The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.

Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.

This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.

There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
Clear all
Show only: Significant Effect Mixed Impact Restorative Impact Uncategorized
Show only: Newly Added Taking Comments Now Show Inactive Projects
*Impact level assigned automatically, based on keywords and is intended as a general guide only
Showing: Significant Effect · Uncategorized · Mixed Impact
Mixed Impact
Mixed Impact
Taking Objections Now! 7/1/26 11:59 PM PDT
Olympic National Forest
Canyon Forest Restoration
Proposed Action proposes variable density thinning of forest stands in a manner that progresses towards development of late-successional forest wildlife habitat, while protecting existing habitat. Harvesting activities are estimated to be 36% ground-based harvest, 23% cable yardin
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
📍 Olympic National Forest 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
4 Days Left to Comment
Taking Objections Now! 7/1/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 6/21/2022
Finding/Decision Date
Significant Effect
Significant Effect
Taking Comments Now! 6/29/26 11:59 PM PDT
Umatilla National Forest
Battle Bruin Integrated Vegetation Management Project
This project proposes to restore a healthy, diverse, and resilient forest ecosystem and create defensible fuel breaks for use during wildfire emergencies through the use of mechanical and non-mechanical thinning and fuels treatments, reforestation, and seeding and planting of native plants.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
2 Days Left to Comment
Taking Comments Now! 6/29/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 4/2/2026
Finding/Decision Date
Significant Effect
Significant Effect
Taking Objections Now! 7/31/26 11:59 PM PDT
Willamette National Forest
Dead Mountain
Timber harvest, small diameter fuels reduction, roadside fuels reductions, burn blocks, and recreation management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
34 Days Left to Comment
Taking Objections Now! 7/31/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Taking Comments Now! 6/30/26 11:59 PM PDT
Los Padres National Forest
Wildfire Risk Reduction Project (formerly the Ecological Restoration Project) PALS # 62369
The project is designed to increase community/infrastructure protection, improve wildfire containment opportunities, and improve vegetation resilience to environmental stressors. A notice of Emergency Situation Determination approval has been posted. Comments will be accepted from June 24-30, 2026.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
📍 Los Padres National Forest 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
3 Days Left to Comment
Taking Comments Now! 6/30/26 11:59 PM PDT
Developing Proposal
MilestoneDate
NEPA Start Date 7/29/2022
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Blowdown Insect and Disease Management
Remove excess buildup of dead and down trees including incidental removal of standing stressed dying trees from areas along National Forest System roads 46, 4640, and 5710 to control insect infestation and spread.
Learn About Wildfire Learn About Thinning
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-06-26
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore A-Cam
This project proposes installing 5,631 feet of fiber optic near Butte Valley Airport, and another 4,740 feet south of the airport. Actions for the underground conduit install would require cable plow and directional boring within the existing right of way.
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
📍 Goosenest Ranger District 🏷 Special use management Added: 2026-06-26
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/26/2026
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Long Prairie Allotment - Reevaluation of Environmental Documents
The Long Prairie Allotment Decision Notice was signed in 2005. A Reevaluation of Environmental Documents (7 CFR 1b.9 (r)) was conducted to evaluate grazing on the Long Prairie Pasture within the allotment.
📍 Hood River Ranger District 🏷 Grazing management Added: 2026-06-24
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Lake of the Woods Fuel Break
Project uses understory thinning, mastication, and prescribed fire to create and maintain fuel breaks and defensible space. Small trees are thinned, slash piled or burned, and fuels reduced through hand/machine piling, pile burning, underburning, and mastication.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Klamath Ranger District 🏷 Fuels management Added: 2026-06-18
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD 2026 Harbor Mountain USGS Landslide Monitoring Equipment
Monitoring equipment includes a fiberglass electronics enclosure, mounted rain gauge, a Temp/RH sensor and three instrumented soil profiles. The monitoring equipment functions year-round with occasional maintenance. The USGS is requesting authorization to have the equipment on site for 10 years.
📍 Sitka Ranger District 🏷 Special use management Added: 2026-06-16
Completed
Mixed Impact
Mixed Impact
Colville National Forest
Buckhorn Project
Vegetation management, fuels management, and aquatic restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
📍 Tonasket Ranger District 🏷 Fuels management · Vegetation management (other than forest products) · Watershed management Added: 2026-06-15
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2024
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
South Wasco Ecosystem Resiliency
The project proposes to conduct commercial and non-commercial fuels and vegetation treatments on approximately 19,000 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-06-15
Developing Proposal
Acres (approx.) 19,000
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Fremont-Winema National Forest
QGold Exploration
Quartz Mountain Gold Ltd., a subsidiary of Q-Gold Resources Ltd., proposes to conduct mineral exploration activities on federal unpatented lode mining claims located on National Forest System (NFS) lands administered by the Fremont-Winema National Forest.
📍 Bly Ranger District 🏷 Minerals and geology Added: 2026-06-12
Completed
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
2025 Mt. Baker Geothermal Consent to Lease
To explore or develop geothermal resources on National Forest lands, the USFS must consent to lease areas nominated by the BLM. This analysis does not authorize ground disturbance, but creates stipulations for authorized leasing areas. https://usfs-public.box.com/s/r56gzyn1msyfvj8md81arv1mo15tgoso
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
📍 Mt. Baker Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/10/2025
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Baker River Watershed Landscape Analysis
This landscape-scale analysis would improve ecological conditions, enhance recreational opportunities, provide forest products to support local economies, and maintain public access to valuable resources.
Learn About Thinning
Acres (approx.) 106,000
MilestoneDate
Scoping Start 11/2025 (Estimated)
Comment Period 06/2026 (Estimated)
Objection Period Start 10/2026 (Estimated)
Decision 02/2027 (Estimated)
Implementation 05/2027 (Estimated)
📍 Mt Baker Ranger District 🏷 Recreation management · Wildlife, fish, rare plants · Forest products · Road management Added: 2026-05-28
On Hold
Acres (approx.) 106,000
MilestoneDate
Scoping Start 11/2025 (Estimated)
Comment Period 06/2026 (Estimated)
Objection Period Start 10/2026 (Estimated)
Decision 02/2027 (Estimated)
Implementation 05/2027 (Estimated)
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Big Four Boardwalk Replacement
Project proposal would replace 750 feet of boardwalk within the footprint of the original trail.
📍 Darrington Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Deception Falls Trail Bridge Replacements
Replacement of 2 failing bridges with new bridges in more sustainable locations, with trail reroutes leading to the new locations. Bridges 70'-80' in length each, with about 750' of new trail total.
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
📍 Skykomish Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 1/15/2025
Finding/Decision Date 6/4/2026
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
FSR 6020-110, Lake Serene Trailhead, Lake Serene Trail Temporary Closure Order NEPA
A temporary closure of National Forest System Road (FSR) 6020-110, the Lake Serene Trailhead, the entire length of the Lake Serene Trail, including the Bridal Veil Falls Trail.
📍 Skykomish Ranger District 🏷 Regulations, directives, orders Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Forestwide Thinning Analysis
This analysis will streamline the implementation of commercial thinning treatments designed to increase structural diversity of overstocked and planted stands and provide a sustainable flow of timber to local communities.
LFDC Commented Learn About Thinning
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/3/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Green Mountain Trail Re-route
The project would relocate 1600 feet of trail. The project would reduce grade and create safer terrain for hikers. The reduction in grade would also promote vegetation health along the trail, by minimizing impacts of erosion.
📍 Darrington Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Heather Lake Trail Bridge Replacement
Replacement in place of girder substructure and decking on the Heather Lake Trail at the outflow into Heather Creek.
📍 Darrington Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Heather Meadows Native Plant Restoration
Revegetation of degraded alpine meadow areas at a popular hiking area using native plant species. Installation of minimal visitor barriers (rebar, rope) to prevent trampling of revegetated areas.
Learn About Wildfire Learn About Thinning
📍 Mt Baker Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Horseshoe Bend Bypass for Deadhorse Project Access
The proposed action is to construct a bypass route around a road failure on FSR 37 to reestablish access to the Deadhorse Road Relocation Project area.
📍 Mt. Baker Ranger District 🏷 Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Martin Gap Restoration Thinning Project
This project aims to restore forest health and resilience, improve wildlife habitat, and support native plants that are important to Tribal communities by thinning and diversifying previously regenerated plantation stands.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
📍 Snoqualmie Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 3,834
MilestoneDate
NEPA Start Date 9/1/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Middle Fork Recreation Hub Project
Construct 1700' trail to Otter Falls. Construct 1.3mi Garfield Ledges trail starting at intersection of Rd 56/5640. Construct trail Mid Fork trailhead (TH) to Taylor R. bridge; add picnic sites.
📍 Snoqualmie Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Mt. Baker Ranger District ERFO Road Repair Project (FSR 3040)
Repair of storm-damaged roads under the Emergency Response for Federally Owned Roads (ERFO) program, including Forest Service led repair of FS Road 3040 at MP 1.6.
📍 Mt Baker Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
North Fork Stillaguamish Landscape Analysis
Landscape scale analysis of habitat restoration, and actions to improve ecological conditions.
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
📍 Mt. Baker-Snoqualmie National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/22/2022
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Panorama Point Boat Launch Improvements
Improve and maintain boat launching capabilities, provide improved toilet facilities and increase parking capacity to improve visitor safety at the Panorama Point boat launch.
📍 Mt Baker Ranger District 🏷 Recreation management · Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
MBS, Okan-Wen, Colville, Wallowa-Whitman, Fremont-Winema, Deschutes, Umatilla, Malheur
Region 6 Elite Tree Protection Project
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 R6 - Pacific Northwest Region All Units 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Skykomish District 2016 ERFO Road Repairs (FSR 6835)
Heavy rains during the winter of 2016 damaged FSR 6835 at MP 1.4, where soils became heavily saturated and caused a debris land slide. Project will remove the slide material, place base rock and surfacing, and add a cross drain culvert.
📍 Skykomish Ranger District 🏷 Road management · Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Snohomish County Search and Rescue Radio Repeaters
The Snohomish County Sheriffs Office Search and Rescue Unit operates and maintains repeaters at five locations in the Mt.Baker-Snoqualmie National Forest. This project seeks to allow the Sheriff's office to provide periodic maintenance and repairs.
📍 Darrington Ranger District 🏷 Special use management · Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Snoqualmie District 2016 ERFO Road Repairs-Gold Creek Trail Bridge
Repair of storm-damaged roads and trails in the Snoqualmie Ranger District, including Forest Service led repair work proposed for Gold Creek Trail Bridge. Additional repairs also led by Federal Highways Administration.
📍 Snoqualmie Ranger District 🏷 Road management · Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Snoqualmie District 2016 ERFO Road Repairs-NFS Road 50
Project to complete repairs of storm damage on NFS Road 50. Repairs would include embankment placement to grade to replace shoulder and roadway, including rock and root wad placement for bank stabilization, culvert cleaning, and road resurfacing.
📍 Snoqualmie Ranger District 🏷 Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Snoqualmie District 2016 ERFO Road Repairs-NFS Road 5078
Complete repairs of storm damage on NFS Road 5078. Repairs include removing woody debris and rock material out of the aggraded stream and rebuilding the road prism above the stream intersection.
📍 Snoqualmie Ranger District 🏷 Road management · Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Snoqualmie Lake trailhead improvements
Reconstruct the Snoqualmie Lake TH with additional and improved parking and add a toilet
📍 Snoqualmie Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Sound Salmon Solutions Riparian Restoration 2024
Sound Salmon Solutions staff will install approximately 9,000 total native plants in the riparian buffer of the South Fork Skykomish River in 5 separate parcels. Post-planting maintenance and monitoring will ensure survival of plants.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 10/2024 (Estimated)
Implementation 01/2025 (Estimated)
📍 Skykomish Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 10/2024 (Estimated)
Implementation 01/2025 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
South Fork Canyon Creek Road Bridge Removal and Footbridge Install
Removal of the failed FSR 41 road bridge over the South Fork of Canyon Creek and removal of earth abutments in the creekbed to restore natural hydrologic flow. Construction of a footbridge for access to the area north of the creek for recreation use.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Darrington Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
Stevens Pass Vault Toilet Installation
Stevens Pass Mountain Resort is replacing two long-term "temporary" porta-potties in parking lot #2 with 2 double-vault CXT prefabricated concrete toilets.
📍 Skykomish Ranger District 🏷 Recreation management · Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Tenas Creek Restoration Project
The Darrington Ranger District proposes to replace a bridge on the Suiattle River Road to improve an important Chinook Salmon run and restore important salmon habitat for species.
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
📍 Darrington Ranger District 🏷 Road management · Watershed management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 8/5/2022
Finding/Decision Date 4/16/2026
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
USGS Lahar Monitoring Stations
The U.S. Geological Survey-Cascades Volcano Observatory (USGS-CVO) has applied for a 20-year special use permit to install up to 5 new Lahar monitoring stations within the Carbon and White River drainages located to the NE of Mount Rainier volcano.
📍 Snoqualmie Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Baker-Snoqualmie National Forest
WSU Wolverine and Lynx Camera Stations
Partners deploying camera stations across multiple forests to assess habitat range and distribution of Canada Lynx and Wolverine over a period of 20 years.
📍 Mt Baker-Snoqualmie National Forest All Units 🏷 Special use management · Research Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Olympic National Forest
Flood Damage Road Repairs
Proposed treatment of multiple sites along FS Roads 29, 30, 2922, and 2932 damaged in storm events. Range of activities proposed: debris clearing, culvert replacement, fill removal, bank stabilization, temporary bridges to restore access.
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Olympic National Forest All Units 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 03/01/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Olympic National Forest
Mt Walker North Restroom Decommissioning
As part of sustainable recreation strategy and resource protection the two single-seat vault toilet structures at the north trailhead of Mt Walker would be removed and rehabilitated.
📍 Olympic National Forest All Units 🏷 Recreation management · Facility management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Canyon and Trout Creek Trail Bridge Replacements 2024
Replace damaged trail bridges at Jackita Ridge trail # 738 over Canyon Creek and W. Fork Methow trail #480 over Trout Creek.
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Methow Valley Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/02/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Chelan PUD Fiber Optic Installation Project
The project proposes aerial fiber optic installation, use, operation, and maintenance along roads within the existing transmission line right-of-way.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
📍 Wenatchee River Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 05/2026 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Chumstick to LP Project
Landscape scale terrestrial restoration project.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/25/2023
Comment Period 08/2025 (Estimated)
Decision 12/2025 (Estimated)
Implementation 01/2026 (Estimated)
📍 Wenatchee River Ranger District 🏷 Fuels management · Watershed management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 09/25/2023
Comment Period 08/2025 (Estimated)
Decision 12/2025 (Estimated)
Implementation 01/2026 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Cougar Creek Danger Trees
The Forest Service is proposing the removal of dead trees within 150 feet of selected roads. Any tree that is dead, and is within 150 feet of the road, will be subject to removal regardless of species.
