162 total Reset
The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
Showing: Uncategorized · Mixed Impact · Significant Effect
Mixed Impact
Mixed Impact
Taking Objections Now! 7/1/26 11:59 PM PDT
Olympic National Forest
Canyon Forest Restoration
Proposed Action proposes variable density thinning of forest stands in a manner that progresses towards development of late-successional forest wildlife habitat, while protecting existing habitat. Harvesting activities are estimated to be 36% ground-based harvest, 23% cable yardin
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
📍 Olympic National Forest 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
4 Days Left to Comment
Taking Objections Now! 7/1/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
Significant Effect
Significant Effect
Taking Comments Now! 6/29/26 11:59 PM PDT
Umatilla National Forest
Battle Bruin Integrated Vegetation Management Project
This project proposes to restore a healthy, diverse, and resilient forest ecosystem and create defensible fuel breaks for use during wildfire emergencies through the use of mechanical and non-mechanical thinning and fuels treatments, reforestation, and seeding and planting of native plants.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
2 Days Left to Comment
Taking Comments Now! 6/29/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
Significant Effect
Significant Effect
Taking Objections Now! 7/31/26 11:59 PM PDT
Willamette National Forest
Dead Mountain
Timber harvest, small diameter fuels reduction, roadside fuels reductions, burn blocks, and recreation management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
34 Days Left to Comment
Taking Objections Now! 7/31/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Taking Comments Now! 6/30/26 11:59 PM PDT
Los Padres National Forest
Wildfire Risk Reduction Project (formerly the Ecological Restoration Project) PALS # 62369
The project is designed to increase community/infrastructure protection, improve wildfire containment opportunities, and improve vegetation resilience to environmental stressors. A notice of Emergency Situation Determination approval has been posted. Comments will be accepted from June 24-30, 2026.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
📍 Los Padres National Forest 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
3 Days Left to Comment
Taking Comments Now! 6/30/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore A-Cam
This project proposes installing 5,631 feet of fiber optic near Butte Valley Airport, and another 4,740 feet south of the airport. Actions for the underground conduit install would require cable plow and directional boring within the existing right of way.
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
📍 Goosenest Ranger District 🏷 Special use management Added: 2026-06-26
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
Significant Effect
Significant Effect
Fremont-Winema National Forest
Lake of the Woods Fuel Break
Project uses understory thinning, mastication, and prescribed fire to create and maintain fuel breaks and defensible space. Small trees are thinned, slash piled or burned, and fuels reduced through hand/machine piling, pile burning, underburning, and mastication.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Klamath Ranger District 🏷 Fuels management Added: 2026-06-18
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Buckhorn Project
Vegetation management, fuels management, and aquatic restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
📍 Tonasket Ranger District 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management Added: 2026-06-15
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
South Wasco Ecosystem Resiliency
The project proposes to conduct commercial and non-commercial fuels and vegetation treatments on approximately 19,000 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-06-15
Developing Proposal
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
2025 Mt. Baker Geothermal Consent to Lease
To explore or develop geothermal resources on National Forest lands, the USFS must consent to lease areas nominated by the BLM. This analysis does not authorize ground disturbance, but creates stipulations for authorized leasing areas. https://usfs-public.box.com/s/r56gzyn1msyfvj8md81arv1mo15tgoso
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
📍 Mt. Baker Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Deception Falls Trail Bridge Replacements
Replacement of 2 failing bridges with new bridges in more sustainable locations, with trail reroutes leading to the new locations. Bridges 70'-80' in length each, with about 750' of new trail total.
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
📍 Skykomish Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Forestwide Thinning Analysis
This analysis will streamline the implementation of commercial thinning treatments designed to increase structural diversity of overstocked and planted stands and provide a sustainable flow of timber to local communities.
LFDC Commented Learn About Thinning
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Martin Gap Restoration Thinning Project
This project aims to restore forest health and resilience, improve wildlife habitat, and support native plants that are important to Tribal communities by thinning and diversifying previously regenerated plantation stands.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
📍 Snoqualmie Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
North Fork Stillaguamish Landscape Analysis
Landscape scale analysis of habitat restoration, and actions to improve ecological conditions.
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
South Fork Canyon Creek Road Bridge Removal and Footbridge Install
Removal of the failed FSR 41 road bridge over the South Fork of Canyon Creek and removal of earth abutments in the creekbed to restore natural hydrologic flow. Construction of a footbridge for access to the area north of the creek for recreation use.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Darrington Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Tenas Creek Restoration Project
The Darrington Ranger District proposes to replace a bridge on the Suiattle River Road to improve an important Chinook Salmon run and restore important salmon habitat for species.
