The LFDC NEPA Tracker monitors active NEPA projects across National Forests in Washington, Oregon, California, and Alaska, giving advocates real-time visibility into proposed logging, land management, and restoration activities on public lands.
Projects are updated daily and organized to quickly find new projects and ones currently inviting public participation.
This database contains only the projects that have been published by USFS and that are/were recently in the NEPA analysis page.
Recent policy changes at USFS and the increased use of Categorical Exclusions have drastically reduced the share of USFS projects that get published and/or invite public comment. This means many projects can only be discovered by the public through field monitoring, long after the project has been planned, approved, and contracted.
If your local forests are not yet being tracked, submit feedback using the link above to request the expanded coverage.
There is no 'alert' feature at this time, so check back regularly to learn about new projects and opportunity to comment.
The project is designed to increase community/infrastructure protection, improve wildfire containment opportunities, and improve vegetation resilience to environmental stressors. A notice of Emergency Situation Determination approval has been posted. Comments will be accepted from June 24-30, 2026.
📍 Los Padres National Forest🏷 Fuels management · Vegetation management (other than forest products) · Watershed management · Wildlife, fish, rare plantsAdded: 2026-05-28
3 Days Left to Comment
Taking Comments Now!6/30/26 11:59 PM PDT
Developing Proposal
Milestone
Date
NEPA Start Date
7/29/2022
Finding/Decision Date
—
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
2025 Mt. Baker Geothermal Consent to Lease
To explore or develop geothermal resources on National Forest lands, the USFS must consent to lease areas nominated by the BLM. This analysis does not authorize ground disturbance, but creates stipulations for authorized leasing areas. https://usfs-public.box.com/s/r56gzyn1msyfvj8md81arv1mo15tgoso
**Please consider personalizing to increase impact**
I support renewable energy, including geothermal energy, but I am concerned that this project has not been fully evaluated for its environmental impacts. Because the project is near sensitive wilderness, steep terrain, and important streams, it should undergo a more complete environmental review before any lease is issued.
My main concerns are:
• The project could affect local streams, groundwater, and fish habitat.
• Drilling and construction could require new roads, heavy equipment access, and year-round traffic in a fragile area.
• The project could disturb wilderness character, wildlife habitat, and the scenic quality of the area.
• The project should not allow fracking in exploratory wells.
• Water for drilling and operations should not be taken from local streams; if water is needed, it should be brought in from municipal sources.
• Strong protections should be required for spills, blowouts, well failures, and site cleanup.
• The project should include clear financial responsibility, including a substantial bond, so cleanup and restoration are fully covered if something goes wrong.
• Any lease should be limited in time and should not remain open indefinitely.
A full Environmental Impact Statement should be prepared before any lease is finalized, and it should clearly spell out what activities will and will not be allowed. At a minimum, each leasing project should require a closed-loop geothermal system, no new roads in sensitive areas, no fracking, no local stream withdrawals, and full restoration of the site if the project does not proceed safely or successfully.
I support clean energy, but only if it can be developed without unnecessary harm to water, wildlife, wilderness values, and nearby communities.
📍 Mt. Baker Ranger District🏷 Minerals and geologyAdded: 2026-05-28
Developing Proposal
Milestone
Date
NEPA Start Date
9/10/2025
Finding/Decision Date
—
Significant Effect
Significant Effect
Mt. Baker-Snoqualmie National Forest
Forestwide Thinning Analysis
This analysis will streamline the implementation of commercial thinning treatments designed to increase structural diversity of overstocked and planted stands and provide a sustainable flow of timber to local communities.
📍 Mt. Baker-Snoqualmie National Forest🏷 Forest productsAdded: 2026-05-28
Developing Proposal
Milestone
Date
NEPA Start Date
9/3/2025
Finding/Decision Date
—
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
Martin Gap Restoration Thinning Project
This project aims to restore forest health and resilience, improve wildlife habitat, and support native plants that are important to Tribal communities by thinning and diversifying previously regenerated plantation stands.
The Pacific Northwest Region is collaborating with nine Forests to develop a region-wide project to protect whitebark pine trees (Pinus albicaulis) that have a high level of white pine blister rust resistance.
📍 R6 - Pacific Northwest Region All Units🏷 Wildlife, fish, rare plants · Vegetation management (other than forest products)Added: 2026-05-28
Developing ProposalCategorical Exclusion
Milestone
Date
Scoping Start
04/2023 (Estimated)
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Mixed Impact
Mixed Impact
Mt. Baker-Snoqualmie National Forest
South Fork Canyon Creek Road Bridge Removal and Footbridge Install
Removal of the failed FSR 41 road bridge over the South Fork of Canyon Creek and removal of earth abutments in the creekbed to restore natural hydrologic flow. Construction of a footbridge for access to the area north of the creek for recreation use.
The Darrington Ranger District proposes to replace a bridge on the Suiattle River Road to improve an important Chinook Salmon run and restore important salmon habitat for species.
Establishing Interim Direction for Oil & Gas Leasing Management
Amend the Los Padres Forest Plan and the Southern California Forest Plan to establish interim direction for processing new lease applications for oil and gas, and remove references to and withdraw the 2005 Oil and Gas Record of Decision. https://usfs-public.box.com/s/8hb9zdav0fv3huge15oga4bzaec0yji6
📍 Los Padres National Forest🏷 Land management planningAdded: 2026-05-28
Developing ProposalCategorical Exclusion
Milestone
Date
NEPA Start Date
12/4/2025
Finding/Decision Date
—
Significant Effect
Significant Effect
Los Padres National Forest
Mount Pinos Forest Health Project - PALS #58380
Healthy Forest thinning project designed to improve the health and vigor of the existing stands and to make the stands more resilient to stressors such as drought, insects & wildfire.