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
📍 Mount St. Helens National Volcanic Monument 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Review of Wind River Consent to Geothermal Lease Request
The Gifford Pinchot National Forest is responding to two requests provided by Bureau of Land Management to evaluate consent to lease two nominated parcels of Forest Service lands for geothermal exploration and development.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Spirit Lake Outflow Safety Improvement Project
The Project proposes to evaluate options to improve safety of the outflow at Spirit Lake located within the Mount St. Helens National Volcanic Monument. A draft Record of Decision and corresponding documents will be published on July 7, 2026 opening up Objections for the Project.
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Regulations, directives, orders Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2022 ODOT rock stockpile
Expand the Santiam Pass Oregon Department of Transportation (ODOT) rock disposal site by 5 acres and build a short connecting road to the Santiam sand shed. Accomplished by blading away native soil and vegetation with standard earth moving equipment.
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2024 McKenzie River Trail Connector
McKenzie River Ranger District wants to complete construction of a short trail connection between the newly installed trail bridge at the Deer Creek to Forest Service Road 2654 in support of the McKenzie River National Recreation Trail #3507.
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
Big Lake Boat Launch
The McKenzie River Ranger District is proposing to add a temporary dock to the boat launch at the Big Lake Campground Boat Launch. The proposed dock will be a temporary dock that can be pulled in and out each season.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
CF Thin
The McKenzie River Ranger District is proposing approximately 125 acres of variable density thinning in three 65-70 year old plantation stands.
Learn About Thinning
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Cala-Wiley
The district proposes to treat 899 acres of under 80 plantations using thinning, dominant tree releases, gap creation, and skips then fuel treatments.
Learn About Wildfire Learn About Thinning
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Campground Host Site Improvements
Underground plastic holding tanks would be installed at many campgrounds within 10 feet of trailer pad. If the current host site is unsuitable, a new site could be selected. Parking barriers would be installed to prevent driving over tanks.
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Divide
This project would commercially harvest about 1,918 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes meadow restoration and sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
📍 Willamette National Forest 🏷 Forest products · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
In Progress
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
Significant Effect
Significant Effect
Willamette National Forest
Fall Creek
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Fish Lake Fire Resilience
The purpose of this project is to reduce the abundance of ladder fuels and canopy densities adjacent to Fish Lake Historic Site that is within the Wildland Urban Interface (WUI).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Ivy Cliff
This project would commercially harvest about 2037 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes road density management, fuels improvement, sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Detroit Ranger District 🏷 Forest products · Land management planning · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lava Parks
Commercial harvest, rock pit expansion, meadows within units, Lava View Loop Viewpoint.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Little Owl Small Sale
Treat proposed units using a combination of commercial thinning, gaps, skips, and dominant tree release.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Roadside Hazardous Fuels Reduction
The Detroit Ranger District is proposing to create fuel breaks to reduce hazardous fuels on strategic roads across the District: 10, 1012, 2212, 2236, and low severity burn sections of 2231 and 2233.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
📍 Detroit Ranger District 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Scott Lake Parking Improvements
The project is proposing to create additional parking locations for a high use campground and trailhead.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Station Butte
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Strube Flats Fire Camp
This project would establish a permanent site for accommodating fire camps, and secure the site from motor vehicles by installing four gates at the entrances.
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Sunny Thin
The McKenzie River Ranger District is proposing to treat approximately 63 acres located in four stands. Stands #1-3 are approximately 30 years old, whilestand #10 is approximately 110 years old.
Learn About Wildfire Learn About Thinning
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date