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
📍 Darrington Ranger District 🏷 Road management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
Mixed Impact
Mixed Impact
Olympic National Forest
Flood Damage Road Repairs
Proposed treatment of multiple sites along FS Roads 29, 30, 2922, and 2932 damaged in storm events. Range of activities proposed: debris clearing, culvert replacement, fill removal, bank stabilization, temporary bridges to restore access.
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Olympic National Forest All Units 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Canyon and Trout Creek Trail Bridge Replacements 2024
Replace damaged trail bridges at Jackita Ridge trail # 738 over Canyon Creek and W. Fork Methow trail #480 over Trout Creek.
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Methow Valley Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Chelan PUD Fiber Optic Installation Project
The project proposes aerial fiber optic installation, use, operation, and maintenance along roads within the existing transmission line right-of-way.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
📍 Wenatchee River Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Forest-wide Tree Seed Orchard Fire Protection Project
Maintain and protect developed tree seed orchards by thinning trees and maintaining fuel break in the surrounding 300 foot buffer.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
📍 Okanogan-Wenatchee National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Icicle Creek Rockfall Mitigation project
Provide rockfall mitigation on up to three slopes on Icicle Creek Road from MP4.3 to 4.8. Project is scheduled to be completed Fall of 2023.
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
📍 Wenatchee River Ranger District 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Midnight Restoration
Landscape-scale wildfire risk reduction and terrestrial restoration project in Rader Creek, lower Wolf Creek, and upper Twisp River drainages. Excludes Lake Chelan-Sawtooth Wilderness.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Fuels management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Planning and Management of Domestic Sheep and Goat Grazing within the Range of Bighorn Sheep
Proposal to amend Land and Resource Management Plans to provide forest plan direction for managing domestic sheep and goat grazing within the range of Bighorn sheep to better provide for bighorn sheep viability in the context of range management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Okanogan-Wenatchee National Forest 🏷 Grazing management · Land management planning · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
South Fork Tieton Prescribed Fire Project
Wildfire Crisis Strategy Project
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Naches Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Methow
Landscape-scale wildfire risk reduction and terrestrial restoration project in Goat Creek, Cub Creek and Lost River drainages using emergency authorities.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Swauk Restoration Project
Fuels & Forest Health EAD Project. Proposing forest restoration activities including commercial and non-commercial thinning, prescribed fire, fuels breaks, aquatic restoration activities, and transportation system changes.
Learn About Wildfire Learn About Thinning
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
📍 Cle Elum Ranger District 🏷 Forest products · Fuels management · Road management · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
White Pass Ski Area - Chairlift 4 Replacement Project
White Pass proposes to replace the existing double chairlift with a new quad chairlift. The new lift would be installed in the same alignment as the current lift, with the same bottom and top terminal locations.
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Naches Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Forest Wide Thinning & Potential Control Line Treatments
The proposed action would include 2 primary elements: plantation thinning of previously regenerated stands under 80 years of age, and small diameter hand thinning within 500 feet of roadsides identified by fire management staff as PCLs for use in future wildfire management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Little White Salmon Forest Resiliency and Fire Risk Mitigation Project
Increase forest resiliency to climate-related stressors and mitigate fire risk to highly valued resources in the Little White Salmon Watershed. Proposed actions will include commercial timber harvest, fuels treatments and other restoration projects.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Adams South Climb / Cold Springs Trailhead Improvements
Trailhead improvements necessary to ensure quality visitor experiences, improved sanitation and safety, and resource protection and restoration in the vicinity of the Mt. Adams South Climb (#183) and Cold Springs (#72) trailheads.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Margaret Backcountry Toilet Replacement
Project proposes to replace aging toilet facilities at 8 backcountry campsites in the Mount Margaret Backcountry Area within Mount St. Helens National Volcanic Monument.
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
📍 Mount St. Helens National Volcanic Monument 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Review of Wind River Consent to Geothermal Lease Request
The Gifford Pinchot National Forest is responding to two requests provided by Bureau of Land Management to evaluate consent to lease two nominated parcels of Forest Service lands for geothermal exploration and development.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Spirit Lake Outflow Safety Improvement Project
The Project proposes to evaluate options to improve safety of the outflow at Spirit Lake located within the Mount St. Helens National Volcanic Monument. A draft Record of Decision and corresponding documents will be published on July 7, 2026 opening up Objections for the Project.