Learn About Wildfire Learn About Thinning
📍 Entiat Ranger District 🏷 Road management · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Eagle Creek Project
Commercial, non-commercial, and fuels activities to reduce wildfire risk, improve timber sands and forest structure, and improve wildlife habitat.
Learn About Wildfire Learn About Thinning
📍 Wenatchee River Ranger District 🏷 Forest products · Fuels management · Wildlife, fish, rare plants Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Entiat River Road, North Fork Entiat Road, Duncan Road, Shady Pass Danger Tree Removal
Removal of dead trees within 150 feet of selected roads to address potential of dead trees falling on vehicles or people and blocking ingress/egress.
📍 Entiat Ranger District 🏷 Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
FSR6910 Road Repair and maintenance
Project is to issue a road use permit to T-Mobile to complete light maintenance road repairs to FSR6910 to the communications site on Round Mountain.
📍 Wenatchee River Ranger District 🏷 Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Forest-wide Tree Seed Orchard Fire Protection Project
Maintain and protect developed tree seed orchards by thinning trees and maintaining fuel break in the surrounding 300 foot buffer.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
📍 Okanogan-Wenatchee National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/01/2023
Decision 01/1970 (Estimated)
Implementation 11/2023 (Estimated)
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Icicle Creek Rockfall Mitigation project
Provide rockfall mitigation on up to three slopes on Icicle Creek Road from MP4.3 to 4.8. Project is scheduled to be completed Fall of 2023.
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
📍 Wenatchee River Ranger District 🏷 Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/05/2022
Decision 01/1970 (Estimated)
Implementation 08/2023 (Estimated)
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Lower Lake Cle Elum Fuel Break Project
Establish linear fuel breaks around lower Lake Cle Elum to reduce the risk of uncharacteristic wildfire, incorporating existing linear features.
Learn About Wildfire Learn About Thinning
📍 Cle Elum Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Midnight Restoration
Landscape-scale wildfire risk reduction and terrestrial restoration project in Rader Creek, lower Wolf Creek, and upper Twisp River drainages. Excludes Lake Chelan-Sawtooth Wilderness.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Fuels management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Mixed Impact
Mixed Impact
Okanogan-Wenatchee National Forest
Planning and Management of Domestic Sheep and Goat Grazing within the Range of Bighorn Sheep
Proposal to amend Land and Resource Management Plans to provide forest plan direction for managing domestic sheep and goat grazing within the range of Bighorn sheep to better provide for bighorn sheep viability in the context of range management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Okanogan-Wenatchee National Forest 🏷 Grazing management · Land management planning · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
South Fork Tieton Prescribed Fire Project
Wildfire Crisis Strategy Project
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Naches Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Methow
Landscape-scale wildfire risk reduction and terrestrial restoration project in Goat Creek, Cub Creek and Lost River drainages using emergency authorities.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Methow Valley Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Okanogan-Wenatchee National Forest
Upper Swauk Restoration Project
Fuels & Forest Health EAD Project. Proposing forest restoration activities including commercial and non-commercial thinning, prescribed fire, fuels breaks, aquatic restoration activities, and transportation system changes.
Learn About Wildfire Learn About Thinning
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
📍 Cle Elum Ranger District 🏷 Forest products · Fuels management · Road management · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
Acres 36,567
MilestoneDate
NEPA Start Date 10/10/2023
Finding/Decision Date
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
Wenatchee Mountain Alpine Huts Special Use Permit
Issue 2-year transitional priority use special use authorization for seasonal (winter) lodging facilities and outfitter guiding at DeRoux Campground, North Fork Teanaway River.
📍 Cle Elum Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Okanogan-Wenatchee National Forest
White Pass Ski Area - Chairlift 4 Replacement Project
White Pass proposes to replace the existing double chairlift with a new quad chairlift. The new lift would be installed in the same alignment as the current lift, with the same bottom and top terminal locations.
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Naches Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/08/2025
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Mixed Impact
Mixed Impact
Gifford Pinchot National Forest
2020 Flood Damage ERFO Repairs
Project proposes to repair nine road segments damaged during the February 2020 flood event. Actions include removing landslide debris, repairing/cleaning culverts and ditches, embankment and slope reinforcement.
📍 Cowlitz Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Forest Wide Thinning & Potential Control Line Treatments
The proposed action would include 2 primary elements: plantation thinning of previously regenerated stands under 80 years of age, and small diameter hand thinning within 500 feet of roadsides identified by fire management staff as PCLs for use in future wildfire management.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Gifford Pinchot National Forest
King Underburn
Project proposes to underburn 227 acres to reduce residual fuel loading post-harvest and improve vegetation condition on the National Forest boundary northeast of Trout Lake. Prescribed burn is planned for Spring 2026. Project documents: https://usfs-public.box.com/s/41gwea7tnzmw9evnjloxwjwa4g6glsqp
Learn About Wildfire Learn About Thinning
Acres 227
📍 Mt. Adams Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres 227
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Little White Salmon Forest Resiliency and Fire Risk Mitigation Project
Increase forest resiliency to climate-related stressors and mitigate fire risk to highly valued resources in the Little White Salmon Watershed. Proposed actions will include commercial timber harvest, fuels treatments and other restoration projects.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Adams South Climb / Cold Springs Trailhead Improvements
Trailhead improvements necessary to ensure quality visitor experiences, improved sanitation and safety, and resource protection and restoration in the vicinity of the Mt. Adams South Climb (#183) and Cold Springs (#72) trailheads.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Adams Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Mount Margaret Backcountry Toilet Replacement
Project proposes to replace aging toilet facilities at 8 backcountry campsites in the Mount Margaret Backcountry Area within Mount St. Helens National Volcanic Monument.
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
📍 Mount St. Helens National Volcanic Monument 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 9/25/2025
Finding/Decision Date 5/26/2026
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Review of Wind River Consent to Geothermal Lease Request
The Gifford Pinchot National Forest is responding to two requests provided by Bureau of Land Management to evaluate consent to lease two nominated parcels of Forest Service lands for geothermal exploration and development.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Gifford Pinchot National Forest
Siouxon, Sunset & Kalama Fire Reforestation
Project proposes to replant 134 acres of forest impacted by the 2022 fire season in response to direction in the 2021 REPLANT Act.
Learn About Wildfire Learn About Thinning
Acres of Forest Impacted By The 2022 Fire Season In Response 134
📍 Gifford Pinchot National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of Forest Impacted By The 2022 Fire Season In Response 134
Uncategorized
Uncategorized
Gifford Pinchot National Forest
Spirit Lake Outflow Safety Improvement Project
The Project proposes to evaluate options to improve safety of the outflow at Spirit Lake located within the Mount St. Helens National Volcanic Monument. A draft Record of Decision and corresponding documents will be published on July 7, 2026 opening up Objections for the Project.
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
📍 Gifford Pinchot National Forest 🏷 Regulations, directives, orders Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 9/30/2024
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
49 Degrees North Mountain Resort Enhancement
New bike park and alpine roller coaster for summer use. Expansion of snowmaking to include additional terrain and reservoirs. Modification of 4 ski trails to improve access. Construction of Saddle Lodge and restrooms.
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
📍 Newport Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Boulder Park Ecological Resotration Project
placeholder
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 4/12/2018
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Bulldog supplemental
Placeholder
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Burnt Taco Salvage
Approximately 200 acres of fire salvage within the Little Tacoma Creek Stewardship Sale area. To view the FANEC, please visit the public Pinyon site: https://usfs-public.app.box.com/v/PinyonPublic/folder/362928529671
Learn About Thinning
Acres of Salvage 200
📍 Newport Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of Salvage 200
Uncategorized
Uncategorized
Colville National Forest
Chewelah A-Z
Placeholder
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/27/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Ferry Lake Campground Hazard Tree Removal
Removal of Hazard Trees from the Ferry Lake Campground to provide for public safety.
Learn About Wildfire Learn About Thinning
📍 Colville National Forest All Units 🏷 Fuels management · Recreation management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Colville National Forest
Harvey Creek Subwatershed Restoration
placeholder
Learn About Thinning
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/15/2017
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Katy Creek Salvage
Dead and dying fire-damaged trees between 7 in and 21 in dbh will be salvaged on approximately 137 acres from within the fire perimeter. Approximately 270 trees over 21 in dbh have been identified as safety concerns and/or hazard trees to be removed.
Learn About Thinning
Acres (approx.) 137
📍 Three Rivers Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres (approx.) 137
Significant Effect
Significant Effect
Colville National Forest
Leclerc Creek Grazing Allotment Management Planning
Analyze the options for management of grazing in the LeClerc Creek drainage.
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
📍 Sullivan Lake Ranger District 🏷 Grazing management Added: 2026-05-28
Cancelled
MilestoneDate
NOI in Federal Register 04/22/2013
DEIS NOA in Federal Register 07/13/2015
FEIS NOA in Federal Register 08/2018 (Estimated)
Objection Period Start 08/2018 (Estimated)
Decision 11/2018 (Estimated)
Implementation 11/2018 (Estimated)
Uncategorized
Uncategorized
Colville National Forest
Meadow Lakes
Placeholder
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
📍 Three Rivers Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/25/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Meadow Maintenance
Maintain Meadows by removing encroaching conifers and maintaining infrastructure (e.g. exclosures, boulders).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
📍 Newport Ranger District 🏷 Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/2/2020
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Quartz
Up to 2,900 acres of forest health treatments, about 4 miles of hand and machine fireline to support prescribed fire underburning, about 3 miles of temporary road access to treatment units, reconstruction of about 5 miles of existing non-system road templates (all 8 miles would be decommissioned).
Learn About Wildfire Learn About Thinning
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres Treated 2,900
MilestoneDate
NEPA Start Date 3/15/2024
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Sherman Highway Aquatic Restoration
Project includes culvert replacements, installing aquatic organism passages, bridge work, and historic streambed reconstruction. Activities will occur on/along State Highway 20 between Kettle Falls and Republic, WA.
MilestoneDate
Scoping Start 09/28/2020
Decision 10/2025 (Estimated)
Implementation 06/2026 (Estimated)
📍 Three Rivers Ranger District 🏷 Wildlife, fish, rare plants · Watershed management · Road management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 09/28/2020
Decision 10/2025 (Estimated)
Implementation 06/2026 (Estimated)
Uncategorized
Uncategorized
Colville National Forest
Slate
Improve forest health and resilience to disturbance through 13,000 acres of forest thinning, and improve aquatic and wildlife habitat with over 6 miles of instream restoration projects.
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
Acres of Forest Thinning 13,000
MilestoneDate
NEPA Start Date 8/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Colville National Forest
Sweet-Ione Integrated Resources Improvement Project
Create a range of forest structural stages that supports resilience and is compatible with characteristic disturbance processes (wildland fire, insects and diseases), and supports aquatic and terrestrial habitat conditions and associated species.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
📍 Newport Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Road management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/30/2019
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Sxwuytn-Kaniksu Connections (Trail) Project
This is a multi-faceted project focusing on restoring healthy forests, connecting lands and people, improving watershed function, and providing economic stability.
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 1/23/2020
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Tacoma Creek Salvage
Salvage trees within previously identified units of the Swamp Creek sale area that burned in the Tacoma Creek Fire.
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/30/2025
Finding/Decision Date
Mixed Impact
Mixed Impact
Colville National Forest
Tonata Trout
A project to conduct vegetation and fuels management, meadow restoration, aquatic restoration, and other work in the Tonata Trout project area.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
📍 Republic Ranger District 🏷 Fuels management · Recreation management · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 11/14/2023
Finding/Decision Date
Uncategorized
Uncategorized
Colville National Forest
Upper West Branch LeClerc Creek fish Management Structure
Installation of a fish management structure on Upper West Branch LeClerc Creek for the purpose of non-native trout eradication by WDFW and Kalispel Tribe
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
📍 Newport Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 1/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
25 Road Fuel Break
. The project would establish and maintain fuel breaks along the 25 Road that tie together recent Upper Briggs project (signed in 2019) area treatments to the old Taylor-Klondike Fire control lines and Rum Creek Fire contingency lines
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 01/10/2023
Decision 11/2023 (Estimated)
Implementation 03/2024 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/10/2023
Decision 11/2023 (Estimated)
Implementation 03/2024 (Estimated)
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
AT&T Cell Tower Replacement
Crown Castle (Agent for AT&T) is proposing to replace 80 foot existing self-support tower with a 150 foot self-support tower to provide elevation and space for equipment for 4 wireless communication providers and other users requesting collocation.
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/09/2020
Decision 02/2020 (Estimated)
Implementation 02/2020 (Estimated)
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
Dutchman Radio Building
Installation of a freestanding radio building to store radio equipment. Repair/replacement of Radio tower that was damaged during storms during the winter. Move and install ODF solar panels South of the Dutchman Lookout living quarters.
MilestoneDate
Scoping Start 06/20/2023
Decision 02/2027 (Estimated)
Implementation 06/2027 (Estimated)
📍 Rogue River-Siskiyou National Forest All Units 🏷 Facility management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 06/20/2023
Decision 02/2027 (Estimated)
Implementation 06/2027 (Estimated)
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Moon Fire Recovery
The project will fell and remove hazard trees and reduce fuel loading in critical linear fuel management zones, perform site preparation for reforestation and plant site appropriate conifer seedlings.
Learn About Wildfire Learn About Thinning
📍 Gold Beach Ranger District 🏷 Forest products · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Mt. Ashland Ski Lift Replacement
To replace two lifts Areil and Windsor,which are aging lifts that are no longer repairable. Replacing the two lifts will increase safety and reliability, increase operational efficiency and inprove winter-sport infrastructure.
Learn About Wildfire Learn About Thinning
📍 Rogue River-Siskiyou National Forest All Units 🏷 Recreation management · Vegetation management (other than forest products) · Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Rogue River-Siskiyou National Forest
North Fork Diamond Bridge Replacement
Replacement of the North Fork Bridge that was burned in the Smith River complex fire.
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
📍 Wild Rivers Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Snowy Butte Landscape Restoration Project
The District is proposing a vegetation and watershed restoration project in collaboration with the Medford Watershed Commission to support fire resiliency and forest health in spring-fed water supply of the Big Butte Springs Municipal Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
📍 High Cascades Ranger District 🏷 Forest products · Fuels management · Grazing management · Heritage resource management · Recreation management · Special area management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 5/5/2022
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Thompson Creek Fuel Break
Treatments will reduce fuels and protect large residual trees by manually cutting brush and select live trees eight-inch DBH and under, ten-inch DBH and under of dead trees, hand piling, and pile burning within the project footprint.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/3/2023
Finding/Decision Date
Significant Effect
Significant Effect
Rogue River-Siskiyou National Forest
Yellowjacket
The Yellowjacket Project aims to reduce hazardous fuels, and foster a more fire, insect, and disease resilient forest. This project will help to protect vulnerable communities from catastrophic wildfires by tying into past treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Siskiyou Mountains Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman, Malheur
Austin
This project includes a suite of activities to restore forest and watershed resiliency, including: fuels treatments and prescribed burning; and upland and watershed restoration.