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Regulations, directives, orders Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
49 Degrees North Mountain Resort Enhancement
New bike park and alpine roller coaster for summer use. Expansion of snowmaking to include additional terrain and reservoirs. Modification of 4 ski trails to improve access. Construction of Saddle Lodge and restrooms.
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
📍 Newport Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Boulder Park Ecological Resotration Project
placeholder
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog supplemental
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Chewelah A-Z
Placeholder
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Harvey Creek Subwatershed Restoration
placeholder
Learn About Thinning
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Leclerc Creek Grazing Allotment Management Planning
Analyze the options for management of grazing in the LeClerc Creek drainage.
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
📍 Sullivan Lake Ranger District 🏷 Grazing management Added: 2026-05-28
Cancelled
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
Uncategorized
Uncategorized
Colville National Forest
Meadow Lakes
Placeholder
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Meadow Maintenance
Maintain Meadows by removing encroaching conifers and maintaining infrastructure (e.g. exclosures, boulders).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
📍 Newport Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Quartz
Up to 2,900 acres of forest health treatments, about 4 miles of hand and machine fireline to support prescribed fire underburning, about 3 miles of temporary road access to treatment units, reconstruction of about 5 miles of existing non-system road templates (all 8 miles would be decommissioned).
Learn About Wildfire Learn About Thinning
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Slate
Improve forest health and resilience to disturbance through 13,000 acres of forest thinning, and improve aquatic and wildlife habitat with over 6 miles of instream restoration projects.
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Sweet-Ione Integrated Resources Improvement Project
Create a range of forest structural stages that supports resilience and is compatible with characteristic disturbance processes (wildland fire, insects and diseases), and supports aquatic and terrestrial habitat conditions and associated species.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Sxwuytn-Kaniksu Connections (Trail) Project
This is a multi-faceted project focusing on restoring healthy forests, connecting lands and people, improving watershed function, and providing economic stability.
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Tacoma Creek Salvage
Salvage trees within previously identified units of the Swamp Creek sale area that burned in the Tacoma Creek Fire.
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Tonata Trout
A project to conduct vegetation and fuels management, meadow restoration, aquatic restoration, and other work in the Tonata Trout project area.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Recreation management · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Upper West Branch LeClerc Creek fish Management Structure
Installation of a fish management structure on Upper West Branch LeClerc Creek for the purpose of non-native trout eradication by WDFW and Kalispel Tribe
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
AT&T Cell Tower Replacement
Crown Castle (Agent for AT&T) is proposing to replace 80 foot existing self-support tower with a 150 foot self-support tower to provide elevation and space for equipment for 4 wireless communication providers and other users requesting collocation.
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
North Fork Diamond Bridge Replacement
Replacement of the North Fork Bridge that was burned in the Smith River complex fire.
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
📍 Wild Rivers Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Snowy Butte Landscape Restoration Project
The District is proposing a vegetation and watershed restoration project in collaboration with the Medford Watershed Commission to support fire resiliency and forest health in spring-fed water supply of the Big Butte Springs Municipal Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
📍 High Cascades Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Special area management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Thompson Creek Fuel Break
Treatments will reduce fuels and protect large residual trees by manually cutting brush and select live trees eight-inch DBH and under, ten-inch DBH and under of dead trees, hand piling, and pile burning within the project footprint.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Yellowjacket
The Yellowjacket Project aims to reduce hazardous fuels, and foster a more fire, insect, and disease resilient forest. This project will help to protect vulnerable communities from catastrophic wildfires by tying into past treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Bull Run Restoration Geotechnical Analysis CE
Bull Run Meadows Restoration Project geotechnical analysis of current subsurface substrates in mine waste piles. Excavation of a trench 8-10 feet deep, 3 feet wide and 12 feet long. Total disturbance will be less than 1/10th acre.
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Wallowa-Whitman National Forest All Units 🏷 Wildlife, fish, rare plants · Minerals and geology Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry DFPZ
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry Defensible Fuels Profile Zone
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Meadow Creek Watershed Restoration
Hazardous fuel reduction, watershed restoration, and research
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
ODOT Summit Point Communication Site, SUP PIN201802
Renewal of communication tower lease.
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Race Cow Project
Improve forest resilience, reduce hazardous fuels, enhance native grasslands, improve road access, develop two rock pits, reduce sediment delivery, provide timber products. Requesting EAD under IIJA, comment period per IIJA offered if granted.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Salmon River Ranger District 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Red Cougar Integrated Vegetation Management
Hazardous fuels reduction using prescribed burning, commercial and noncommercial thinning.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Sufferin' Springs Vegetation Management Project
Hazardous fuels reduction within stands at high risk for insect and disease out break as well as a high risk fireshed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Fremont-Winema National Forest
BPA-Lapine-Chiloquin Priority Pole Project
BPA has identified roads that require maintenance to ensure safe access to the LAPI-CHIL-1 transmission facilities. The road maintenance will allow BPA to also perform wood pole replacements that need to be completed along the transmission line.