Learn About Wildfire Learn About Thinning
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
📍 Blue Mountain Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 05/15/2025
DEIS NOA in Federal Register 02/02/2026
FEIS NOA in Federal Register 08/2026 (Estimated)
Decision 04/2027 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Baker City Watershed Fuels Management Project
The purpose of this project is to reduce hazardous fuels between the Baker City Watershed and nearby private land.
Learn About Wildfire Learn About Thinning
📍 Whitman Ranger District 🏷 Forest products · Fuels management · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Buckhorn Radio Shelter and Tower Replacement
A radio communication tower and associated radio shelter need to be replaced due to their poor conditions.
📍 Wallowa-Whitman National Forest All Units 🏷 Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Bull Run Restoration Geotechnical Analysis CE
Bull Run Meadows Restoration Project geotechnical analysis of current subsurface substrates in mine waste piles. Excavation of a trench 8-10 feet deep, 3 feet wide and 12 feet long. Total disturbance will be less than 1/10th acre.
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Wallowa-Whitman National Forest All Units 🏷 Wildlife, fish, rare plants · Minerals and geology Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/06/2024
Decision 10/2024 (Estimated)
Implementation 10/2024 (Estimated)
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Deer Creek Trail Bridge
The North Phillips Lake Trail #1608 parallels State Hwy 7 at Deer Creek Bridge. Currently there is no hiker/bike bridge there. The area is near a state right-of-way. dev of a new foot/bike bridge over Deer Creek will eliminate a hazard
MilestoneDate
Scoping Start 03/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 10/2023 (Estimated)
📍 Whitman Ranger District 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 03/2023 (Estimated)
Decision 09/2023 (Estimated)
Implementation 10/2023 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry DFPZ
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/23/2024
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Huckleberry Defensible Fuels Profile Zone
A Defensible Fuel Profile Zone (DFPZ) project to reduce the fuel loading in strategic areas that would help in the aid in fire suppression on FS along private boundaries, ridgelines and or road corridors.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/23/2024
Finding/Decision Date
Mixed Impact
Mixed Impact
Wallowa-Whitman National Forest
Meadow Creek Watershed Restoration
Hazardous fuel reduction, watershed restoration, and research
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Morgan Nesbit Forest Resiliency Project
The purpose of the Project is to conduct restoration management activities to improve forest resiliency and sustainability and improve hydrologic functioning, thereby moving the landscape toward the goals, objectives, and desired future condition(s).
Learn About Wildfire Learn About Thinning
📍 Wallowa Valley Ranger District 🏷 Forest products · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Mt. Emily OPB Permit Renewal
Renewal of an existing Special Use Permit
📍 La Grande Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
ODOT Summit Point Communication Site, SUP PIN201802
Renewal of communication tower lease.
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Whitman Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 02/18/2019
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
PacifiCorp Mt. Emily SUP
Permit renewal for PacifiCorp's existing Mt. Emily site.
📍 La Grande Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Powder River Mining
Analyze proposed mining plans of operations within the Powder River watersheds.
📍 Whitman Ranger District 🏷 Minerals and geology Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Race Cow Project
Improve forest resilience, reduce hazardous fuels, enhance native grasslands, improve road access, develop two rock pits, reduce sediment delivery, provide timber products. Requesting EAD under IIJA, comment period per IIJA offered if granted.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Salmon River Ranger District 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2027 (Estimated)
Implementation 06/2028 (Estimated)
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Red Cougar Integrated Vegetation Management
Hazardous fuels reduction using prescribed burning, commercial and noncommercial thinning.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 WHITMAN RANGER DISTRICT 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
Sufferin' Springs Vegetation Management Project
Hazardous fuels reduction within stands at high risk for insect and disease out break as well as a high risk fireshed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date
📍 La Grande Ranger District 🏷 Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/10/2025
Finding/Decision Date
Uncategorized
Uncategorized
Wallowa-Whitman National Forest
Upper Breshears Trailhead Relocation
Relocate the Breshears trailhead to an existing rock pit with better access to improve safety and an anticipated increase in use.
📍 Wallowa-Whitman National Forest All Units 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Wallowa-Whitman National Forest
West Wall Defensible Fuels Profile Zone
Establish and maintain fuel breaks to reduce the risk of uncharacteristic wildfire within the Carson/Pine Valley Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
📍 Whitman Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
2025 Cougar Peak Reforestation and Fuel Break Project
Site preparation and planting of native trees on approximately 17,000 acres in the Cougar Peak Fire footprint. Creating and maintaining linear fuel breaks by reducing vegetation and down woody debris adjacent to roads in the project area.
Learn About Wildfire Learn About Thinning
Acres (approx.) 17,000
📍 Fremont-Winema National Forest All Units 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 17,000
Mixed Impact
Mixed Impact
Fremont-Winema National Forest
BPA-Lapine-Chiloquin Priority Pole Project
BPA has identified roads that require maintenance to ensure safe access to the LAPI-CHIL-1 transmission facilities. The road maintenance will allow BPA to also perform wood pole replacements that need to be completed along the transmission line.
MilestoneDate
Scoping Start 01/24/2023
Decision 06/2024 (Estimated)
Implementation 08/2024 (Estimated)
📍 Chemult Ranger District 🏷 Special use management · Road management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/24/2023
Decision 06/2024 (Estimated)
Implementation 08/2024 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Bly Mountain Insect and Disease Restoration Project (Bly Mountain Phase One)
The Chiloquin Ranger District aims to improve resource conditions and increase forest resilience to insect and disease infestation in a portion of the Bly Mountain planning area.
Learn About Wildfire Learn About Thinning
📍 Chiloquin Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Buck/Indian North Boundary Fence
There is a need to re-establish the northern boundary of the Buck/Indian cattle allotment to allow better management of the northern section of the allotment.
MilestoneDate
Scoping Start 01/23/2025
Decision 04/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Klamath Ranger District 🏷 Grazing management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/23/2025
Decision 04/2026 (Estimated)
Implementation 07/2026 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Buffalo Meadow Warming Shelter Project
This project proposes to install a pre-engineered shelter on the edge of a large meadow, known locally as Buffalo Meadow.
MilestoneDate
Scoping Start 01/18/2022
Decision 08/2026 (Estimated)
Implementation 11/2026 (Estimated)
📍 Klamath Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 01/18/2022
Decision 08/2026 (Estimated)
Implementation 11/2026 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Chiloquin Sewer project
This project will connect the Chiloquin Ranger District to the town of Chiloquin's sewer line
MilestoneDate
Scoping Start 03/20/2015
Decision 01/1970 (Estimated)
Implementation 06/2015 (Estimated)
📍 Chiloquin Ranger District 🏷 Facility management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 03/20/2015
Decision 01/1970 (Estimated)
Implementation 06/2015 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Clover Creek Fuel Break RAC
There is a need to improve the network of wildfire control and suppression features in a high-risk region by creating 12-miles of shaded fuel breaks along Clover Creek Road on Green Diamond Resource Company lands.
Learn About Wildfire Learn About Thinning
📍 Klamath Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Fremont-Winema National Forest
Dog Lake 303 Road Decommissioning
Due to poor road conditions, hydrological issues, unstable soils, presence of danger trees, and repeated maintenance by the Forest Service from locks and gates being removed by the public, there is a need to decommission the 303 road.
📍 Lakeview Ranger District 🏷 Road management · Wildlife, fish, rare plants Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Dry Prairie Spring Excavation
The Forest Service proposes to allow the permittee of the Yainax Butte Allotment to excavate the identified springs to find water and develop a water system off the spring to provide water to the cattle on the south end of the Dry Prairie pasture.
MilestoneDate
Scoping Start 02/02/2021
Decision 04/2021 (Estimated)
Implementation 04/2021 (Estimated)
📍 Bly Ranger District 🏷 Grazing management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 02/02/2021
Decision 04/2021 (Estimated)
Implementation 04/2021 (Estimated)
Uncategorized
Uncategorized
Fremont-Winema National Forest
Klamath County-Summers Quarry Operations
There is a need for Klamath County to utilize the existing rock pit, Summers Quarry, for future road maintenance and construction projects. Klamath County would like to reauthorize a new permit for aggregate production and stockpiling of materials.
📍 Chiloquin Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Klamath Landscape Resiliency: Rocky Point WUI
The proposed action includes treatments on approximately 4,260 acres including vegetation restoration and resilience treatments, fuel breaks, road maintenance, and recreation enhancement activities.
Learn About Wildfire Learn About Thinning
Acres (approx.) 4,260
📍 Klamath Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 4,260
Uncategorized
Uncategorized
Fremont-Winema National Forest
Lake of the Woods Resort Expansion Project
I am proposing several actions at Lake of the Woods Resort including road and transportation improvements, dock renovation at the Resort Marina, installation of park model cabins, septic system upgrades, and remodeling of the Marina building.
📍 Klamath Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Fremont-Winema National Forest
Midstate Electric - Master Permit
Midstate Electric currently has seven separate permits and we are working on combining all seven into one authorization. This Master Permit will also be used to create an Operating Plan to be in compliance with the new FSH 2709.11 Ch. 80.
📍 Chemult Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Fremont-Winema National Forest
Mt. McLoughlin Trailhead Relocation Project
There is a need to relocate the Mt. Mcloughlin Trailhead and parking area to avoid initial and long-term maintenance costs associated with constructing a new bridge across the Cascade Canal.
MilestoneDate
Scoping Start 11/2024 (Estimated)
Comment Period 02/2025 (Estimated)
Objection Period Start 05/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 06/2026 (Estimated)
📍 Klamath Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 11/2024 (Estimated)
Comment Period 02/2025 (Estimated)
Objection Period Start 05/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Paddock Butte Prescribed Fire
Working together, Federal, State and Private land managers have the opportunity to reintroduce fire on an interagency landscape in the Paddock Butte area.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 10/30/2024
Decision 01/2025 (Estimated)
Implementation 04/2025 (Estimated)
📍 Bly Ranger District 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 10/30/2024
Decision 01/2025 (Estimated)
Implementation 04/2025 (Estimated)
Significant Effect
Significant Effect
Fremont-Winema National Forest
Paradise Restoration Project
The primary purpose of the Paradise Restoration Project is ecosystem restoration. Action is needed to restore healthy forest ecosystems, improve wildlife habitats, and protect life, property, and infrastructure within and adjacent to the project area.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Bly Ranger District 🏷 Forest products · Fuels management · Land management planning · Vegetation management (other than forest products) · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Fremont-Winema National Forest
Post-fire Competing Vegetation Management
The Forest Service is proposing to implement herbicide treatments for forest re-establishment and trail maintenance to reduce competing vegetation on approximately 43,000 acres of Forest System Lands that have been impacted by recent wildfires.
Learn About Wildfire Learn About Thinning
Acres 426,500
Acres 91,710
Acres 62,160
Acres 51,380
Acres (approx.) 43,000
Acres 8,946
MilestoneDate
NEPA Start Date 2/4/2026
Finding/Decision Date
📍 Fremont-Winema National Forest 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres 426,500
Acres 91,710
Acres 62,160
Acres 51,380
Acres (approx.) 43,000
Acres 8,946
MilestoneDate
NEPA Start Date 2/4/2026
Finding/Decision Date
Uncategorized
Uncategorized
Fremont-Winema National Forest
Seed Orchard Cone Stimulation Project
There is a need to inoculate three seed orchards in late July/August to stimulate cone production. Available seed is an obstacle reforestation needs. Research has shown that this treatment may increase the production of cones.
📍 Klamath Ranger District 🏷 Research Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Fremont-Winema National Forest
Stams Restoration Project
The Silver Lake Ranger District is proposing the Stams Restoration Project to implement project activities to improve forest resiliency and sustainability, maintain and enhance habitat diversity, and reduce wildfire risk on approximately 2790 acres within the project area.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2790
📍 Silver Lake Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres (approx.) 2790
Significant Effect
Significant Effect
Fremont-Winema National Forest
Switchback Restoration Project (Bly Mountain Phase Two)
The Chiloquin Ranger District aims to improve resource conditions and increase forest resilience to insect and disease infestation in a portion of the Bly Mountain planning area.
Learn About Wildfire Learn About Thinning
📍 Chiloquin Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
2025 Crescent Lake Recreation Residence Small Projects Fall
Authorization was requested from 2 recreation residence owners on Crescent Lake to complete two projects. Project one is the installation of a new septic system. Project two is the removal of a cabin damaged beyond repair due to a fallen tree.
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
2025 Crescent and Odell Lake Recreation Residence Small Projects Batch 1
Authorization was requested from 5 recreation residence owners on Crescent Lake, 4 owners on Odell Lake, and from the Shelter Cove Resort to complete minor upgrades or replacements such as deck or stair replacements and roof repairs.
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/15/2025
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
Bend to Lava Lands Paved Path
Construct a non-motorized paved path that would provide connections to recreation sites south of Bend, OR. The entire length of the path would be from Baker Road to Lava Lands Visitor Center.
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/3/2022
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Black Butte Ranch Wildland Urban Interface Fuels Reduction
The BBR WUI project proposes to maintain and restore resiliency and forest health and to address the potential risk of large-scale high severity wildfires. Proposed actions include thinning, mowing and prescribed burning on up to 2,800 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2,800
📍 Sisters Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 2,800
Significant Effect
Significant Effect
Deschutes National Forest
Boundary Road Fuels Reduction Project
Fuels reduction project to reduce wildfire risk to local communities in La Pine, OR and to enhance forest resilience to insect and disease. The project area is in the Wildland Urban Interface and in a high-risk fireshed adjacent to neighborhoods.
Learn About Wildfire Learn About Thinning
📍 Bend/Fort Rock Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
City of Bend Outback Site Conveyance
The purpose of this EA is to respond to the application submitted by the City under the Townsite Act. The proposed action would allow for 48 acres to be conveyed to the City at fair market value and would be used to expand its potable water infrastructure.
Acres 48
📍 Deschutes National Forest 🏷 Land ownership management Added: 2026-05-28
Completed
Acres 48
Uncategorized
Uncategorized
Deschutes National Forest
Class 1, Pedal-assist E-bikes on Select Trails
This project is considering the use of class 1 e-bikes on select trails with the designed use of bicycle. The proposed action includes 67 trails, totaling 161.4 miles as open to class 1 e-bikes.
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
📍 Deschutes National Forest 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 7/2/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Cougar Rock Restoration Project
The project proposes to maintain and restore resiliency and forest health and to address the potential risk of large-scale high severity wildfires. Proposed actions include thinning, mowing and prescribed burning on up to 2,800 acres.