MilestoneDate
Scoping Start 01/24/2023
Decision 06/2024 (Estimated)
Implementation 08/2024 (Estimated)
📍 Chemult Ranger District 🏷 Special use management · Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/24/2023
Decision 06/2024 (Estimated)
Implementation 08/2024 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Buck/Indian North Boundary Fence
There is a need to re-establish the northern boundary of the Buck/Indian cattle allotment to allow better management of the northern section of the allotment.
MilestoneDate
Scoping Start 01/23/2025
Decision 04/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Klamath Ranger District 🏷 Grazing management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/23/2025
Decision 04/2026 (Estimated)
Implementation 07/2026 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Buffalo Meadow Warming Shelter Project
This project proposes to install a pre-engineered shelter on the edge of a large meadow, known locally as Buffalo Meadow.
MilestoneDate
Scoping Start 01/18/2022
Decision 08/2026 (Estimated)
Implementation 11/2026 (Estimated)
📍 Klamath Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/18/2022
Decision 08/2026 (Estimated)
Implementation 11/2026 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Chiloquin Sewer project
This project will connect the Chiloquin Ranger District to the town of Chiloquin's sewer line
MilestoneDate
Scoping Start 03/20/2015
Decision 01/1970 (Estimated)
Implementation 06/2015 (Estimated)
📍 Chiloquin Ranger District 🏷 Facility management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 03/20/2015
Decision 01/1970 (Estimated)
Implementation 06/2015 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Mt. McLoughlin Trailhead Relocation Project
There is a need to relocate the Mt. Mcloughlin Trailhead and parking area to avoid initial and long-term maintenance costs associated with constructing a new bridge across the Cascade Canal.
MilestoneDate
Scoping Start 11/2024 (Estimated)
Comment Period 02/2025 (Estimated)
Objection Period Start 05/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 06/2026 (Estimated)
📍 Klamath Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 11/2024 (Estimated)
Comment Period 02/2025 (Estimated)
Objection Period Start 05/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Paddock Butte Prescribed Fire
Working together, Federal, State and Private land managers have the opportunity to reintroduce fire on an interagency landscape in the Paddock Butte area.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 10/30/2024
Decision 01/2025 (Estimated)
Implementation 04/2025 (Estimated)
📍 Bly Ranger District 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 10/30/2024
Decision 01/2025 (Estimated)
Implementation 04/2025 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Paradise Restoration Project
The primary purpose of the Paradise Restoration Project is ecosystem restoration. Action is needed to restore healthy forest ecosystems, improve wildlife habitats, and protect life, property, and infrastructure within and adjacent to the project area.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Bly Ranger District 🏷 Forest products · Fuels management · Land management planning · Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Fremont-Winema National Forest
Post-fire Competing Vegetation Management
The Forest Service is proposing to implement herbicide treatments for forest re-establishment and trail maintenance to reduce competing vegetation on approximately 43,000 acres of Forest System Lands that have been impacted by recent wildfires.
Learn About Wildfire Learn About Thinning
Acres 426,500
Acres 91,710
Acres 62,160
Acres 51,380
Acres (approx.) 43,000
Acres 8,946
MilestoneDate
NEPA Start Date 2/4/2026
Finding/Decision Date
📍 Fremont-Winema National Forest 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres 426,500
Acres 91,710
Acres 62,160
Acres 51,380
Acres (approx.) 43,000
Acres 8,946
MilestoneDate
NEPA Start Date 2/4/2026
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
2025 Crescent and Odell Lake Recreation Residence Small Projects Batch 1
Authorization was requested from 5 recreation residence owners on Crescent Lake, 4 owners on Odell Lake, and from the Shelter Cove Resort to complete minor upgrades or replacements such as deck or stair replacements and roof repairs.
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
Bend to Lava Lands Paved Path
Construct a non-motorized paved path that would provide connections to recreation sites south of Bend, OR. The entire length of the path would be from Baker Road to Lava Lands Visitor Center.
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
Class 1, Pedal-assist E-bikes on Select Trails
This project is considering the use of class 1 e-bikes on select trails with the designed use of bicycle. The proposed action includes 67 trails, totaling 161.4 miles as open to class 1 e-bikes.
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
📍 Deschutes National Forest 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Cougar Rock Restoration Project
The project proposes to maintain and restore resiliency and forest health and to address the potential risk of large-scale high severity wildfires. Proposed actions include thinning, mowing and prescribed burning on up to 2,800 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
📍 Sisters Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Crate Vegetation Management Project and Site-Specific Forest Plan Amendment
Vegetation management on approximately 18,168 acres to move forest conditions toward historic range of variability and improve forest resilience to disturbance to reduce the likelihood of uncharacteristic large-scale loss of forest habitat.
Learn About Thinning
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Flat Top Fire Site Preparation and Reforestation Project
This project proposes site preparation cutting and reforestation on approximately 9,530 acres that experienced a high basal area loss of vegetation as a result of the Flat Top Fire in 2024.
Learn About Wildfire Learn About Thinning
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Deschutes National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
Significant Effect
Significant Effect
Deschutes National Forest
Green Ridge Landscape Restoration
The project would maintain and restore forest conditions closer to the historic range of variability and contribute to the restoration of ecosystem process and function in the planning area. Timber products are an outcome of restoration activities.
Learn About Wildfire Learn About Thinning
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
📍 Sisters Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
MODA Active Management Project
The MODA Active Management Project proposes dry forest restoration techniques in order to improve and maintain the forested ecosystem of of the Moore Creek and Davis Creek Subwatersheds on the Crescent Ranger District.
Learn About Wildfire Learn About Thinning
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
📍 Crescent Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
Sisters Trail Additions and Realignments (STAR)
The STAR project proposes several trail actions including new trail construction, additions of existing routes to the official Forest Service trail system, as well as realignments and decommissioning of existing trails on the Sisters Ranger District.
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
📍 Sisters Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
Mixed Impact
Mixed Impact
Deschutes National Forest
Upper Black Butte Swamp Restoration
Upper Black Butte Swamp is a 34-acre wetland that has incised channels and drying out vegetation. The project would restore the fen through channel filling, planting native vegetation, aspen restoration and invasive weed management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
📍 Sisters Ranger District 🏷 Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
West Bend Trails Project
Trail modifications, such as reroutes, new trails, decommissioning to create a more sustainable trail network while minimizing resource impacts.
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
West Bend Vegetation Management Project
Moving the area toward a more resilient landscape, providing a diversity of habitats, & reducing hazardous fuels. Approximately 14,750 acres of commercial thinning, for a total of 22,000 acres proposed for thinning, mowing, and/or underburning.
Learn About Wildfire Learn About Thinning
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Anvil Vegetation Management Project
This project seeks to improve forest health and diversity in plantations. In addition, this project seeks to reduce excessive fuel loading primarily along forest roads. Approximately 4,000 acres may be proposed for vegetation and fuels treatments.
Learn About Wildfire Learn About Thinning
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Clear Branch Dam Remediation
There is a need to remediate Clear Branch Dam to meet current dam safety and environmental compliance standards in order to continue to provide a clean dependable water supply for the Upper Hood River valley. More information at: clearbranchdam.com.
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Lost Lake Late Successional Reserve Acre Swap
There is a need to amend the Forest Plan to remove the high use recreational area of Lost Lake Resort, Campground and Day Use Area from Late-successional Reserve (LSR), and reallocate more appropriate areas as LSR.
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Timberline Chairlifts and Improvements
To improve connectivity between Summit Pass and Timberline Lodge, enhance skiing experience, and improve communications, the following is proposed: replacement of Summit Pass chairlift and new chairlift construction, ski terrain improvements, and fiber optic cable installation.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
54 North Fuels Reduction and Huckleberry Restoration Project
To restore resilience in dry upland forests by protecting old trees, reducing surface fuels, reducing overall forest density, and shifting composition from intolerant to fire tolerant species. Improve habitat for huckleberry.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Fuels management · Heritage resource management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Blue Mountains Forest Plan Revision
Land Management Plan revision for the Malheur, Umatilla, and Wallowa-Whitman National Forests, which will provide management direction on approximately 4.9 million acres of public lands. https://www.fs.usda.gov/r06/umatilla/planning/blue-mountains-forest-plan-revision
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
📍 Umatilla National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Mottet Vegetation Management Project
Vegetation management project for stand structure and composition, socioeconomics by providing timber products.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Mt. Misery Snowshelter Relocation
Mt. Misery Snowshelter proposed to be moved to reduce ongoing impacts and comply with NHPA.