Learn About Wildfire Learn About Thinning
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
📍 Sisters Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 2,800
MilestoneDate
NEPA Start Date 12/16/2022
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Crate Vegetation Management Project and Site-Specific Forest Plan Amendment
Vegetation management on approximately 18,168 acres to move forest conditions toward historic range of variability and improve forest resilience to disturbance to reduce the likelihood of uncharacteristic large-scale loss of forest habitat.
Learn About Thinning
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
Acres (approx.) 18,168
MilestoneDate
NEPA Start Date 4/21/2026
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Deschutes Fuels Maintenance Project
Proposed fuels maintenance actions including non-fire and prescribed fire treatments on previously treated units on the east side of the forest.
Learn About Wildfire Learn About Thinning
📍 Deschutes National Forest 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Deschutes National Forest
Flat Top Fire Site Preparation and Reforestation Project
This project proposes site preparation cutting and reforestation on approximately 9,530 acres that experienced a high basal area loss of vegetation as a result of the Flat Top Fire in 2024.
Learn About Wildfire Learn About Thinning
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Deschutes National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
Acres (approx.) 9,530
MilestoneDate
Scoping Start 11/24/2025
Comment Period 12/08/2025
Decision 01/2026 (Estimated)
Implementation 03/2026 (Estimated)
Significant Effect
Significant Effect
Deschutes National Forest
Green Ridge Landscape Restoration
The project would maintain and restore forest conditions closer to the historic range of variability and contribute to the restoration of ecosystem process and function in the planning area. Timber products are an outcome of restoration activities.
Learn About Wildfire Learn About Thinning
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
📍 Sisters Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 25,000
MilestoneDate
NEPA Start Date 9/1/2017
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
MEC Walker Mountain Tower Replacement
MEC is proposing to replace their existing communications tower and expand their control building at Walker Mountain Communication Site. Proposal includes moving the tower's location to improve line-of-sight with nearby microwave devices.
MilestoneDate
Scoping Start 06/04/2024
Decision 09/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Crescent Ranger District 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 06/04/2024
Decision 09/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Deschutes National Forest
MODA Active Management Project
The MODA Active Management Project proposes dry forest restoration techniques in order to improve and maintain the forested ecosystem of of the Moore Creek and Davis Creek Subwatersheds on the Crescent Ranger District.
Learn About Wildfire Learn About Thinning
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
📍 Crescent Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres 14,723
MilestoneDate
NEPA Start Date 3/2/2026
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
Managed Stands Eastside Project
This project proposes vegetation management actions on 14,830 acres within previously managed stands on the eastside of the Crescent Ranger District.
Learn About Wildfire Learn About Thinning
Acres 14,830
📍 Crescent Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres 14,830
Uncategorized
Uncategorized
Deschutes National Forest
Meissner Groomer Garage Number 2
Meissner Nordic Club is proposing to build a second garage to store an additional groomer at an existing storage facility just north of the Virginia Meissner Sno-Park. The site currently has one garage and one metal storage container. The second garage will be placed in the existing site clearing.
📍 Bend/Fort Rock Ranger District 🏷 Facility management · Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Northwest Lift Improvements
Mt. Bachelor proposes to modernize the existing Northwest Express lift by replacing the lift's electric drive components and safety switches as well as replacing two operator shacks and increasing chair storage.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Outback Lift Bottom Terminal Power Supply Replacement
Mt. Bachelor is proposing to replace a 0.83 mile segment of power cable that supplies the bottom terminal of Outback Lift to maintain safe resort operations.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Summer 2025 Maintenance Projects
Maintenance proposals within Mt. Bachelor's special use permit area: installing new fiber optic conduit route to replace a damaged section of fiber line and connecting a power supply to the propane tank that serves Sunrise Lodge.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Mt. Bachelor Sunrise Deck Expansion, Little Pine Power Distribution, and West Village Base Area Powe
Mt. Bachelor Ski Resort is proposing to expand the existing deck at Sunrise Lodge, upgrade the power feed to Little Pine Ski Lift to combat power supply issues, and install a generator and associated transformers, junction/sector cabinets, and buried powerlines in the West Village area.
📍 Bend/Fort Rock Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Deschutes National Forest
Royce Mountain Roadside Hazardous Fuels
Intent is to reduce the risk of uncharacteristic wildfire on Federal land or catastrophic wildfire for an adjacent, at-risk community by reducing fuel loading, ladder fuels, and raising canopy base heights.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/26/2024
Decision 03/2025 (Estimated)
Implementation 04/2025 (Estimated)
📍 Crescent Ranger District 🏷 Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/26/2024
Decision 03/2025 (Estimated)
Implementation 04/2025 (Estimated)
Uncategorized
Uncategorized
Deschutes National Forest
Sisters RD Recreation Shuttle Services
The Forest Service is proposing to approve special use permits for two local businesses, Stagecoach Adventures and Cog Wild. The two companies would provide shuttle services to and from several trailheads within the Sisters Ranger District.
📍 Sisters Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Deschutes National Forest
Sisters Trail Additions and Realignments (STAR)
The STAR project proposes several trail actions including new trail construction, additions of existing routes to the official Forest Service trail system, as well as realignments and decommissioning of existing trails on the Sisters Ranger District.
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
📍 Sisters Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 7/23/2023
Finding/Decision Date
Mixed Impact
Mixed Impact
Deschutes National Forest
Upper Black Butte Swamp Restoration
Upper Black Butte Swamp is a 34-acre wetland that has incised channels and drying out vegetation. The project would restore the fen through channel filling, planting native vegetation, aspen restoration and invasive weed management.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
📍 Sisters Ranger District 🏷 Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 6/17/2025
Finding/Decision Date
Uncategorized
Uncategorized
Deschutes National Forest
West Bend Trails Project
Trail modifications, such as reroutes, new trails, decommissioning to create a more sustainable trail network while minimizing resource impacts.
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/29/2024
Finding/Decision Date
Significant Effect
Significant Effect
Deschutes National Forest
West Bend Vegetation Management Project
Moving the area toward a more resilient landscape, providing a diversity of habitats, & reducing hazardous fuels. Approximately 14,750 acres of commercial thinning, for a total of 22,000 acres proposed for thinning, mowing, and/or underburning.
Learn About Wildfire Learn About Thinning
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
📍 Bend/Fort Rock Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Thinning, Mowing, And/Or Underburning 22,000
Acres of Commercial Thinning 14,750
MilestoneDate
NEPA Start Date 11/24/2010
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
Basin Thinning Project
The purpose of this project is to restore forest health and resiliency on 110 acres of selected plantations.
Learn About Wildfire Learn About Thinning
Acres of Selected Plantations 110
📍 Zigzag Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of Selected Plantations 110
Uncategorized
Uncategorized
Mt. Hood National Forest
Big Eddy-Ostrander Conductor Replacement Project
For more information the Big Eddy-Ostrander Conductor Replacement Project, visit the BPA project website https://www.bpa.gov/learn-and-participate/public-involvement-decisions/project-reviews/big-eddy-ostrander-project
📍 Mt. Hood National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Cascade Utilities Reflector Decommissioning
A communication reflector, owned by Cascade Utilities, is no longer is use and needs to be removed from National Forest System lands. The microwave dish is 20 feet by 24 feet in size and weighs 9,170 pounds. Once removed, the site would be restored.
📍 Clackamas River Ranger District 🏷 Special use management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Cloud Cap Inn Water System Renovation
The proposed action is reconstruction of the existing spring box, redevelopment of the existing spring, and installation of a new distribution main from the spring box to the Cloud Cap Saddle Campground, Cloud Cap Inn and Snowshoe Cabin.
📍 Hood River Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Consent for Geothermal Leasing
The Bureau of Land Management (BLM) received nominations of National Forest System lands to be considered for a future, competitive geothermal lease sale. The Forest Service is considering whether to consent to the BLM to lease these lands.
📍 Clackamas River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Hootnanny Insect and Disease
The primary purposes of this project are to reduce the risk of landscape level disturbance and increase forest resiliency to insect and disease.
Learn About Wildfire Learn About Thinning
📍 Barlow Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Anvil Vegetation Management Project
This project seeks to improve forest health and diversity in plantations. In addition, this project seeks to reduce excessive fuel loading primarily along forest roads. Approximately 4,000 acres may be proposed for vegetation and fuels treatments.
Learn About Wildfire Learn About Thinning
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
📍 Clackamas River Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres (approx.) 4,000
MilestoneDate
NEPA Start Date 2/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Cascade Utilities Fiber Optic at Ripplebrook
Install fiber communication cable along existing roads, to provide high speed internet to the Ripplebrook administrative site.
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Clear Branch Dam Remediation
There is a need to remediate Clear Branch Dam to meet current dam safety and environmental compliance standards in order to continue to provide a clean dependable water supply for the Upper Hood River valley. More information at: clearbranchdam.com.
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 6/18/2025
Finding/Decision Date
Significant Effect
Significant Effect
Mt. Hood National Forest
MTH Lost Lake Late Successional Reserve Acre Swap
There is a need to amend the Forest Plan to remove the high use recreational area of Lost Lake Resort, Campground and Day Use Area from Late-successional Reserve (LSR), and reallocate more appropriate areas as LSR.
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 8/20/2025
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
MTH Timberline Chairlifts and Improvements
To improve connectivity between Summit Pass and Timberline Lodge, enhance skiing experience, and improve communications, the following is proposed: replacement of Summit Pass chairlift and new chairlift construction, ski terrain improvements, and fiber optic cable installation.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Mt. Hood National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Mt. Hood National Forest
Portland General Electric (PGE) Undergrounding Summit 13 Distribution Powerline
As part of PGE's Wildfire Mitigation Plan, there is a need to minimize wildland fire risk associated with utilities in the National Forest. Therefore, this project would underground approximately 5 miles of existing powerline.
📍 Zigzag Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Mt. Hood National Forest
Routine Repair and Maintenance of Existing Utilities in Ski Areas
Ski areas have ongoing repair and maintenance needs to meet Forest Service standards. This project allows for ski areas to better maintain existing utilities within permitted areas.
📍 Mt. Hood National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Stone Creek Vegetation Management Project
The project seeks to improve forest health and diversity on approximately 3,225 acres within the Oak Grove Fork Clackamas River watershed.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,225
📍 Clackamas River Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Completed
Acres (approx.) 3,225
Uncategorized
Uncategorized
Mt. Hood National Forest
Timberline Mountain Bike Connector Trails
There is a need to move advanced riders away from beginner riders more efficiently by adding short trail connectors from the Gravy Train Trail and upper Brobi Wan Trail. Also, a 245-foot trail alignment would be added to The Rock Trail.
📍 Zigzag Ranger District 🏷 Recreation management · Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Mt. Hood National Forest
Wapinitia Fuels Reduction
The purpose of this project is to improve forest conditions by reducing accumulated fuels on approximately 100 acres west of the Wapinitia subdivision. Work includes non-commercial hand-cutting trees 6-8 inches DBH. Access will use existing roads.
Learn About Wildfire Learn About Thinning
Acres (approx.) 100
📍 Zigzag Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Acres (approx.) 100
Mixed Impact
Mixed Impact
Ochoco National Forest
3 Fires Reforestation Initiative
The Forest experienced 3 very large wildfires in 2024 which require reforestation though planting native fire-adapted tree species where regeneration is unlikely. Plantings would generally take place in areas that had greater than 75% mortality.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Central Electric Cooperative Grizzly Powerline Relocation
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 05/02/2025
Decision 05/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Central Grassland Fuels Reduction Project
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Ochoco National Forest
Day Wireless Gray Butte Tower Addition Special Use Permit
Day Management Corporation submitted an application to install a 60' support tower, foundation and ice bridge on the existing site. This would allow for transmitting and receiving wireless communication signals. ACCESS DOCUMENTS: https://usfs-public.box.com/s/p6wjo60fl9mal90ej8oo9tmtph0y3uaw
📍 Crooked River National Grassland 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Ochoco National Forest
Jordan Road Stockpile Expansion and Reissuance of Special Uses Permit
Reissue special uses permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Ochoco National Forest 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 4
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Ochoco National Forest
North Fork Crooked River Forest Resilience Project
The main project purpose is to improve forest resilience to disturbance events, like insect and disease outbreaks and wildfire, and to promote adaptation to drought conditions by reducing tree density and fuels loading.
Learn About Wildfire Learn About Thinning
📍 Paulina Ranger District 🏷 Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Ochoco National Forest
North Slope Vegetation Management Project
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/5/2026
Finding/Decision Date
Uncategorized
Uncategorized
Ochoco National Forest
Salmon Fly Interconnect
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Crooked River Natl Grassland 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 07/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Significant Effect
Significant Effect
Ochoco National Forest
Upper Trout and Bridge Creeks Vegetation Management Project
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
📍 Ochoco National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 3/4/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Ochoco National Forest
Wiley Flat Roadside Hazard Tree Abatement
The Lookout Mountain Ranger District will reduce roadside hazards along approximately 21.7 miles open roads within the Wiley Flat wildfire area through commercial salvage. After further analysis, 2.6 more miles of roadside treatment were added.
📍 Lookout Mountain Ranger District 🏷 Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
54 North Fuels Reduction and Huckleberry Restoration Project
To restore resilience in dry upland forests by protecting old trees, reducing surface fuels, reducing overall forest density, and shifting composition from intolerant to fire tolerant species. Improve habitat for huckleberry.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 North Fork John Day Ranger District 🏷 Fuels management · Heritage resource management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Blue Mountains Forest Plan Revision
Land Management Plan revision for the Malheur, Umatilla, and Wallowa-Whitman National Forests, which will provide management direction on approximately 4.9 million acres of public lands. https://www.fs.usda.gov/r06/umatilla/planning/blue-mountains-forest-plan-revision
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
📍 Umatilla National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/5/2025
Finding/Decision Date
Significant Effect
Significant Effect
Umatilla National Forest
Bone Point Planting CE
In accordance with the National Forest Management Act of 1976, this project proposes to replant trees in areas burned by the 2024 Bone Point Fire, where stocking levels have fallen below Umatilla National Forest Plan requirements.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Double Snag Planting CE
The proposed action is to plant ponderosa pine, Douglas-fir, western larch, and western white pine seedlings by hand on 107 acres of the Double Snag fire burn scar. This will be non-RHCA planting.
Learn About Wildfire Learn About Thinning
Acres of The Double Snag Fire Burn Scar 107
📍 North Fork John Day Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres of The Double Snag Fire Burn Scar 107
Significant Effect
Significant Effect
Umatilla National Forest
Ellis Integrated Vegetation Project
The Ellis Project is being developed to improve wildlife habitat, restore resiliency against insect/disease and wildfire, protect values at risk, provide timber products, and enhance public and traditional land uses.
Learn About Wildfire Learn About Thinning
📍 North Fork John Day Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
FSR 47 Chipseal
There is a need to complete repairs initiated after the 2020 flood and resurfacing the existing 8 miles of asphalt pavement to provide a smooth-running surface for the portion of NFSR 47 that accesses the Forest Service land.
📍 Umatilla National Forest All Units 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Lane Creek Drilling Survey
Proponent requesting to drill 5 holes 8" in diameter to depths of 15-50 feet to survey the location of bedrock to best determine stream channel design for culvert upgrade at Lane Creek and Highway 244.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Lone Rock Post Fire Recovery CE
Address hazardous fuel conditions and insect outbreaks caused by the 2024 Lone Rock fire by creating a fuel break and reducing excess fuel loads. Regenerate areas of forest cover where viable seed sources of desired tree species are insufficient.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Mottet Vegetation Management Project
Vegetation management project for stand structure and composition, socioeconomics by providing timber products.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/16/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Mt. Misery Snowshelter Relocation
Mt. Misery Snowshelter proposed to be moved to reduce ongoing impacts and comply with NHPA.
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
📍 Pomeroy Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/27/2026
Finding/Decision Date
Uncategorized
Uncategorized
Umatilla National Forest
Pearson Tract Lot 1A Expansion (SUP)
Increase footprint from 562 sq. ft. by adding an additional 16%u2019x16%u2019 to the back side (southwest side) of the cabin bringing the total footprint of the cabin to 818 sq. ft., well below the 1,200 sq. ft. maximum.
📍 North Fork John Day Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Umatilla National Forest
Penland Lake Water Tank
Install 2000 gallon holding tank and 425 feet of waterline attached to private well to gravity feed 3 private cabins adjacent to FS Lands.
📍 Umatilla National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Summit Road Fuels Reduction
The project would reduce fuels and improve forest health along the strategic control features of Forest Roads 31 (Summit Road) and 32 (Dry Creek).
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Umatilla National Forest
Tiger-Mill
The Tiger-Mill Project is being proposed to protect the Mill Creek Municipal Watershed and restore ecosystem processes and functions that foster landscape diversity and achieve desired vegetation conditions.
Learn About Wildfire Learn About Thinning
📍 Walla Walla Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Top Road Fuel Break (CE)
Top Road Fuelbreak Project is located in the Lower Big Wall Creek and Cupper Canyon-North Fork John Day River watersheds. The constructed fuelbreak will run along roadways and existing fire break on National Forest Service lands.
Learn About Wildfire Learn About Thinning
📍 Umatilla National Forest All Units 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Umatilla National Forest
Zulu Post Fire Rehabilitation CE
This project will regenerate forest stands in burned areas that no longer have viable seed source for desired tree species. Treatments may include removing vegetation and planting seedlings in prepared areas.
Learn About Wildfire Learn About Thinning
📍 Heppner Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
2022 ODOT rock stockpile
Expand the Santiam Pass Oregon Department of Transportation (ODOT) rock disposal site by 5 acres and build a short connecting road to the Santiam sand shed. Accomplished by blading away native soil and vegetation with standard earth moving equipment.
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 5
MilestoneDate
NEPA Start Date 4/12/2022
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
2023 Big Lake Youth Camp
McKenzie River Ranger District is proposing to authorize the operators of Big Lake Youth Camp (BLYC) to conduct several site improvements.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
2024 McKenzie River Trail Connector
McKenzie River Ranger District wants to complete construction of a short trail connection between the newly installed trail bridge at the Deer Creek to Forest Service Road 2654 in support of the McKenzie River National Recreation Trail #3507.
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/27/2024
Decision 04/2026 (Estimated)
Implementation 05/2026 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
2024 Monkey Flower Research Weather Station
This project will provide weather data to support a long-running research project on the Monkey flower. A small weather station will be installed by digging a hole approximately the size of a 5-gallon bucket and filling it with cement to anchor it.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
2024 Peek Thin
The McKenzie River Ranger District is proposing approximately 109 acres of variable density thinning in three 46 to 48 year old plantation stands. Treatment would consist of thinning, dominant tree release, gaps up to 3 acres, and unthinned skips.
Learn About Thinning
Acres of Variable Density Thinning In Three 46 109
Acres (approx.) 3
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of Variable Density Thinning In Three 46 109
Acres (approx.) 3
Uncategorized
Uncategorized
Willamette National Forest
2024 USGS Pit Tag Application
The USGS will install a Passive-Integrated-Transporter (PIT) tags in the South Fork of the McKenzie River, upstream from Cougar Reservoir. It will operate in association with an existing USGS stream gage.
📍 McKenzie River Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Bado Thin
The Detroit Ranger District proposes to commercially thin approximately 33 acres in a plantation stand that is 65 years old. The purpose of the project is to increase stand health and vigor and provide timber to the local economy.
Learn About Wildfire Learn About Thinning
Acres (approx.) 33
📍 Detroit Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Acres (approx.) 33
Uncategorized
Uncategorized
Willamette National Forest
Big Lake Boat Launch
The McKenzie River Ranger District is proposing to add a temporary dock to the boat launch at the Big Lake Campground Boat Launch. The proposed dock will be a temporary dock that can be pulled in and out each season.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
Blair Lake Campground Fire Recovery
We are proposing to remove damaged trees at the Blair Lake Campground that were affected by the Cedar Creek Fire. The campground was heavily impacted by the fire and is currently closed to public access due to the dangerous conditions.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
CF Thin
The McKenzie River Ranger District is proposing approximately 125 acres of variable density thinning in three 65-70 year old plantation stands.
Learn About Thinning
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 125
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Cala-Wiley
The district proposes to treat 899 acres of under 80 plantations using thinning, dominant tree releases, gap creation, and skips then fuel treatments.
Learn About Wildfire Learn About Thinning
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 899
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Calloway
This project area encompasses 45,041 acres and is located on the McKenzie River and Sweet Home Districts of the Willamette National Forest north of Blue River, Oregon. Harvest units are in two sub watersheds, with 281 units totaling 5,886 acres.
Learn About Wildfire Learn About Thinning
Acres 45,041
Acres 5,886
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres 45,041
Acres 5,886
Uncategorized
Uncategorized
Willamette National Forest
Campground Host Site Improvements
Underground plastic holding tanks would be installed at many campgrounds within 10 feet of trailer pad. If the current host site is unsuitable, a new site could be selected. Parking barriers would be installed to prevent driving over tanks.
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 06/22/2022
Decision 12/2027 (Estimated)
Implementation 06/2028 (Estimated)
Uncategorized
Uncategorized
Willamette National Forest
Cedar Creek Fire Trail Bridge Replacements
The purpose of this project is to return two stream crossings on the Jim Weaver Loop to a useable and safe state for public use. The Dam Camp and Elbow Lake bridges were burned in the 2022 Cedar Creek Fire and are now a hazard for public use.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Clark Creek Organizational Camp Hazard Tree Removal
The purpose of this project is to remove damaged trees at Clark Creek Organizational Campground that was affected by the 2023 Bedrock Fire.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Cowhorn Trail Cutoff
Oregon Cascades Recreation Area remains disconnected between the west and east sides as it stands. No bike-legal single track route exists from the popular Timpanogas area to the Windy Lakes. This proposed cutoff will create better connectivity.
MilestoneDate
Scoping Start 05/09/2018
Decision 06/2024 (Estimated)
Implementation 07/2024 (Estimated)
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/09/2018
Decision 06/2024 (Estimated)
Implementation 07/2024 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Divide
This project would commercially harvest about 1,918 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes meadow restoration and sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
📍 Willamette National Forest 🏷 Forest products · Vegetation management (other than forest products) · Watershed management Added: 2026-05-28
In Progress
Acres of Managed And Natural Stands 1,918
MilestoneDate
NEPA Start Date 3/16/2020
Finding/Decision Date 6/18/2026
Significant Effect
Significant Effect
Willamette National Forest
Fall Creek
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Fish Lake Fire Resilience
The purpose of this project is to reduce the abundance of ladder fuels and canopy densities adjacent to Fish Lake Historic Site that is within the Wildland Urban Interface (WUI).
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Flat Country Floral Greens Project
This project would remove floral greens: beargrass, salal, fern fronds, and vine maple/ceanothus sticks. This would occur on approximately 28,523 acres of the McKenzie River Ranger District. The sell of these products will be done under permits.
Learn About Thinning
Acres of The Mckenzie River Ranger District 28,523
📍 McKenzie River Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of The Mckenzie River Ranger District 28,523
Mixed Impact
Mixed Impact
Willamette National Forest
Forest System Road 2209 Segment Repair
The District is proposing to return a 3.2 mile segment of FSR 2209 between the Opal Creek trailhead and Jawbone Flats to pre-Beachie Creek Fire condition. Road work may include culvert replacement, drainage repair, and incidental hazard tree removal.
📍 Detroit Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Hazard Tree Removal at Developed Recreation Sites
The proposed action is to fall hazardous trees at developed recreation sites within the portions of the Detroit Ranger District burned by the Beachie Creek and Lionshead fires of 2020.
📍 Detroit Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Ivy Cliff
This project would commercially harvest about 2037 acres of managed and natural stands to enhance the growth and structural complexity of the stands. Project also includes road density management, fuels improvement, sugar pine habitat restoration.
Learn About Wildfire Learn About Thinning
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Detroit Ranger District 🏷 Forest products · Land management planning · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
Acres of Managed And Natural Stands 2037
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lava Parks
Commercial harvest, rock pit expansion, meadows within units, Lava View Loop Viewpoint.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Little Owl Small Sale
Treat proposed units using a combination of commercial thinning, gaps, skips, and dominant tree release.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
📍 Sweet Home Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
NEPA Start Date 12/31/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Lowell Country Project
The project includes thinning of ~15,900 net acres of managed stands under 80 years of age to improve stand growth/vigor and to produce a sustainable supply of forest products, as well as maintain, store and/or decommission ~650 miles of roads.
Learn About Wildfire Learn About Thinning
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Willamette National Forest
Middle Fork Fire Affected Roads Project
Reduce the risks posed by fire-killed and injured trees that have fallen across or remain standing along important access routes of the Cedar Creek, Gales and Bedrock fire-affected road system. (Formerly known as Cedar-Gales Roadside Risk Reduction)
Learn About Wildfire Learn About Thinning
📍 Middle Fork Ranger District 🏷 Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Willamette National Forest
Monkeyflower Weather Stations
A special use permit has been requested by the University of Louisiana at Lafayette to install four weather stations around the common monkeyflower sites to monitor temperature and soil moisture.
📍 Sweet Home Ranger District 🏷 Research Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Post Fire Planting
Post-fire tree planting to reforest existing and future wildfire impacted areas to meet desired conditions for forest cover.
Learn About Wildfire Learn About Thinning
📍 Willamette National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Roadside Hazardous Fuels Reduction
The Detroit Ranger District is proposing to create fuel breaks to reduce hazardous fuels on strategic roads across the District: 10, 1012, 2212, 2236, and low severity burn sections of 2231 and 2233.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
📍 Detroit Ranger District 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 5/13/2025
Finding/Decision Date
Uncategorized
Uncategorized
Willamette National Forest
Scott Lake Parking Improvements
The project is proposing to create additional parking locations for a high use campground and trailhead.
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 McKenzie River Ranger District 🏷 Recreation management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/26/2025
Decision 04/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Willamette National Forest
Station Butte
Project to address the need for vegetation management to increase stand growth and diversity and support the local economy. Proposed action includes commercial thinning harvest and restoration activities.
Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Middle Fork Ranger District 🏷 Forest products · Watershed management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Steeple Rock Rigdon
Thinning with skips and gaps in about 3,200 acres, meadow restoration, floodplain restoration, roadside fuels reductions, dispersed campsite reconfiguration, travel management, and quarry development.
Learn About Wildfire Learn About Thinning
Acres (approx.) 3,200
📍 Middle Fork Ranger District 🏷 Recreation management · Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres (approx.) 3,200
Uncategorized
Uncategorized
Willamette National Forest
Strube Flats Fire Camp
This project would establish a permanent site for accommodating fire camps, and secure the site from motor vehicles by installing four gates at the entrances.
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
📍 McKenzie River Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/19/2026
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Sunny Thin
The McKenzie River Ranger District is proposing to treat approximately 63 acres located in four stands. Stands #1-3 are approximately 30 years old, whilestand #10 is approximately 110 years old.
Learn About Wildfire Learn About Thinning
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
📍 McKenzie River Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres (approx.) 63
MilestoneDate
NEPA Start Date 9/26/2025
Finding/Decision Date
Significant Effect
Significant Effect
Willamette National Forest
Supplemental EA for 2020 Fire Affected Road System Risk Reduction
Allow ground-based equipment to operate outside of the road prism to conduct fire killed and injured tree felling previously authorized by the 2020 Fire Affected Road System Risk Reduction project #61749.
Learn About Wildfire Learn About Thinning
📍 Willamette National Forest All Units 🏷 Forest products · Fuels management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Upper Canyon
The district proposes to treat 1,069 acres of under 80 stands using thinning, dominant tree release, gap creation, and skips. Meadows would be restored and fuels treated.
Learn About Wildfire Learn About Thinning
Acres 1,069
📍 Sweet Home Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Acres 1,069
Uncategorized
Uncategorized
Willamette National Forest
West Fork 8th Creek OHV Trail Bridge Replacement
The purpose of this project is to rebuild the West Fork 8th creek trail bridge. The bridge has failed and collapsed. There is a need for the bridge to be replaced to enhance user safety and protect natural resources.
📍 Middle Fork Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Willamette National Forest
Youngs Rock Rigdon
Forest management treatments are proposed on approximately 6,500 acres within the project area. Treatment proposed include thinning, early seral creation, fuel reduction, habitat restoration, system road management, recreation management.
Learn About Wildfire Learn About Thinning
Acres (approx.) 6,500
📍 Middle Fork Ranger District 🏷 Recreation management · Heritage resource management · Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management · Watershed management · Road management Added: 2026-05-28
Completed
Acres (approx.) 6,500
Significant Effect
Significant Effect
Malheur National Forest
62 Road Fuel Break
The 62 Roadside Fuel Break CE Project would address hazardous fuel conditions on approximately 305.97 contiguous acres adjacent to roadways
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
📍 Prairie City Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 08/2024 (Estimated)
Decision 11/2024 (Estimated)
Implementation 01/2025 (Estimated)
Significant Effect
Significant Effect
Malheur National Forest
Emigrant Creek Ranger District Aspen Project
The purpose of this project is to improve and restore aspen communities within the boundary of the Emigrant Creek Ranger District of the Malheur National Forest.
Learn About Wildfire Learn About Thinning
📍 Malheur National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
North Fork Allotment Range Improvements and Maintenance
This project authorizes improvements and subsequent maintenance of range infrastructure on the North Fork allotment on the Prairie City Ranger District of the Malheur NF. These include spring developments, fencing, and water gaps.