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
📍 Pomeroy Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2022 ODOT rock stockpile
Expand the Santiam Pass Oregon Department of Transportation (ODOT) rock disposal site by 5 acres and build a short connecting road to the Santiam sand shed. Accomplished by blading away native soil and vegetation with standard earth moving equipment.
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2024 McKenzie River Trail Connector
McKenzie River Ranger District wants to complete construction of a short trail connection between the newly installed trail bridge at the Deer Creek to Forest Service Road 2654 in support of the McKenzie River National Recreation Trail #3507.
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
Big Lake Boat Launch
The McKenzie River Ranger District is proposing to add a temporary dock to the boat launch at the Big Lake Campground Boat Launch. The proposed dock will be a temporary dock that can be pulled in and out each season.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
CF Thin
The McKenzie River Ranger District is proposing approximately 125 acres of variable density thinning in three 65-70 year old plantation stands.
Learn About Thinning
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Cala-Wiley
The district proposes to treat 899 acres of under 80 plantations using thinning, dominant tree releases, gap creation, and skips then fuel treatments.
Learn About Wildfire Learn About Thinning
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Campground Host Site Improvements
Underground plastic holding tanks would be installed at many campgrounds within 10 feet of trailer pad. If the current host site is unsuitable, a new site could be selected. Parking barriers would be installed to prevent driving over tanks.
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Divide
This project would commercially harvest about 1,918 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes meadow restoration and sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
📍 Willamette National Forest 🏷 Forest products · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
In Progress
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
Significant Effect
Significant Effect
Willamette National Forest
Fall Creek
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Fish Lake Fire Resilience
The purpose of this project is to reduce the abundance of ladder fuels and canopy densities adjacent to Fish Lake Historic Site that is within the Wildland Urban Interface (WUI).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Ivy Cliff
This project would commercially harvest about 2037 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes road density management, fuels improvement, sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Detroit Ranger District 🏷 Forest products · Land management planning · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lava Parks
Commercial harvest, rock pit expansion, meadows within units, Lava View Loop Viewpoint.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Little Owl Small Sale
Treat proposed units using a combination of commercial thinning, gaps, skips, and dominant tree release.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Roadside Hazardous Fuels Reduction
The Detroit Ranger District is proposing to create fuel breaks to reduce hazardous fuels on strategic roads across the District: 10, 1012, 2212, 2236, and low severity burn sections of 2231 and 2233.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
📍 Detroit Ranger District 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Scott Lake Parking Improvements
The project is proposing to create additional parking locations for a high use campground and trailhead.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Station Butte
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Strube Flats Fire Camp
This project would establish a permanent site for accommodating fire camps, and secure the site from motor vehicles by installing four gates at the entrances.
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Sunny Thin
The McKenzie River Ranger District is proposing to treat approximately 63 acres located in four stands. Stands #1-3 are approximately 30 years old, whilestand #10 is approximately 110 years old.
Learn About Wildfire Learn About Thinning
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Siuslaw National Forest
Five Green Restoration Project
The project purpose is thinning stands less than 80 years old in order to enhance and accelerate old-growth conditions in Late Successional Reserve and Matrix areas. There are commercial thinning actions as well as road work, invasive weed treatments, and slash disposal.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Central Coast Ranger District-ODNRA 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Siuslaw National Forest
Forest Plan Amendment for Wilderness Management
Updating standards, guidelines, and other Forest Plan components for stewardship of the Siuslaw's four wilderness areas. Responding to changed conditions since Forest Plan approval, including designation of new wilderness in 2019.
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Special area management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Integrated Invasive Species Project
This project would develop a strategy that allows an array of tools to be used for reducing invasive weeds across the Siuslaw NF. One component would add four new chemicals to approved use list, requiring a plan amendment. https://bit.ly/3RT9D4e
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Wildlife, fish, rare plants · Vegetation management (other than forest products) · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
North Fork Smith Restoration
This is a landscape-scale terrestrial restoration project in the North Fork Smith River watershed area. Activities include: plantation thinning, wildlife habitat enhancement, invasive plant treatments, and road improvements.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Yamina (Yamhill-Willamina) Restoration Project
The Yamina project will focus on commercial thinning to support development of old growth characteristics for the future in the Yamhill-Willamina Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
📍 Hebo Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Ash Creek Forest Health and Fuels Reduction Project
The Shasta-Trinity National Forest proposed the Ash Creek Forest Health and Fuels Reduction project to address high stand densities, on-going insect and disease outbreaks, and wildfire risk. Project information is available at: https://usfs-public.box.com/s/wqgxkuomwx42lfx6f31owbqoep2w5jyi
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 McCloud Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Big Ranch Community Risk Reduction
The Project designed to reduce the risks associated with high intensity wildfire and improve forest health and function through forest thinning, reduction of hazardous fuels, reforestation and prescribed fire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Junction City Community Risk Reduction Project PALS #68960
e Project is being designed to lower high- severity wildfire risk to the community of Junction City by reducing hazardous fuels around the community and improving forest health and resilience.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Weaverville Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. For more information, visit: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Minersville Boat Launching Facility Improvements
Remove existing asphalt boat ramp & replace with a two-lane, concrete, v-grooved, low-water ramp with turn-arounds & sidewalk. Add parking area above high water mark of Trinity Lake. Replace existing restroom with new restroom. Widen access driveway.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
North Trinity Community Risk Reduction
The proposed project is designed to reduce risk to rural communities from catastrophic wildfire by reducing hazardous fuels, increasing safety adjacent to critical egress/ingress routes, and improving the resiliency of forested ecosystems.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6
Authorize the use and occupancy of NFS lands for PG&E's Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PGE Hogback Microgrid 30-Year Permit Issuance
Issuance of a 30-year special use authorization to PG&E for construction, operation & maintenance of a remote microgrid on Hogback Mountain to replace the existing source of service via the existing Pit No. 7 1101 electric distribution 12KV line.
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Pit/Curl Cooperative Fuel Break Project
Create linear fuel breaks to modify future fire behavior and connect fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire while also reducing risk to nearby communities. For project documents, visit: https://usfs-public.box.com/s/7oxlzaz0ebn7zb1fjs9amje8izehgqwf
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Root Fire Hazard Abatement Project
The project is proposed to recover the economic value of fire impacted stands, reduce the risk from roadside hazards, accelerate forest recovery, and reduce the likelihood and intensity of a reburn. Project information is available at - https://usfs-public.box.com/s/al78orqta5ilowffv2snxq4ie6y0eemm
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
📍 Mt. Shasta Ranger District 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Trinity Divide / Lakehead Cooperative Fuel Break Project
Creation of linear fuel breaks to modify future fire behavior and connect with fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire and reduce risk to communities. For project documents visit: https://usfs-public.box.com/s/6a1i45z4za8fpq24158rf0mhjhresu8d
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP)Project
The Trinity Public Utilities District and the Western Area Power Administration (lead Federal agency) propose a right-of-way expansion and vegetation management project to reduce fire risk to the surrounding communities. STNF is a cooperating agency.
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Crystal Crag Water Storage Tank Replacement
The removal of two existing water storage tanks & constructing a new one. The new steel water storage tank will be 20,000-gallons, 16-foot diameter and 16 ft high. Including new inlet, outlet, drain, overflow, water supply, and distribution pipelines
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
E. Clampus Vitus Bodie Chapter No. 64 Tamarack Lodge Plaque
Bodie Chapter No. 64 of E. Clampus Vitus is to construct a historical marker w/ bronze plaque northeast of the Tamarack Lodge entrance commemorating the history of the Lodge & its contribution to the history of Mono County and the Mammoth Lakes Basin
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Mammoth Ranger District 🏷 Heritage resource management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
LADWP Long Valley Pole Removal and Pole Replacement Project
LADWP Utility Maintenance Project:1)removal of poles & replacement of poles in one line and 2)removal of poles & rehab in second line, 3)relinquish poles
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Long Valley Exploration Drilling
On November 12, 2025, the Mammoth Lakes Ranger District of the Inyo National Forest received a Plan of Operations (Plan) from KORE USA Ltd. (KORE) for their Long Valley Exploration Drilling project in Mono County, California. KORE plans to conduct exploration-level activities for deposits of gold.
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
📍 Inyo National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Inyo National Forest
Mammoth Mountain Main Lodge Redevelopment
Mammoth Mountain proposes redeveloping its Main Lodge area on private land, with related development on adjacent National Forest lands. Joint CEQA/NEPA analysis. Proposed construction/reconstruction of parking lots,buildings,chairlifts and ski runs.
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management · Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Permit Reissuances - Ongoing, various permit types
Ongoing and continuous reissuance of various special use authorizations. Examples of these are resorts, research activities, utilities and events. For further information on any specific permit or permitted activities, contact Erin Noesser.