📍 Prairie City Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Malheur National Forest
OTEC Power Pole Replacement Project
Replace existing wooden power poles with fire resistant Ductile Iron poles.
📍 Emigrant Creek Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Malheur National Forest
Upper Bear Lake
Promoting landscape resiliency within a complex disturbance regime of wildfire, drought, insects, and diseases, providing a road system that is environmentally and economically sustainable that moves toward access and resource management objectives.
Learn About Wildfire Learn About Thinning
📍 Prairie City Ranger District 🏷 Forest products · Vegetation management (other than forest products) · Fuels management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Five Green Restoration Project
The project purpose is thinning stands less than 80 years old in order to enhance and accelerate old-growth conditions in Late Successional Reserve and Matrix areas. There are commercial thinning actions as well as road work, invasive weed treatments, and slash disposal.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Central Coast Ranger District-ODNRA 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Siuslaw National Forest
Forest Plan Amendment for Wilderness Management
Updating standards, guidelines, and other Forest Plan components for stewardship of the Siuslaw's four wilderness areas. Responding to changed conditions since Forest Plan approval, including designation of new wilderness in 2019.
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Special area management · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 12/2025 (Estimated)
Comment Period 12/2025 (Estimated)
Objection Period Start 05/2026 (Estimated)
Decision 07/2026 (Estimated)
Implementation 07/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Integrated Invasive Species Project
This project would develop a strategy that allows an array of tools to be used for reducing invasive weeds across the Siuslaw NF. One component would add four new chemicals to approved use list, requiring a plan amendment. https://bit.ly/3RT9D4e
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Wildlife, fish, rare plants · Vegetation management (other than forest products) · Projects that may affect wilderness (for mailing list contacts) Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2025 (Estimated)
Comment Period 06/2025 (Estimated)
Objection Period Start 12/2025 (Estimated)
Decision 03/2026 (Estimated)
Implementation 03/2026 (Estimated)
Mixed Impact
Mixed Impact
Siuslaw National Forest
Long Term Development of a Plan to Restore Vehicular Access to Cascade Head via FSR 1861
To re-establish safe vehicular access to upper Cascade Head and stabilize landslide impacted areas from a 2021 landslide.
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
📍 Hebo Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 01/2026 (Estimated)
Decision 01/2029 (Estimated)
Implementation 01/2029 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Marys Peak Thatch Burning Project
This project is intended to remove built-up thatch produced from a large patch of treated creeping velvetgrass (Holcus mollis) by mowing, burning, and other actions and to revegetate these sites with native plants sourced exclusively from Marys Peak.
Learn About Wildfire Learn About Thinning
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
North Fork Smith Restoration
This is a landscape-scale terrestrial restoration project in the North Fork Smith River watershed area. Activities include: plantation thinning, wildlife habitat enhancement, invasive plant treatments, and road improvements.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 08/12/2024
Comment Period 08/12/2024
Objection Period Start 06/02/2025
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Siuslaw National Forest
ODNRA South Jetty and Eel Creek Water Systems
Drinking water system replacement at Eel Creek Campground and South Jetty Area. Work at this facility would include waterline and treatment system replacement and well rehabilitation.
📍 Central Coast Ranger District/Oregon Dunes National Recreation Area 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Oregon Dunes National Recreation Area OHV Sound Limit Forest Plan Amendment
Forest Plan amendment proposal to increase the sound limit for ORVs to more nearly match those of Oregon State DEQ limits.
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
📍 Siuslaw National Forest All Units 🏷 Land management planning · Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/25/2021
Comment Period 12/2022 (Estimated)
Objection Period Start 02/2023 (Estimated)
Decision 04/2023 (Estimated)
Implementation 05/2023 (Estimated)
Significant Effect
Significant Effect
Siuslaw National Forest
Sand Lake Restoration Project
This is a landscape-scale restoration project in the Sand Lake watershed. Activities include: plantation thinning, fish and wildlife habitat enhancement, invasive plant treatments, road and recreation improvements, and sand dune restoration.
Learn About Wildfire Learn About Thinning
📍 Hebo Ranger District 🏷 Recreation management · Special area management · Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Siuslaw National Forest
Yamina (Yamhill-Willamina) Restoration Project
The Yamina project will focus on commercial thinning to support development of old growth characteristics for the future in the Yamhill-Willamina Watershed.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
📍 Hebo Ranger District 🏷 Forest products · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 11/3/2025
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Antlers Resort Marina 20-Year Permit Issuance
Issuance of a new 20-year special use authorization (permit) to replace the existing permit which will allow for continued operation and management of Antlers Resort Marina. No changes will be made to currently authorized operations or facilities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Ash Creek Forest Health and Fuels Reduction Project
The Shasta-Trinity National Forest proposed the Ash Creek Forest Health and Fuels Reduction project to address high stand densities, on-going insect and disease outbreaks, and wildfire risk. Project information is available at: https://usfs-public.box.com/s/wqgxkuomwx42lfx6f31owbqoep2w5jyi
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 McCloud Ranger District 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Big Ranch Community Risk Reduction
The Project designed to reduce the risks associated with high intensity wildfire and improve forest health and function through forest thinning, reduction of hazardous fuels, reforestation and prescribed fire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/27/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Bowerman Cooperative Fuel Break Project
The purpose of the Project is to increase the effectiveness of fuel breaks and fuel reduction projects across ownership boundaries, to improve forest health and function, and to improve ingress and egress for firefighters and the public.
Learn About Wildfire Learn About Thinning
📍 Weaverville Ranger District 🏷 Forest products · Fuels management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Carlson Road Construction Authorization
Issuance of a special use permit to authorize a private landowner to construct a new access road that would be 2,337 feet long by 30 feet wide on National Forest System lands. Road location is within the Backbone Inventoried Roadless Area.
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/14/2025
Decision 05/2025 (Estimated)
Implementation 06/2025 (Estimated)
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Corral Gulch Restoration
The FS will work with the Watershed Center of Hayfork, CA to restore floodplain function, raise the groundwater table, increase streamflow, decrease water temperatures, and decrease erosion and sedimentation, ultimately improving wildlife habitat.
Learn About Wildfire Learn About Thinning
📍 Hayfork Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Gemmill Thin
Thinning and fuels reduction to enhance and protect late successional habitat.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Wildlife, fish, rare plants · Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Hyampom Community Wildfire Risk Reduction Project
This project proposes to reduce wildfire risk to the community of Hyampom and improve forest resiliency through forest thinning, reduction of hazardous fuels and prescribed fire to reestablish natural fire regimes.
Learn About Wildfire Learn About Thinning
📍 Shasta Trinity National Forest All Units 🏷 Forest products · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Junction City Community Risk Reduction Project PALS #68960
e Project is being designed to lower high- severity wildfire risk to the community of Junction City by reducing hazardous fuels around the community and improving forest health and resilience.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Weaverville Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. For more information, visit: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress
MilestoneDate
Scoping Start 05/13/2025
Comment Period 01/2026 (Estimated)
Decision 05/2026 (Estimated)
Implementation 06/2026 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Lakehead and Platina Transfer Stations Permit Reauthorization
Issue new special use permit to Shasta County to replace expiring permits. There will be no changes to the authorized facilities or increases in the scope or intensity of authorized activities.
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Shasta-Trinity National Forest
Lava Roads Repair Project
The Forest plans to improve, realign, and decommission project roads to establish a minimum and efficient transportation system and address safety, accessibility, and maintenance concerns.
📍 Mt. Shasta Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Minersville Boat Launching Facility Improvements
Remove existing asphalt boat ramp & replace with a two-lane, concrete, v-grooved, low-water ramp with turn-arounds & sidewalk. Add parking area above high water mark of Trinity Lake. Replace existing restroom with new restroom. Widen access driveway.
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 06/2025 (Estimated)
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
North Trinity Community Risk Reduction
The proposed project is designed to reduce risk to rural communities from catastrophic wildfire by reducing hazardous fuels, increasing safety adjacent to critical egress/ingress routes, and improving the resiliency of forested ecosystems.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 2/17/2026
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment -- Antler 12kV Powerline Undergrounding Phases 1, 1.2, 1.3, and 2
Authorize the use and occupancy of National Forest System lands for PG&E's Antler 1101 1384 Phases 1, 1.2, 1.3 and 2 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019 ("Master Permit").
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PG&E Master Agreement Amendment Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6
Authorize the use and occupancy of NFS lands for PG&E's Antler Undergrounding 1101CB, 11011612 Phase 1.3, 11011612 Phase 1.6 project to underground powerlines by issuing an amendment to PG&E's existing special use authorization SHF02262019
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 08/2025 (Estimated)
Decision 09/2025 (Estimated)
Implementation 10/2025 (Estimated)
Uncategorized
Uncategorized
Shasta-Trinity National Forest
PGE Hogback Microgrid 30-Year Permit Issuance
Issuance of a 30-year special use authorization to PG&E for construction, operation & maintenance of a remote microgrid on Hogback Mountain to replace the existing source of service via the existing Pit No. 7 1101 electric distribution 12KV line.
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Shasta Lake Ranger District 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 05/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Parks-Trinity Fuelbreak Project
The Forest plans to create a linear fuelbreak approximately 500 feet on either side of FS 17 Road to help protect the wildland-urban interface and establish safe routes for the public and firefighters in a wildfire situation.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Pit/Curl Cooperative Fuel Break Project
Create linear fuel breaks to modify future fire behavior and connect fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire while also reducing risk to nearby communities. For project documents, visit: https://usfs-public.box.com/s/7oxlzaz0ebn7zb1fjs9amje8izehgqwf
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 2/1/2026
Finding/Decision Date
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Root Fire Hazard Abatement Project
The project is proposed to recover the economic value of fire impacted stands, reduce the risk from roadside hazards, accelerate forest recovery, and reduce the likelihood and intensity of a reburn. Project information is available at - https://usfs-public.box.com/s/al78orqta5ilowffv2snxq4ie6y0eemm
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
📍 Mt. Shasta Ranger District 🏷 Forest products · Fuels management · Regulations, directives, orders · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/8/2025
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Shasta-Trinity National Forest Outfitter/Guide Temporary and Priority Permit Authorizations
The Shasta-Trinity National is amending its process for authorizing outfitter and guide permits and will issue both temporary permits (authorizes use for less than one year) and priority permits (authorizes use for ten years).
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Shasta-Trinity National Forest
South Fork Motorized Trail Project
Up to 19-miles of motorized user created trails would be added to the system. These trails would be constructed and maintained to Forest Service standards.
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 04/09/2024
Decision 02/2025 (Estimated)
Implementation 05/2025 (Estimated)
Significant Effect
Significant Effect
Shasta-Trinity National Forest
South Fork Sacramento Public Safety and Forest Restoration Project
Establish fuel management zones; thin trees; reduce fuels; restore meadows; develop new/expand existing campgrounds & parking; establish trailheads & trails; & repair riparian/habitat damage.
Learn About Wildfire Learn About Thinning
📍 Mt. Shasta Ranger District 🏷 Recreation management · Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Shasta-Trinity National Forest
Trinity Divide / Lakehead Cooperative Fuel Break Project
Creation of linear fuel breaks to modify future fire behavior and connect with fuel breaks on adjacent private lands, to reduce risk of uncharacteristic wildfire and reduce risk to communities. For project documents visit: https://usfs-public.box.com/s/6a1i45z4za8fpq24158rf0mhjhresu8d
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
📍 Shasta-Trinity National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/1/2026
Finding/Decision Date
Uncategorized
Uncategorized
Shasta-Trinity National Forest
Wildfire Risk Reduction, Reliability, and Asset Protection (WRAP)Project
The Trinity Public Utilities District and the Western Area Power Administration (lead Federal agency) propose a right-of-way expansion and vegetation management project to reduce fire risk to the surrounding communities. STNF is a cooperating agency.
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
📍 Shasta Trinity National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 12/11/2020
DEIS NOA in Federal Register 04/2023 (Estimated)
FEIS NOA in Federal Register 12/2023 (Estimated)
Objection Period Start 10/2023 (Estimated)
Decision 12/2023 (Estimated)
Implementation 01/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Airport Pit Disposal Site Permit Renewal
Reissuance of special use permit to the Town of Mammoth Lakes for operation of clean waste disposal at the Airport Pit
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 01/2022 (Estimated)
Decision 03/2022 (Estimated)
Implementation 04/2022 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Control Silver Peak Project
Southern California Edison is proposing to update and reconfigure approximately 61 linear miles of two existing 55 kilovolt subtransmission lines originally designed and built in the 1930s. BLM is lead agency. Full description: https://bit.ly/44zSlg
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 12/29/2023
DEIS NOA in Federal Register 05/2025 (Estimated)
FEIS NOA in Federal Register 02/2026 (Estimated)
Objection Period Start 11/2025 (Estimated)
Decision 02/2026 (Estimated)
Implementation 04/2026 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Coyote Flat OHV Recreation Enhancement
Improve road and motorized trail management in the Coyote Flat area. Repair system roads for safety and resource protection, review travel management decision in this area and adjust if needed for resource protection and recreation enhancement.
📍 Inyo National Forest All Units 🏷 Recreation management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Inyo National Forest
Crystal Crag Water Storage Tank Replacement
The removal of two existing water storage tanks & constructing a new one. The new steel water storage tank will be 20,000-gallons, 16-foot diameter and 16 ft high. Including new inlet, outlet, drain, overflow, water supply, and distribution pipelines
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 09/2024 (Estimated)
Decision 09/2024 (Estimated)
Implementation 09/2024 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
E. Clampus Vitus Bodie Chapter No. 64 Tamarack Lodge Plaque
Bodie Chapter No. 64 of E. Clampus Vitus is to construct a historical marker w/ bronze plaque northeast of the Tamarack Lodge entrance commemorating the history of the Lodge & its contribution to the history of Mono County and the Mammoth Lakes Basin
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
📍 Mammoth Ranger District 🏷 Heritage resource management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 07/23/2024
Decision 08/2024 (Estimated)
Implementation 09/2024 (Estimated)
Mixed Impact
Mixed Impact
Inyo National Forest
Eastern Sierra Climate and Communities Resilience Project
Project collaboration website link: https://www.eswildfirealliance.org/esccrp. Approx. 58,000 acre forest restoration project around the Town of Mammoth Lakes. Activities may include thinning of live and dead trees, pile burning, mechanical and hand.
Learn About Wildfire Learn About Thinning
Acres (approx.) 58,000
📍 Inyo National Forest All Units 🏷 Fuels management · Climate change adaptation Added: 2026-05-28
Completed
Acres (approx.) 58,000
Uncategorized
Uncategorized
Inyo National Forest
Inyo National Forest Over-Snow Vehicle (OSV) Use Designation
The Inyo National Forest is evaluating its management of over snow vehicle (OSV) use. The purpose of this project is to designate system roads, trails and areas where OSV use will be allowed, in compliance with 36 CFR 212, Subpart C.