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Rock Creek Lodge Resort Wildfire Resilience
Fuels reduction and forest resilience project surrounding the Rock Creek Lakes Resort permit area on the Inyo National Forest. Project is funded by a National Resources Conservation Service grant.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Sherwin Area Recreation Plan 3 (SHARP)
Development of designated trails for protection of natural and cultural resources. This proposed action includes decommissioning of user created trails, reconstruction of user created trails, and new trail construction.
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Los Padres National Forest
Establishing Interim Direction for Oil & Gas Leasing Management
Amend the Los Padres Forest Plan and the Southern California Forest Plan to establish interim direction for processing new lease applications for oil and gas, and remove references to and withdraw the 2005 Oil and Gas Record of Decision. https://usfs-public.box.com/s/8hb9zdav0fv3huge15oga4bzaec0yji6
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
📍 Los Padres National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
Uncategorized
Uncategorized
Los Padres National Forest
Los Prietos Helibase
The proposal is to construct a helicopter pad, associated safety facilities, and office space for the module within the lower compound at the Los Prietos Ranger Station.
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
📍 Santa Barbara Ranger District 🏷 Facility management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
Significant Effect
Significant Effect
Los Padres National Forest
Mount Pinos Forest Health Project - PALS #58380
Healthy Forest thinning project designed to improve the health and vigor of the existing stands and to make the stands more resilient to stressors such as drought, insects & wildfire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
📍 Los Padres National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
Discovery Day Mine
The Discovery Day Mins is an established mine site that consists of a road, three working pads, and underground tunnels. A Plan of Operations has been proposed to mine the Discovery Day claim
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. Project details: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
📍 Klamath National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
McKinney Fire Restoration EA_Veg/Fuels
The McKinney Fire Restoration EA is proposed within and adjacent to the 2022 McKinney Fire footprint with the purpose of increasing wildfire resilience on the landscape. Proposed activities include a variety of fuels reduction treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Oak Knoll Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
Seiad Restoration Thin
The project will treat 3,350 acres within the 4,648-acre project boundary for fire risk reduction and community and resource protection within the Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
📍 Klamath National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
South Fork
The South Fork project is an active management project with the purpose of addressing hazardous fuels conditions along roads and private property, as well as aligning with Executive Order 14225, Immediate Expansion of American Timber Production.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Klamath National Forest All Units 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
Uncategorized
Uncategorized
Tongass National Forest
Breiland Slough Cabin Replacement
Proposal to replace the existing Breiland Slough public use recreation cabin and improve access to the site.
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
📍 Petersburg Ranger District 🏷 Recreation management Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
Significant Effect
Significant Effect
Tongass National Forest
Continuation of Zarembo Minerals Plan of Operations 2023 to 2024
Proposal to continue authorizing exploration activities by Zarembo Minerals Co. on Zarembo Island until July 2023. Activities to continue include surface exploration and drilling, use of a closed spur road, and onsite storage of drilling equipment.
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Wrangell Ranger District 🏷 Minerals and geology Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD 2025 Chichagof Small Sales
To make 70 acres available for community access to small-scale timber sales utilizing ground-based logging systems without the use of heavy machinery to harvest. Multiple small sales provide for opportunities for harvest of firewood, sawlogs and other timber products for commercial use.
Learn About Thinning
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD Millrock Exploration Corp - Apex El Nido Project
The activity for the Apex-El Nido Exploration project entails conducting hard rock exploration through diamond core drilling. It is anticipated a maximum of 15 holes will be drilled.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF KMRD South Revillagigedo Integrated Resource Project
The Forest Service is proposing a multi-year project involving a variety of timber harvest, road construction, watershed restoration and recreation activities.
Learn About Thinning
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
📍 Ketchikan - Misty Ranger District 🏷 Forest products · Recreation management · Road management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Deer Lake Coho Rearing Facility Permit Re-Issuance (NSRAA)
Re-issue special use permit for coho rearing facility- run by NSRAA
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Hidden Falls Fish Hatchery Alaska Department of Fish and Game
Re-Issue of special use permit for a salmon hatchery run by Northern Southeast Regional Aquaculture Association.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF TBRD Twin Mountain II Timber Sale
The proposed action is expected to produce about 26.8 million board feet of timber from approximately 1,655 acres of National Forest System lands in the Staney and Red Bay areas within the Thorne Bay RD. Other activities include road construction, reconstruction, maintenance and decommissioning.
LFDC Commented Learn About Thinning
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
📍 Thorne Bay Ranger District 🏷 Forest products · Road management Added: 2026-05-28
Developing Proposal
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF Tongass National Forest Land Management Plan Revision
Land management plan revision for the Tongass National Forest under the 2012 Planning Rule.
LFDC Commented
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Tongass National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date