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management Added: 2026-05-28
On Hold
MilestoneDate
Scoping Start 12/2026 (Estimated)
Comment Period 05/2027 (Estimated)
Objection Period Start 09/2027 (Estimated)
Decision 01/2028 (Estimated)
Implementation 02/2028 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
LADWP Long Valley Pole Removal and Pole Replacement Project
LADWP Utility Maintenance Project:1)removal of poles & replacement of poles in one line and 2)removal of poles & rehab in second line, 3)relinquish poles
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2024 (Estimated)
Decision 07/2024 (Estimated)
Implementation 10/2024 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Long Valley Exploration Drilling
On November 12, 2025, the Mammoth Lakes Ranger District of the Inyo National Forest received a Plan of Operations (Plan) from KORE USA Ltd. (KORE) for their Long Valley Exploration Drilling project in Mono County, California. KORE plans to conduct exploration-level activities for deposits of gold.
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
📍 Inyo National Forest 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/3/2026
Finding/Decision Date
Uncategorized
Uncategorized
Inyo National Forest
Mammoth Mountain Main Lodge Redevelopment
Mammoth Mountain proposes redeveloping its Main Lodge area on private land, with related development on adjacent National Forest lands. Joint CEQA/NEPA analysis. Proposed construction/reconstruction of parking lots,buildings,chairlifts and ski runs.
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Inyo National Forest All Units 🏷 Recreation management · Special use management Added: 2026-05-28
In Progress
MilestoneDate
NOI in Federal Register 11/14/2022
DEIS NOA in Federal Register 08/2025 (Estimated)
FEIS NOA in Federal Register 04/2025 (Estimated)
Objection Period Start 01/2026 (Estimated)
Decision 04/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Mazourka Canyon Abandoned Mine Lands Safety Closures
Safety closures and restoration for three abandoned mine sites in Mazourka Canyon. Closures will include plugging or placing bat-friendly gates on mine shafts, removing abandoned equipment or materials, and placing rocks for more natural appearance.
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Minerals and geology Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 07/17/2023
Decision 08/2025 (Estimated)
Implementation 09/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Permit Reissuances - Ongoing, various permit types
Ongoing and continuous reissuance of various special use authorizations. Examples of these are resorts, research activities, utilities and events. For further information on any specific permit or permitted activities, contact Erin Noesser.
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 12/10/2018
Decision 06/2026 (Estimated)
Implementation 06/2026 (Estimated)
Significant Effect
Significant Effect
Inyo National Forest
Rock Creek Lodge Resort Wildfire Resilience
Fuels reduction and forest resilience project surrounding the Rock Creek Lakes Resort permit area on the Inyo National Forest. Project is funded by a National Resources Conservation Service grant.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
📍 Inyo National Forest All Units 🏷 Fuels management Added: 2026-05-28
In Progress Categorical Exclusion
MilestoneDate
Scoping Start 09/01/2024
Decision 03/2025 (Estimated)
Implementation 06/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Sherwin Area Recreation Plan 3 (SHARP)
Development of designated trails for protection of natural and cultural resources. This proposed action includes decommissioning of user created trails, reconstruction of user created trails, and new trail construction.
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
📍 Mammoth Ranger District 🏷 Recreation management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
Scoping Start 04/2025 (Estimated)
Decision 06/2025 (Estimated)
Implementation 07/2025 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Southern California Edison Control-Silver Peak 55kV Reliability Project
Installation of remote fault indicators, packet routers, and installation of remote switches along with poles replacements.
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold
MilestoneDate
NOI in Federal Register 11/2023 (Estimated)
DEIS NOA in Federal Register 03/2024 (Estimated)
FEIS NOA in Federal Register 06/2026 (Estimated)
Objection Period Start 06/2025 (Estimated)
Decision 06/2026 (Estimated)
Implementation 07/2026 (Estimated)
Uncategorized
Uncategorized
Inyo National Forest
Vista Towers, multi-carrier facility at Little Antelope Communication Site
Placement of multi-carrier building and tower at the Little Antelope Communications Site
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)
📍 Inyo National Forest All Units 🏷 Special use management Added: 2026-05-28
On Hold Categorical Exclusion
MilestoneDate
Scoping Start 05/2018 (Estimated)
Decision 08/2018 (Estimated)
Implementation 09/2018 (Estimated)
Uncategorized
Uncategorized
Los Padres National Forest
DOJ Tower Replacement at Tassajera Peak Communications Site
The US Department of Justice (DOJ) proposes to replace their existing 20' tower with a new 40' tower on an approximately 8' x 8' concrete pad within the existing footprint of the communications site, and enclosed by a new 22' x 28' security fence.
📍 Santa Lucia Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
East Camino Cielo Ignition Reduction Project
To improve the ecological condition of roadside environments and reduce the probability of ignitions. This will be accomplished by removing non-native grasses and herbs followed by native seeding and planting.
Learn About Wildfire Learn About Thinning
📍 Santa Barbara Ranger District 🏷 Vegetation management (other than forest products) · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
Establishing Interim Direction for Oil & Gas Leasing Management
Amend the Los Padres Forest Plan and the Southern California Forest Plan to establish interim direction for processing new lease applications for oil and gas, and remove references to and withdraw the 2005 Oil and Gas Record of Decision. https://usfs-public.box.com/s/8hb9zdav0fv3huge15oga4bzaec0yji6
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
📍 Los Padres National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 12/4/2025
Finding/Decision Date
Uncategorized
Uncategorized
Los Padres National Forest
King City Fire Station
Proposal to build a fire station to replace the Nacimiento Fire Station, which burned in the 2020 Dolan Fire. Proposed construction would occur on the King City administrative site, adjacent to the Monterey District Ranger Station. https://usfs-public.app.box.com/v/PinyonPublic/folder/364597850112
📍 Monterey Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Los Padres National Forest
Los Padres Flood Damage Repair, Road Maintenance, and Aquatic Passage Improvement Project
Flood Damage Repair, Road Maintenance and Aquatic Passage Improvement.
📍 Los Padres National Forest All Units 🏷 Wildlife, fish, rare plants · Watershed management · Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Los Prietos Helibase
The proposal is to construct a helicopter pad, associated safety facilities, and office space for the module within the lower compound at the Los Prietos Ranger Station.
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
📍 Santa Barbara Ranger District 🏷 Facility management Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 4/1/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Los Padres National Forest
Manzana Creek Watershed Sediment Reduction Project
Fire and subsequent impacts from flooding and runoff have damaged existing drainage features. The Manzana Creek Watershed Sediment Reduction Project proposes to improve erosion control through erosion prevention treatments along several roads in the
📍 Santa Lucia Ranger District 🏷 Wildlife, fish, rare plants · Watershed management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Los Padres National Forest
Mount Pinos Forest Health Project - PALS #58380
Healthy Forest thinning project designed to improve the health and vigor of the existing stands and to make the stands more resilient to stressors such as drought, insects & wildfire.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
📍 Los Padres National Forest 🏷 Forest products · Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date 3/30/2021
Finding/Decision Date
Significant Effect
Significant Effect
Los Padres National Forest
Piru Creek Wild and Scenic River (WSR) - Comprehensive River Management Plan (CRMP)
In support of the CRMP for Piru Creek WSR, final documents are available for an objection period pursuant to Forest Service Regulations (36 CFR 218). See posted notice for background and instructions on submitting comments.
📍 Angeles National Forest All Units 🏷 Land management planning Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Pothole Trail (18W04) Reroute
Reroute 3.1 miles of the existing Pothole Trail from it's junction with Piru Canyon Road to the Sespe Wilderness boundary to create a more sustainable, user-friendly trailway that meets Forest Service trail standards.
📍 Ojai Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Los Padres National Forest
Renewal of expired Special Use Permit ORD12012
Renewal of an expired SUP of a 3" oil pipeline in the Sespe oil field, with no change to the facilities or scope of operation.
📍 Los Padres National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Alert California Wildfire Cameras
Installation and operation of wildfire camera system at 11 lookout sites.
📍 Klamath National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore IMA 2502
Cal-Ore Communication is proposing to place a telecommunication cable and appurtenances in and around the Macdoel and Tenant area. This new fiber optic cable would upgrade existing telecommunications and internet services.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Klamath National Forest
Cal-Ore Reconnect 3
The project proposes to install and operate approximately 8.19 miles of new fiber optic communications cables and ancillary facilities in non-continuous routes within the project area.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Discovery Day Mine
The Discovery Day Mins is an established mine site that consists of a road, three working pads, and underground tunnels. A Plan of Operations has been proposed to mine the Discovery Day claim
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Salmon River Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Gate Installation and Seasonal Road Closure on FS Road 46N73
Installation of a seasonal gate on Forest Service Road 46N73. New special use permit. Water Board Waiver n/a.
📍 Happy Camp Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Goosenest Developed Recreation Sites Fuels Reduction Project
Remove hazardous fuels from within and around all developed recreation sites on the Goosenest Ranger District.
Learn About Wildfire Learn About Thinning
📍 Klamath National Forest All Units 🏷 Recreation management · Fuels management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Klamath and Shasta-Trinity National Forests' Prescribed Fire Project
Fuels reduction and prescribed fire across the landscape. Project details: https://www.fs.usda.gov/r05/klamath/projects/66583
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
📍 Klamath National Forest 🏷 Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 12/19/2025
Finding/Decision Date
Significant Effect
Significant Effect
Klamath National Forest
McKinney Fire Restoration EA_Veg/Fuels
The McKinney Fire Restoration EA is proposed within and adjacent to the 2022 McKinney Fire footprint with the purpose of increasing wildfire resilience on the landscape. Proposed activities include a variety of fuels reduction treatments.
Learn About Wildfire Learn About Thinning
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Oak Knoll Ranger District 🏷 Fuels management · Vegetation management (other than forest products) Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Klamath National Forest
Middle Mile Broadband Initiative
This project is proposing to use Federal funding to provide broadband access to rural communities. Using Federal funds to place fiber optic lines in the existing right-of-way corridor is the only viable way to provide residents with broadband.
📍 Klamath National Forest 🏷 Special use management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Klamath National Forest
River Complex Post Fire Restoration
This project was created to respond to conditions created by the 2021 River Complex Fires and to reflect the changes in post fire conditions. This project includes site preparation, prescribed burning, reforestation, and sediment reduction activities
Learn About Wildfire Learn About Thinning
📍 Salmon River Ranger District 🏷 Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
Seiad Restoration Thin
The project will treat 3,350 acres within the 4,648-acre project boundary for fire risk reduction and community and resource protection within the Wildland Urban Interface.
Learn About Wildfire Learn About Thinning
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
📍 Klamath National Forest 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
Acres 3,350
MilestoneDate
NEPA Start Date 1/23/2026
Finding/Decision Date
Mixed Impact
Mixed Impact
Klamath National Forest
South End
Vegetation management and fuels reduction project with watershed restoration, resource protection, and public safety aspects. Water Board Waiver Category B expected.
Learn About Wildfire Learn About Thinning
📍 Goosenest Ranger District 🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products) · Fuels management · Watershed management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Klamath National Forest
South Fork
The South Fork project is an active management project with the purpose of addressing hazardous fuels conditions along roads and private property, as well as aligning with Executive Order 14225, Immediate Expansion of American Timber Production.
Learn About Wildfire Learn About Thinning
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
📍 Klamath National Forest All Units 🏷 Forest products · Fuels management Added: 2026-05-28
Developing Proposal
MilestoneDate
Scoping Start 06/2026 (Estimated)
Comment Period 09/2026 (Estimated)
Decision 11/2026 (Estimated)
Implementation 04/2027 (Estimated)
Significant Effect
Significant Effect
Klamath National Forest
Tennant Waterline
This project proposes to replace approximately two miles of water pipeline and two water troughs in the Bray cattle allotment on the Goosenest Ranger District.
📍 Goosenest Ranger District 🏷 Grazing management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Alaska DOT - turnagain Arm Weather Station
Installation and maintenance of a weather station to monitor an avalanche zone at MP 21 Seward Highway.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Alaska Energy Authority Transmission Line Rebuild Russian River to Cooper Creek
Alaska Energy Authority is proposing to upgrade the infrastructure in an existing right-of-way (ROW).
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
CCO Experiential is proposing hiking and camping on Cordova Ranger District
Coalition of Christian Outreach Experiential Designs is proposing to bring college students to camp in Sheep Bay, Orca Inlet, Orca Bay, and Simpson Bay and hike and camp on the Sand Trail leading to the Scott Glacier.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Cannery Creek Dam Structural and Safety Improvements
Alaska Department of Fish & Game have proposed dam improvements on the Cannery Creek Dam. The current structure has safety issues for staff operating the dam as well as in protection of the hatchery in the event of a dam breach.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Chugach Electric Association Portage to Whittier Shore Power Line Rebuild
CEA has proposed a line rebuild between Portage and Whittier to provide shore power to the Whittier cruise ship terminals.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Chugach National Forest Elodea Early Detection and Rapid Response
Adopt the language of the Programmatic Environmental Assessment of the U.S. Fish and Wildlife Service Management Strategy for Elodea and Other Submersed Aquatic Invasive Plants in the Alaska Region as the Chugach NF's management strategy.
Learn About Wildfire Learn About Thinning
📍 Chugach National Forest All Units 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Eyak River Trail Maintenance
Maintain and repair trail within existing footprint.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Chugach National Forest
Forest Service Road 250 Realignment
Realign United States Forest Service Road 250 to educe erosion from the road surface, improve public access, restore essential fish habitat, and improve fish passage and floodplain connectivity.
📍 Cordova Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Main Bay Hatchery Safety Upgrades
ADFG has proposed the following safety upgrades at the Main Bay Fish Hatchery in Prince William Sound: removal and replacement of fuel tanks and lines, installation of permanent seine net anchors,& improved electric bear fence to protect brood pond.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Marine Debris Removal in Prince William Sound
The Cordova Ranger District has received proposals for (3) separate marine debris clean up projects in Prince William Sound.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
McCarthy River tours is proposing to conduct Outfitter Guide activities along the Copper River.
Nick Merlino or McCarthy River tours is proposing to raft clients down the Copper River and camp on National Forest system lands along the way.
📍 Cordova Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Port Chalmers Cabin Relocation
Build a new Port Chalmers Cabin at a site more easily accessed by users, and decommission the existing site.
📍 Cordova Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Derickson Bay Trail Addition 2026
The Glacier Ranger District proposes to add Derickson Bay Trail as a .26 mile Trail Class 2 Hiker/Pedestrian trail. https://usfs-public.box.com/s/zzj5kdpemsfmd2b2mt7ssjjtj3pep6lq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Esther Island North Trail Decommission 2026
The GRD Trails program would like to formally decommission Trail 113: Esther Island North Portage Trail which no longer exists. https://usfs-public.box.com/s/z2mezylqg11rmu1el1ve096i765s58qi
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Red Lake Portage Trail Decomission 2026
The Glacier Ranger District proposes to decommission Trail 127: Red Lake Portage Trail. This is a .2 mile trail is located in Esther Passage in Prince William Sound that no longer exists. https://usfs-public.box.com/s/l9qo4yxtanvw665o727m1nby1zqjt30q
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Sunburt Ski Trail Addition 2026
The Glacier Ranger District proposes to add Sunburst Ski Trail as a Trail Class 2 (snow) trail. This over snow trail starts at the mile 67 turnoff on the Seward Highway and continues to the crest of Sunburst. https://usfs-public.box.com/s/ote9omeuspdylddcooa4orwjfbjkb7z9
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD TOBI Extension Project
This project would connect the two currently existing segments of the Trail of Blue Ice in Portage Valley through the Moose Flats Day Use Area. This project would also decommission one vault toilet and the Moose Flats Trail. https://usfs.app.box.com/folder/373153676432
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Tincan Trailhead 2026
Creation of new trailhead and associated facilities in Turnagain Pass near mile post 69.9 of the Seward Highway. https://usfs-public.app.box.com/s/6bhyjz1p3ky33bvc14xn9gfxzd4vdqfq
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
R10 CNF GRD Trinity Point Recreation Area 2026
The USDA Forest Service is proposing to construct new day use recreation facilities on National Forest System Lands on the Glacier Ranger District of the Chugach National Forest. https://usfs-public.box.com/s/b6mrcughst0hw6rsedbmz68v3s8csaml
📍 Glacier Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Chugach National Forest
Recreation Opportunity Spectrum Forest Plan Amendment
The proposed amendment would change the ROS Class at Trinity Point from Semi-Primitive Motorized to Roaded Natural. Only 30 acres of land at Trinity Point would be affected.
Acres of Land At Trinity Point Would Be Affected 30
📍 Chugach National Forest All Units 🏷 Land management planning Added: 2026-05-28
Completed
Acres of Land At Trinity Point Would Be Affected 30
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Use Permits - New Proposals and Modifications to existing authorizations
Issuance of new outfitting and guiding authorizations to approved applications, or modification to existing outfitter guide authorizations in areas that have no capacity or resource concerns.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Chugach National Forest
Recreation Special Uses - Reissuance of expiring authorizations with no changes.
Reissuance of existing outfitting and guiding authorizations with no change in location or scope of use.
📍 Chugach National Forest All Units 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Amalga Trail Reconstruction - Sections 3 through 6
Improve Amalga Trail from mile 1.45 to mile 5.56, known as sections 3 to 6. Other improvements include improving signage, and establishing several rest areas along the trail.
📍 Juneau Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Breiland Slough Cabin Replacement
Proposal to replace the existing Breiland Slough public use recreation cabin and improve access to the site.
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
📍 Petersburg Ranger District 🏷 Recreation management Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 09/21/2021
Decision 01/2024 (Estimated)
Implementation 02/2024 (Estimated)
Uncategorized
Uncategorized
Tongass National Forest
Cannon Beach Cabin Construction
Proposal to convert a developed campsite within the Yakutat Beach Recreation Area into a public use recreation cabin site.
📍 Yakutat Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Tongass National Forest
Cannon Beach Parking Expansion
Expand existing parking lot, add new parking areas, and construct about 750 feet of new road to improve traffic flow and user safety, and meet capacity demands at the Cannon Beach Recreation Site.
📍 Yakutat Ranger District 🏷 Recreation management · Road management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Chichagof Old-Growth Blowdown Salvage Sale
Proposed salvage timber sale within in a blow down area adjacent to NFS road 8530. The harvest area would include 3 units and provide approximately 88 thousand board feet of timber from about 25 acres.
Learn About Thinning
Thousand Board Feet 88
Acres (approx.) 25
📍 Hoonah Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Thousand Board Feet 88
Acres (approx.) 25
Significant Effect
Significant Effect
Tongass National Forest
Continuation of Zarembo Minerals Plan of Operations 2023 to 2024
Proposal to continue authorizing exploration activities by Zarembo Minerals Co. on Zarembo Island until July 2023. Activities to continue include surface exploration and drilling, use of a closed spur road, and onsite storage of drilling equipment.
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
📍 Wrangell Ranger District 🏷 Minerals and geology Added: 2026-05-28
Cancelled Categorical Exclusion
MilestoneDate
Scoping Start 04/06/2022
Decision 09/2023 (Estimated)
Implementation 09/2023 (Estimated)
Uncategorized
Uncategorized
Tongass National Forest
False Bay Cabin New Construction
Construct a new recreation cabin at False Bay, on Chichagof Island, approximately 25 miles from Hoonah Alaska on FS Road 8530. Proposed features include: cabin, vault toilet, woodshed, picnic table/fire ring, parking area, access trails and buoy.
📍 Hoonah Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Greens Creek North Extension Project
Hecla Greens Creek Mining Company proposes to extend the existing dry-stack tailings disposal facility and incorporate waste rock co-disposal techniques in a northward direction for additional tailings and waste rock storage capacity.
📍 Admiralty Island National Monument 🏷 Minerals and geology Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Hecla Greens Creek Mining Company Surface Exploration 2026-2030
Hecla Greens Creek Mining Company proposes to extend their surface exploration authorization by five years and incorporate new areas of interest.
📍 Admiralty Island National Monument 🏷 Minerals and geology Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Helicopter Pad Reconstruction
Replace and improve three helicopter pads at the existing Etolin, Farragut, and Fools radio repeater administrative sites.
📍 Wrangell Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Herbert Glacier Cabin
Construct a new recreation cabin accessible to the public by helicopter or by foot via a 4.4-mile hike on the Herbert Glacier Trail. Other infrastructure includes a vault-style outhouse, a gathering area, a helicopter landing site and access trails.
📍 Juneau Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Herbert River - Installation of Environmental Monitoring Equipment
Installation and maintenance of 1 stream gauge and 2 meteorological stations to gather environmental data in support of the New Amalga Gold Mine.
📍 Juneau Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Juneau Ranger District Office to Bunkhouse Telecom Cable Connection
Install an underground Forest Service-owned and operated fiber optic cable between the district office building and Bunkhouse A, and between Bunkhouses A and B.
📍 Juneau Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Kake Redcedar Transplant
Annually, for the next 5 yrs, extract 200 to 300 native western redcedar seedlings growing on the roadbed of National Forest System road 6041. Plant along the Kake road system in areas disturbed by management activities. Only handtools would be used.
📍 Petersburg Ranger District 🏷 Vegetation management (other than forest products) Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Maybeso Potable Water System Replacement
Replace the potable water system for several Forest Service administrative buildings and a small school. Includes improvement of water reservoir, channel spillway and filtration treatment system.
📍 Craig Ranger District 🏷 Facility management · Research Added: 2026-05-28
Completed
Mixed Impact
Mixed Impact
Tongass National Forest
Nemo Road Stabilization
Approximately 5 miles of FS Road 6265 (Nemo-Skip Loop Road) & associated culverts will be repaired. Current wood waste road base will be replaced with more stable gravel surface, as well as other activities associated with road stabilization.
📍 Wrangell Ranger District 🏷 Road management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Pats Lake Shelters
Construct a group shelter and three-sided shelter at existing roadside day use sites adjacent to Pats Lake. Both sites would include a vault toilet and parking area.
📍 Wrangell Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Pats Lake Trail Extension
Construct 1/2 mile of trail to connect existing Pats Creek Trail to National Forest System road 6259. Construction includes aggregate, concrete steps and elevated boardwalk. Up to three spur trails proposed leading to wildlife viewing platforms.
📍 Wrangell Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF ANM Hecla Greens Creek Mine Treated Wastewater Outfall Line 002A 2026
Hecla Greens Creek Mining Co. proposes to install 14-inch dia. 1474-foot long treated water outfall pipeline, within their existing, permitted 30' wide ROW on NFS lands.
📍 Admiralty National Monument 🏷 Minerals and geology · Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD 2025 Chichagof Small Sales
To make 70 acres available for community access to small-scale timber sales utilizing ground-based logging systems without the use of heavy machinery to harvest. Multiple small sales provide for opportunities for harvest of firewood, sawlogs and other timber products for commercial use.
Learn About Thinning
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Forest products Added: 2026-05-28
Developing Proposal Categorical Exclusion
Acres 70
MilestoneDate
NEPA Start Date 8/29/2025
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF HRD Millrock Exploration Corp - Apex El Nido Project
The activity for the Apex-El Nido Exploration project entails conducting hard rock exploration through diamond core drilling. It is anticipated a maximum of 15 holes will be drilled.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Hoonah Ranger District 🏷 Minerals and geology Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF JRD 2026 Bonnie Brae Trail Rehabilitation
Bonnie Brae Trail Rehabilitation project will rehabilitate and harden an existing trail mostly within the existing trail prism, except where minor reroutes or switchbacks are needed. This trail connects the Bonnie Brae area to Treadwell Ditch Trail.
📍 Juneau Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF JRD Glacial outburst flood barrier along Backloop Road 2026
Due to the increasing annual glacial outburst flood event, the City and Borough of Juneau proposes emergency flood barrier construction of either HESCO barriers or a berm/levee parallel to the north of Backloop Road extending approximately 1,500 feet east of the bridge on state ROW and NFS lands.
📍 Juneau Ranger District 🏷 Land management planning Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF KMRD 2026 Deer Mountain Trail Maintenance
Project will complete trail maintenance and repairs on the Deer Mountain Trail from the trailhead to the first overlook, a distance of approximately one mile. Trail maintenance may include brushing and logging out the trail, and cleaning culverts and drainage ditches.
📍 Ketchikan - Misty Ranger District 🏷 Recreation management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF KMRD South Revillagigedo Integrated Resource Project
The Forest Service is proposing a multi-year project involving a variety of timber harvest, road construction, watershed restoration and recreation activities.
Learn About Thinning
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
📍 Ketchikan - Misty Ranger District 🏷 Forest products · Recreation management · Road management · Wildlife, fish, rare plants Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date 8/8/2018
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD 2026 Remote Admin Camp Improvements
Improvements at the existing False Island and Corner Bay administrative sites.
📍 Sitka Ranger District 🏷 Facility management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Deer Lake Coho Rearing Facility Permit Re-Issuance (NSRAA)
Re-issue special use permit for coho rearing facility- run by NSRAA
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF SRD Hidden Falls Fish Hatchery Alaska Department of Fish and Game
Re-Issue of special use permit for a salmon hatchery run by Northern Southeast Regional Aquaculture Association.
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Sitka Ranger District Added: 2026-05-28
Developing Proposal Categorical Exclusion
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF TBRD 2026 North Thorne Bay State Access
This project includes construction of 1 new temporary road on Forest Service lands and reconstruction of 1 existing temporary road on Forest Service lands for easement access to State of Alaska planned timber sales. Anticipated timing is summer FY26 & FY27.
📍 Thorne Bay Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF TBRD Twin Mountain II Timber Sale
The proposed action is expected to produce about 26.8 million board feet of timber from approximately 1,655 acres of National Forest System lands in the Staney and Red Bay areas within the Thorne Bay RD. Other activities include road construction, reconstruction, maintenance and decommissioning.
LFDC Commented Learn About Thinning
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
📍 Thorne Bay Ranger District 🏷 Forest products · Road management Added: 2026-05-28
Developing Proposal
Acres (approx.) 1,655
Million Board Feet 26.8
MilestoneDate
NEPA Start Date 9/14/2020
Finding/Decision Date
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF Tongass National Forest Land Management Plan Revision
Land management plan revision for the Tongass National Forest under the 2012 Planning Rule.
LFDC Commented
MilestoneDate
NEPA Start Date
Finding/Decision Date
📍 Tongass National Forest 🏷 Land management planning Added: 2026-05-28
Developing Proposal
MilestoneDate
NEPA Start Date
Finding/Decision Date
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF YRD 2026 Alsek River Special Use Facilities
Proposal to modify an existing permitted use within the authorized area, with minor additions and improvements to existing facilities.
📍 Tongass National Forest 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
R10 TNF YRD 2026 Italio River Special Use Facilities
Proposal to modify an existing permitted use within the authorized area, with minor additions and improvements to existing facilities.
📍 Tongass National Forest 🏷 Special use management Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
R10 TNF YRD 2026 Yakutat Community Needs
The overall objective of this project is to create a small-scale timber sale opportunity that benefits local operators and sawmills, while addressing ongoing environmental and safety issues. In addition to utilizing the naturally available salvage material, the project will facilitate access to the
Learn About Thinning
📍 Yakutat Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Southside Helicopter Sale
The Thorne Bay Ranger District is proposing to harvest approximately 125 acres of old growth live trees due to interest received from a prospective purchaser located on Prince of Wales Island. The area is 10 miles south of Naukati.
Learn About Thinning
Acres of Old Growth 125
📍 Thorne Bay Ranger District 🏷 Forest products Added: 2026-05-28
Completed
Acres of Old Growth 125
Uncategorized
Uncategorized
Tongass National Forest
Taku Inlet Monitoring Equipment Special Use Permit
Request from the US Border Patrol for a 10-year special use permit to install and maintain cameras to monitor vessels entering and exiting the Taku Inlet.
📍 Juneau Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Uncategorized
Uncategorized
Tongass National Forest
Temporary Storage Sites for Neck Lake Road Reconstruction
Proposal to establish 5 temporary storage and stockpile sites on National Forest System land in support of the Neck Lake Rd reconstruction project. Site areas total about 3.25 acres. Materials and improvements would be removed upon permit expiration.
Acres (approx.) 3.25
📍 Thorne Bay Ranger District 🏷 Special use management Added: 2026-05-28
Completed
Acres (approx.) 3.25
Significant Effect
Significant Effect
Tongass National Forest
Thorne Bay Basin Integrated Resource Management Project
This project would improve wildlife habitat, provide commercial young-growth harvest opportunities, implement riparian and road restoration activities in the project areas, as well as to provide support for employment and economic growth.
Learn About Wildfire Learn About Thinning
📍 Thorne Bay Ranger District 🏷 Wildlife, fish, rare plants · Forest products · Vegetation management (other than forest products) · Watershed management · Road management · Climate change adaptation Added: 2026-05-28
Completed
Significant Effect
Significant Effect
Tongass National Forest
Whale Pass Young Growth Small Sales
Harvest approximately 70 acres of live young-growth trees.
Learn About Thinning
Acres (approx.) 70
📍 Thorne Bay Ranger District 🏷 Forest products Added: 2026-05-28
Completed